Laserfiche WebLink
Tar 20.705 <br />� Numbation#3 <br />EIk Ri <br />Terra Elk Riva F re Station #3 <br />Ci of Elk Riva <br />CONTINUATION SHEET AIA DOCUMENTG703 111-121111 <br />AIA Dow ment G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION N0: 14 <br />Contactor', signed-ifiation katt,,h,d. APPLICATION DATE: 3/31/22 <br />In tabu htion, below, amount, are stated to the -rest doll.r. PERIODTO 3/31/22 <br />Use Column I on Cont,- where variable mtainage for line items may apply. <br />A <br />I A.1 <br />B <br />C <br />C1 <br />C2 <br />C3 <br />D <br />E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G=C) <br />TO FINISH <br />(IFVARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />DOR E) <br />(D+E+F) <br />Klein Electric <br />16-1600 <br />26A <br />COff5 PRN10R <br />$ - <br />$ - <br />$ 1,875.00 <br />$ 1,875.00 <br />$ 526.00 <br />$ 1,349.00 <br />$ 1,875.00 <br />100.00% <br />$ - <br />$ 93.75 <br />Klein Electric <br />16-1600 <br />26A <br />COff6 PRff9R Elecrial Revisions <br />$ - <br />$ - <br />$ 2,370.00 <br />$ 2,370.00 <br />$ 1,660.00 <br />$ 1,660.00 <br />70.04% <br />$ 710.00 <br />$ 83.00 <br />Klein Electric <br />16-1600 <br />26A <br />COff7ASIff4RTower Light, <br />$ - <br />$ - <br />$ 8,136.00 <br />$ 8,136.00 <br />$ 4,068.00 <br />$ 2,441.00 <br />$ 6,509.00 <br />80.00% <br />$ 1,627.00 <br />$ 325.45 <br />Klein Electric <br />16-1600 <br />26A <br />COff8PRfi17SCBACompres,or <br />$ - <br />$ - <br />$ 1,354.00 <br />$ 1,354.00 <br />$ 1,016.00 <br />$ 203.00 <br />$ 1,219.00 <br />90.03% <br />$ 135.00 <br />$ 60.95 <br />Klein Electric <br />16-1600 <br />26A <br />COff9 RFIfi117 <br />$ - <br />$ - <br />$ 983.00 <br />$ 983.00 <br />$ 737.00 <br />$ 246.00 <br />$ 983.00 <br />100.00% <br />$ - <br />$ 49.15 <br />Klein Electric <br />16-1600 <br />26A <br />COfi10 RFIfi118Automatic Push Pad <br />$ - <br />$ - <br />$ 437.00 <br />$ 437.00 <br />$ 328.00 <br />$ 328.00 <br />75.06% <br />$ 109.00 <br />$ 16.40 <br />Klein Electric <br />16-1600 <br />26A <br />CO#11 RFlff156 <br />$ - <br />$ - <br />$ 698.00 <br />$ 698.00 <br />$ - <br />$ 698.00 <br />$ 698.00 <br />100.00% <br />$ - <br />$ 34.90 <br />Klein Electric <br />16-1600 <br />26A <br />COfi12ASI#11 Wellness Room Light Fature <br />$ - <br />$ - <br />$ 1,319.00 <br />$ 1,319.00 <br />$ - <br />$ 660.00 <br />$ 660.00 <br />50.04% <br />$ 659.00 <br />$ 33.00 <br />Klein Electric <br />16-1600 <br />26A <br />COff13 RFIfi160 <br />$ - <br />$ - <br />$ 3,394.00 <br />$ 3,394.00 <br />$ 875.00 <br />$ 2,450.00 <br />$ 3,325.00 <br />97.97% <br />$ 69.00 <br />$ 166.25 <br />Klein Electric <br />16-1600 <br />26A <br />COfi14 RFIf21Added Cirwit,&Unit Heaters <br />$ - <br />$ - <br />$ 1,120.00 <br />$ 1,120.00 <br />$ 1,120.00 <br />$ 1,120.00 <br />100.00% <br />$ - <br />$ 56.00 <br />Klein Electric <br />16-1600 <br />26A <br />COff15 G9 Light Fature <br />$ - <br />$ - <br />$ 395.00 <br />$ 395.00 <br />$ 395.00 <br />$ 395.00 <br />100.00% <br />$ - <br />$ 19.75 <br />Klein Electric <br />16-1600 <br />26A <br />COfi160mrtting Tech Conduit Run, From ADD Bay <br />$ - <br />$ - <br />$ (1,439.00) <br />$ (1,439.00) <br />$ (1,439.00) <br />$ (1,439.00) <br />100.00% <br />$ - <br />$ (71.95) <br />Dryden Exavating <br />31-1000 <br />31A <br />Mobilization, Bond, SWPP Permit <br />$ 7,000.00 <br />$ - <br />$ - <br />$ 7,000.00 <br />$ 6,300.00 <br />$ 6,300.00 <br />90.00% <br />$ 700.00 <br />$ 315.00 <br />Dryd onExa vati ng <br />31-1000 <br />31A <br />Bituminous Saw Cutting fa bor <br />$ 2,105.00 <br />$ - <br />$ - <br />$ 2,105.00 <br />$ 2,105.00 <br />$ 2,105.00 <br />100.00% <br />$ - <br />$ 105.25 <br />Dryden Exavating <br />31-1000 <br />31A <br />Bituminous Removal Labor <br />$ 3,640.00 <br />$ - <br />$ - <br />$ 3,640.00 <br />$ 3,640.00 <br />$ 3,640.00 <br />100.00% <br />$ - <br />$ 182.00 <br />Dryd onExavati ng <br />31-1000 <br />31A <br />Concrete S-Cutting tabor <br />$ 160.00 <br />160.00 <br />$ 160.00 <br />$ 160.00 <br />100.00% <br />$ - <br />$ 8.00 <br />Dryden Ex -ting <br />31-1000 <br />31A <br />Concrete Removal Labor <br />$ 3,236.00 <br />$ - <br />$ - <br />$ 3,236.00 <br />$ 3,236.00 <br />$ 3,236.00 <br />100.00% <br />$ - <br />$ 161.80 <br />Dryden Exavati ng <br />31-1000 <br />31A <br />Tree Protection tabor <br />$ 75.00 <br />$ - <br />$ - <br />$ 75.00 <br />$ 75.00 <br />$ 75.00 <br />100.00% <br />$ - <br />$ 3.75 <br />Dryd on Exavating <br />31-1000 <br />31A <br />Clearing&Grabbing tabor <br />$ 2,100.00 <br />$ - <br />$ - <br />$ 2,100.00 <br />$ 2,100.00 <br />$ 2,100.00 <br />100.00% <br />$ - <br />$ 105.00 <br />Dryden Exavati ng <br />31-1000 <br />31A <br />Topsoil Stripping & Emb. Labor <br />$ 1,386.00 <br />$ - <br />$ - <br />$ 1,386.00 <br />$ 1,386.00 <br />$ 1,386.00 <br />100.00% <br />$ - <br />$ 69.30 <br />Dryd on Exavating <br />31-1000 <br />31A <br />Export Exces,Top,oil tabor <br />$ 14,055.00 <br />$ - <br />$ - <br />$ 14,055.00 <br />$ 14,055.00 <br />$ 14,055.00 <br />100.00% <br />$ - <br />$ 702.75 <br />Dryd onExavati ng <br />31-1000 <br />31A <br />Site Gading tabor <br />$ 56,076.01 <br />$ - <br />$ - <br />$ 56,076.01 <br />$ 42,834.04 <br />$ 42,834.04 <br />76.39% <br />$ 13,241.97 <br />$ 2,141.70 <br />Dryden Exavating <br />31-1000 <br />31A <br />Site Gading Material <br />$ 14,040.00 <br />$ - <br />$ - <br />$ 14,040.00 <br />$ 14,040.00 <br />$ 14,040.00 <br />100.00% <br />$ - <br />$ 70200 <br />Dryden Exa vati ng <br />31-1000 <br />31A <br />Exc. & Backfill Foundation, <br />$ 25,378.00 <br />$ - <br />$ - <br />$ 25,378.00 <br />$ 25,378.00 <br />$ 25,378.00 <br />100.00% <br />$ - <br />$ 1,268.90 <br />Dryd on Exavating <br />31-1000 <br />31A <br />Building Sand Chi o n tabor <br />$ 3,298.00 <br />$ - <br />$ - <br />$ 3,298.00 <br />$ 3,141.60 <br />$ 3,141.60 <br />95.26% <br />$ 156.40 <br />$ 157.08 <br />Dryd onExavati ng <br />31-1000 <br />31A <br />Bu ild i ng Sand Cush ion Materil <br />$ 629.00 <br />$ - <br />$ - <br />$ 629.00 <br />$ - <br />$ - <br />0.00% <br />$ 629.00 <br />$ - <br />Dryden Exavating <br />31-1000 <br />31A <br />Class5 Labor <br />$ 9,014.00 <br />$ - <br />$ - <br />$ 9,014.00 <br />$ - <br />$ - <br />0.00% <br />$ 9,014.00 <br />$ - <br />Dryden Exavati ng <br />31-1000 <br />31A <br />ClassS Material <br />$ 7,854.00 <br />$ - <br />$ - <br />$ 7,854.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,854.00 <br />$ - <br />Dryden Exavating <br />31-1000 <br />31A <br />Subgade Prep Labor <br />$ 8,595.00 <br />$ - <br />$ - <br />$ 8,595.00 <br />$ 4,297.50 <br />$ 4297.50 <br />50.00% <br />$ 4,197.50 <br />$ 114.11 <br />Dryden Exavati ng <br />31-1000 <br />31A <br />Dewatering tabor <br />$ 2,625.00 <br />$ - <br />$ - <br />$ 2,625.00 <br />$ 2,625.00 <br />$ 2:625.00 <br />100.00% <br />$ - <br />$ 131.25 <br />Dryden Exavating <br />31-1000 <br />31A <br />SWPP Permit <br />$ 525.00 <br />$ - <br />$ - <br />$ 525.00 <br />$ 525.00 <br />$ 525.00 <br />100.00% <br />$ - <br />$ 26.25 <br />Dryd onExavati ng <br />31-1000 <br />31A <br />Silt Fence tabor <br />$ 2,240.00 <br />2,240.00 <br />$ 2'240.00 <br />$ 2,240.00 <br />100.00% <br />$ - <br />$ 112.00 <br />Dryd on Exavating <br />31-1000 <br />31A <br />Silt Fence Ma-ial <br />$ 700.00 <br />$ - <br />$ - <br />$ 700.00 <br />$ 700.00 <br />$ 700.00 <br />100.00% <br />$ - <br />$ 35.00 <br />Dryden Exavati ng <br />31-1000 <br />31A <br />Inlet Protection tabor <br />$ 2,502.00 <br />$ - <br />$ - <br />$ 2,502.00 <br />$ 2,502.00 <br />$ 2,502.00 <br />100.00% <br />$ - <br />$ 125.10 <br />Dryden Exavating <br />31-1000 <br />31A <br />Co nl,uaion Entance Labor <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />100.00% <br />$ - <br />$ 100.00 <br />Dryden Exavati ng <br />31-1000 <br />31A <br />Con-aion Entance Materials <br />$ 100.00 <br />$ - <br />$ - <br />$ 100.00 <br />$ 100.00 <br />$ 100.00 <br />100.00% <br />$ - <br />$ 5.00 <br />Dryd onExavating <br />31-1000 <br />31A <br />Hyd ro Seed <br />$ 1,166.00 <br />$ - <br />$ - <br />$ 1,166.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,166.00 <br />$ - <br />Dryden Exavati ng <br />31-1000 <br />31A <br />Flex Mat tabor <br />$ 700.00 <br />$ - <br />$ - <br />$ 700.00 <br />0.00% <br />$ 700.00 <br />$ - <br />Dryden Exavating <br />31-1000 <br />31A <br />Flex Mat Material <br />$ 3,266.00 <br />$ - <br />$ - <br />$ 3,266.00 <br />$ 3,260.00 <br />$ 3,260.00 <br />99.82% <br />$ 6.00 <br />$ 163.00 <br />Dryden Exavati ng <br />31-1000 <br />33A <br />Mobilization, Bond, Permits <br />$ 20,504.16 <br />$ - <br />$ - <br />$ 20:504. 16 <br />$ 18:453.74 <br />$ 18,453.74 <br />90.00% <br />$ 2,050.42 <br />$ 922.69 <br />Dryd on Exavating <br />31-1000 <br />33A <br />Water Uti lities fa bo r <br />$ 25,719.19 <br />25,719.19 <br />$ 25,719.19 <br />$ 25,719.19 <br />100.00% <br />$ - <br />$ 1,285.96 <br />Dryd onExavati ng <br />31-1000 <br />33A <br />Water Utilities Material <br />$ 52,306.23 <br />$ - <br />$ - <br />$ 52,306.23 <br />$ 52,306.23 <br />$ 52,306.23 <br />100.00% <br />$ - <br />$ 2,615.31 <br />Dryd on Exavating <br />31-1000 <br />33A <br />Wet Tap La bor <br />$ 239.22 <br />$ - <br />$ - <br />$ 239.22 <br />$ 239.22 <br />$ 239.22 <br />100.00% <br />11.96 <br />Dryden Exavating <br />31-1000 <br />33A <br />Wet Tap Material <br />$ 2,500.00 <br />2,500.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />100.00% <br />$ - <br />$ 125.00 <br />Dryd on Exavating <br />31-1000 <br />33A <br />Sanitary Piping to bor <br />$ 9,667.77 <br />$ - <br />$ - <br />$ 9,667.77 <br />$ 9,667.77 <br />$ 9,667.77 <br />100.00% <br />$ - <br />$ 483.39 <br />Dryden Exavating <br />31-1000 <br />33A <br />San it n, Piping Material <br />$ 9,62235 <br />$ - <br />$ - <br />$ 9,62235 <br />$ 9,62235 <br />$ 9,622.35 <br />100.00% <br />$ - <br />$ 481.12 <br />Dryden Exavating <br />31-1000 <br />33A <br />Sanitary Manholes Labor <br />$ 1,808.00 <br />$ - <br />$ - <br />$ 1,808.00 <br />$ 1,808.00 <br />$ 1,808.00 <br />100.00% <br />$ - <br />$ 90.40 <br />Dryd onExavati ng <br />31-1000 <br />33A <br />San ita ry Manholes Material <br />$ 9,425.00 <br />$ - <br />$ - <br />$ 9,425.00 <br />$ 9:425.00 <br />$ 9,425.00 <br />100.00% <br />$ - <br />$ 471.25 <br />Dryd on Exavating <br />31-1000 <br />33A <br />Manhole Casting, La bor <br />$ 691.20 <br />$ - <br />$ - <br />$ 691.20 <br />$ 691.20 <br />$ 691.20 <br />100.00% <br />$ - <br />$ 34.56 <br />Dryd onExavati ng <br />31-1000 <br />33A <br />Manhole Castings Material <br />$ 1,140.00 <br />$ - <br />$ - <br />$ 1,140.00 <br />$ 1,103.80 <br />$ 1,103.80 <br />96.82% <br />$ 36.20 <br />$ 55.19 <br />Dryden Exavating <br />31-1000 <br />33A <br />Storm -PVC Piping Labor <br />$ 8,024.15 <br />$ - <br />$ - <br />$ 8,024.15 <br />$ 7,073.34 <br />$ 7,073.34 <br />88.15% <br />$ 950.81 <br />$ 353.67 <br />Dryden Exavati ng <br />31-1000 <br />33A <br />Storm -PVC Piping Material <br />$ 10,992.34 <br />$ - <br />$ - <br />$ 10,992.34 <br />$ 10,992.34 <br />$ 10,992.34 <br />100.00% <br />$ - <br />$ 549.62 <br />Dryden Exavating <br />31-1000 <br />33A <br />Storm -Concrete Piping/Manholes Labor <br />$ 10,155.38 <br />$ - <br />$ - <br />$ 10,155.38 <br />$ 10,155.38 <br />$ 10,155.38 <br />100.00% <br />$ - <br />$ 507.77 <br />Dryd en Excavat i ng <br />31-1000 <br />33A <br />Storm -Concrete Piping/Manholes Material <br />$ 27,063.60 <br />$ - <br />$ - <br />$ 27,063.60 <br />$ 27,063.60 <br />$ 27,063.60 <br />100.00% <br />$ - <br />$ 1,353.18 <br />Dryd on Excavating <br />31-1000 <br />33A <br />Storm - Castings/Grates Labor <br />$ 3,152.40 <br />$ - <br />$ - <br />$ 3,152.40 <br />$ 2,887.40 <br />$ 2,887.40 <br />91.59% <br />$ 265.00 <br />$ 144.37 <br />Dryd onExcavat i ng <br />31-1000 <br />33A <br />Storm-Castings/Grates Material <br />$ 52,068.00 <br />$ - <br />$ - <br />$ 52,068.00 <br />$ 52,068.00 <br />$ 52,068.00 <br />100.00% <br />$ - <br />$ 2,603.40 <br />Dryden Excavating <br />31-1000 <br />33A <br />COfil Additional Construction Entrances <br />$ - <br />$ - <br />$ 4,246.61 <br />$ 4,246.61 <br />$ 4,246.61 <br />$ 4,246.61 <br />100.00% <br />$ - <br />$ 212.33 <br />Dryd onExavati ng <br />31-1000 <br />33A <br />CON2 PRff7 Water Service <br />$ - <br />$ - <br />$ (1,517.19) <br />$ (1,517.19) <br />$ (1,517.19) <br />$ (1,517.19) <br />100.00% <br />$ - <br />$ (75.86) <br />Page 7 / 8 <br />