My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3 SR 04-18-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
04-18-2022
>
7.3 SR 04-18-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2022 12:37:20 PM
Creation date
4/15/2022 12:22:35 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S' TRAFFIC SOLUTIONS <br />Table 2 <br />Peak Hour Operations at TH 10 & Lowell Avenue NW <br />Scenario <br />AM Peak <br />LOS/Delay per driver (sec) <br />Queue(ft) <br />Existing <br />Overall LOS a (0.4 see)/Worst Movement LOS a (nbr 8.0 see) <br />NBR Q is 34 ft <br />Build w/Caribou <br />Overall LOS a (0.8 see)/Worst Movement LOS a (nbr 9.4 see) <br />NBR Q is 61 ft <br />1. Overall and worst movement LOS reported from SimTraffic simulation delay results, lower case letters represent stop controlled. <br />NBR is abbreviation for northbound right. <br />2. 95th percentile queues are a result from an average of 10 SimTraffic simulations. <br />The results shown in Table 2 indicate the overall operations of the study area intersection is providing <br />acceptable LOS with manageable vehicle queues that do not extend to the site driveway. <br />Conclusion <br />The proposed Caribou has appropriate access, and the site traffic will not result in poor operation or <br />excessive queuing on Lowell Avenue NW. Please contact Vernon Swing at vswin tr fickgmail.com or <br />612-968-4142 with any questions. <br />Attachments: Site Plan <br />5 I P a g e Caribou Coffee, Elk River, MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.