Laserfiche WebLink
Tar <br />Elk River F re 3�ion #3 <br />EIk Rid Fire Station <br />Terra <br />Ci of Elk River <br />CONTINUATION SHEET AIA DOCUMENTG703 111-121111 <br />AIA Dow ment G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION N0: 14 <br />Contactor', signed-ifiwtion is attached. APPLICATION DATE: 3/31/22 <br />In tabu htion, below, amount, are stated to the new rest doll.r. PERIODTO 3/31/22 <br />Use Column I on Cont,- where variable mtainage for line items may apply. <br />A <br />I A.1 <br />B <br />C <br />C1 <br />C2 <br />C3 <br />D <br />E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G=C) <br />TO FINISH <br />(IFVARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />DOR E) <br />(D+E+F) <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />C014 Eye Wash Station <br />$ - <br />$ - <br />$ (949.00) <br />$ (949.00) <br />$ (949.00) <br />$ (949.00) <br />100.00% <br />$ - <br />$ (47.45; <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CONS PRN175CBA Compressor <br />$ - <br />$ - <br />$ 1,790.00 <br />$ 1,790.00 <br />$ 1,790.00 <br />$ 1,790.00 <br />100.00% <br />$ - <br />$ 89.50 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CON6 RFIN107 <br />$ - <br />$ - <br />$ (213.00) <br />$ (213.00) <br />$ (213.00) <br />$ (213.00) <br />100.00% <br />$ - <br />$ (10.65) <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />C0N7 RFIN121 <br />(250.00) <br />$ (250.00) <br />$ (250.00) <br />$ (250.00) <br />100.00% <br />$ - <br />$ (12.50) <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CON8PRN13Steam Genewtor <br />$ - <br />$ - <br />$ 8,342.00 <br />$ 8,342.00 <br />$ 4,171.00 <br />$ 752.00 <br />$ 4,913.00 <br />59.01% <br />$ 3,419.00 <br />$ 146.15 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CON9 Duct ln,ulation Replacement (Carp Allow.-)$752 <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />NDIV/01- <br />PetersonSheetMetal <br />15-1500 <br />22A <br />CO 110 Ad ded PVC l n,ua Itio n <br />$ - <br />$ - <br />$ 723.00 <br />$ 723.00 <br />$ - <br />$ 723.00 <br />$ 723.00 <br />100.00% <br />$ - <br />$ 36.15 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CONll Bay Duct Relo-ion due to Air Drop <br />$ - <br />$ - <br />$ 5,688.00 <br />$ 5,688.00 <br />$ - <br />$ 5,688.00 <br />$ 5,688.00 <br />100.00% <br />$ - <br />$ 284.40 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CON12 PRN22 <br />$ - <br />$ - <br />$ 709.00 <br />$ 709.00 <br />$ - <br />$ 709.00 <br />$ 709.00 <br />100.00% <br />$ - <br />$ 35.45 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CONI3 CMU Patch work for Duct 139 Twining Room <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />NDIV/01- <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO 114 RFIN183 Revised Exhaust Air Regirter Size <br />$ - <br />$ - <br />$ 2,503.00 <br />$ 2,503.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,503.00 <br />$ - <br />PetersonSheetMetal <br />15-1500 <br />22A <br />CONI5 RFIN139 Credit for Duct Protection <br />$ - <br />$ - <br />$ (470.00) <br />$ (470.00) <br />$ - <br />$ - <br />0.00% <br />$ (470.00) <br />$ - <br />Summit Fire <br />15-1533 <br />21A <br />tabor <br />$ 18,200.00 <br />$ - <br />$ - <br />$ 18,200.00 <br />$ 18,200.00 <br />$ 18,200.00 <br />100.00% <br />$ - <br />$ 910.00 <br />Summit Fire <br />15-1533 <br />21A <br />Material <br />$ 22,800.00 <br />$ - <br />$ - <br />$ 22,800.00 <br />$ 22,800.00 <br />$ 22,800.00 <br />100.00% <br />$ - <br />$ 1,140.00 <br />So"'it Fire <br />15-1533 <br />21A <br />Design <br />$ 3,200.00 <br />$ - <br />$ - <br />$ 3,200.00 <br />$ 3,200.00 <br />$ 3,200.00 <br />100.00% <br />$ - <br />$ 160.00 <br />Summit Fire <br />15-1533 <br />21A <br />Fabrication <br />$ 2,600.00 <br />$ - <br />$ - <br />$ 2,600.00 <br />$ 2,600.00 <br />$ 2,600.00 <br />100.00% <br />$ - <br />$ 130.00 <br />Summit Fire <br />15-1533 <br />21A <br />Bond <br />$ 800.00 <br />$ - <br />$ - <br />$ 800.00 <br />$ 800.00 <br />$ 800.00 <br />100.00% <br />$ - <br />$ 40.00 <br />Summit Fire <br />15-1533 <br />21A <br />CONIASIN9 Redesigned Sprinkler Layout <br />$ - <br />$ - <br />$ 820.00 <br />$ 820.00 <br />$ 820.00 <br />$ 820.00 <br />100.00% <br />$ - <br />$ 41.00 <br />Klein Electric <br />16-1600 <br />26A <br />Elec H,.1-Permit <br />$ 1,325.00 <br />$ - <br />$ - <br />$ 1,325.00 <br />$ 1,325.00 <br />$ 1,325.00 <br />100.00% <br />$ - <br />$ 66.25 <br />Klein Electric <br />16-1600 <br />26A <br />ElectricakBond <br />$ 4,347.00 <br />$ - <br />$ - <br />$ 4,347.00 <br />$ 4,347.00 <br />$ 4,347.00 <br />100.00% <br />$ - <br />$ 217.35 <br />Klein Electric <br />16-1600 <br />26A <br />Mobilization <br />$ 22,936.00 <br />$ - <br />$ - <br />$ 22,936.00 <br />$ 22,936.00 <br />$ 22,936.00 <br />100.00% <br />$ - <br />$ 1,146.80 <br />Klein Electric <br />16-1600 <br />26A <br />Temp Power/Job Twiler <br />$ 1,710.00 <br />$ - <br />$ - <br />$ 1,710.00 <br />$ 1,368.00 <br />$ 1,368.00 <br />80.00% <br />$ 342.00 <br />$ 68.40 <br />Klein Electric <br />16-1600 <br />26A <br />Temp Power/Site <br />$ 3,325.00 <br />$ - <br />$ - <br />$ 3,325.00 <br />$ 2,660.00 <br />$ 2,660.00 <br />80.00% <br />$ 665.00 <br />$ 133.00 <br />Klein Electric <br />16-1600 <br />26A <br />Temp Power/Building <br />$ 3,325.00 <br />$ - <br />$ - <br />$ 3,325.00 <br />$ 2,661.00 <br />$ 2,661.00 <br />80.03% <br />$ 664.00 <br />$ 133.05 <br />Klein Electric <br />16-1600 <br />26A <br />Switchgear Package/Gwybar Electric Co <br />$ 28,845.00 <br />$ - <br />$ - <br />$ 28,845.00 <br />$ 28,845.00 <br />$ 28,845.00 <br />100.00% <br />$ - <br />$ 1,442.25 <br />Klein Electric <br />16-1600 <br />26A <br />Utility Fee,/Elk River Public Utilities <br />$ 8,279.00 <br />$ - <br />$ - <br />$ 8,279.00 <br />$ 8,279.00 <br />$ 8,279.00 <br />100.00% <br />$ - <br />$ 413.95 <br />Klein Electric <br />16-1600 <br />26A <br />Utility Tw nsformer Pad Material <br />$ 1,045.00 <br />$ - <br />$ - <br />$ 1,045.00 <br />$ 1,045.00 <br />$ 1,045.00 <br />100.00% <br />$ - <br />$ 52.25 <br />Klein Electric <br />16-1600 <br />26A <br />Utility Tw nsforme r Pad Labor <br />$ 1,425.00 <br />$ - <br />$ - <br />$ 1,425.00 <br />$ 1,425.00 <br />$ 1,425.00 <br />100.00% <br />$ - <br />$ 71.25 <br />Klein Electric <br />16-1600 <br />26A <br />Service Entwnce Materhl <br />$ 4,834.00 <br />$ - <br />$ - <br />$ 4,834.00 <br />$ 4,834.00 <br />$ 4,834.00 <br />100.00% <br />$ - <br />$ 241.70 <br />Klein Electric <br />16-1600 <br />26A <br />Service Entwnce Labor <br />$ 3,827.00 <br />$ - <br />$ - <br />$ 3,827.00 <br />$ 3,827.00 <br />$ 3,827.00 <br />100.00% <br />$ - <br />$ 191.35 <br />Klein Electric <br />16-1600 <br />26A <br />Service Equipment M-ml <br />$ 2,776.00 <br />$ - <br />$ - <br />$ 2,776.00 <br />$ 2,776.00 <br />$ 2,776.00 <br />100.00% <br />$ - <br />$ 138.80 <br />Klein Electric <br />16-1600 <br />26A <br />Service Equipment tabor <br />$ 3,277.00 <br />$ - <br />$ - <br />$ 3,277.00 <br />$ 3,277.00 <br />$ 3,277.00 <br />100.00% <br />$ - <br />$ 163.85 <br />Klein Electric <br />16-1600 <br />26A <br />Power Panelboard, M-ml <br />$ 2,739.00 <br />$ - <br />$ - <br />$ 2,739.00 <br />$ 2,739.00 <br />$ 2,739.00 <br />100.00% <br />$ - <br />$ 136.95 <br />Klein Electric <br />16-1600 <br />26A <br />Power Panelboard, tabor <br />$ 2,856.00 <br />$ - <br />$ - <br />$ 2,856.00 <br />$ 2,856.00 <br />$ 2,856.00 <br />100.00% <br />$ - <br />$ 142.80 <br />Klein Electric <br />16-1600 <br />26A <br />Genewtor Package/Total Energy Systems <br />$ 79,282.00 <br />$ - <br />$ - <br />$ 79,282.00 <br />$ 7,928.00 <br />$ 16,049.00 <br />$ 23,977.00 <br />30.24% <br />$ 55,305.00 <br />$ 1,198.85 <br />Klein Electric <br />16-1600 <br />26A <br />Genewtor Pad Material <br />$ 1,235.00 <br />$ - <br />$ - <br />$ 1,235.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,235.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Genewtor Pad Labor <br />$ 1,710.00 <br />$ - <br />$ - <br />$ 1,710.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,710.00 <br />$ - <br />KleinElectric <br />16-1600 <br />26A <br />Genewtor M-ml <br />$ 1,562.00 <br />$ - <br />$ - <br />$ 1,562.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,562.00 <br />$ - <br />KleinElectric <br />16-1600 <br />26A <br />Genewtor tabor <br />$ 4,091.00 <br />$ - <br />$ - <br />$ 4,091.00 <br />$ - <br />$ - <br />0.00% <br />$ 4,091.00 <br />$ - <br />KleinElectric <br />16-1600 <br />26A <br />Genewtor Serivce Entwnce Material <br />$ 3,841.00 <br />$ - <br />$ - <br />$ 3,841.00 <br />$ 960.00 <br />$ 960.00 <br />24.99% <br />$ 2,881.00 <br />$ 48.00 <br />Klein Electric <br />16-1600 <br />26A <br />Genewtor Serivce Entwnce La bor <br />$ 3,599.00 <br />$ - <br />$ - <br />$ 3,599.00 <br />$ 900.00 <br />$ 900.00 <br />25.01% <br />$ 2,699.00 <br />$ 45.00 <br />Klein Electric <br />16-1600 <br />26A <br />ATS Equipment M-ml <br />$ 2,309.00 <br />$ - <br />$ - <br />$ 2,309.00 <br />$ 2,309.00 <br />$ 2,309.00 <br />100.00% <br />$ - <br />$ 115.45 <br />Klein Electric <br />16-1600 <br />26A <br />ATS Equipment tabor <br />$ 2,901.00 <br />$ - <br />$ - <br />$ 2,901.00 <br />$ 2,901.00 <br />$ 2,901.00 <br />100.00% <br />$ - <br />$ 145.05 <br />Klein Electric <br />16-1600 <br />26A <br />ES Panelboard, Material <br />$ 801.00 <br />$ - <br />$ - <br />$ 801.00 <br />$ 801.00 <br />$ 801.00 <br />100.00% <br />$ - <br />$ 40.05 <br />Klein Electric <br />16-1600 <br />26A <br />ES Panelboard, La bor <br />$ 1,146.00 <br />$ - <br />$ - <br />$ 1,146.00 <br />$ 1,146.00 <br />$ 1,146.00 <br />100.00% <br />$ - <br />$ 57.30 <br />Klein Electric <br />16-1600 <br />26A <br />Light FiMure Package/Viking Electric <br />$ 94,954.00 <br />$ - <br />$ - <br />$ 94,954.00 <br />$ 94,954.00 <br />$ 94,954.00 <br />100.00% <br />$ - <br />$ 4,747.70 <br />Klein Electric <br />16-1600 <br />26A <br />Fature M-ml <br />$ 6,196.00 <br />$ - <br />$ - <br />$ 6,196.00 <br />$ 4,957.00 <br />$ 4,957.00 <br />80.00% <br />$ 1,239.00 <br />$ 247.85 <br />Klein Electric <br />16-1600 <br />26A <br />Fature Labor <br />$ 21,162.00 <br />$ - <br />$ - <br />$ 21,162.00 <br />$ 16,929.00 <br />$ 4,000.00 <br />$ 20,929.00 <br />98.90% <br />$ 233.00 <br />$ 1,046.45 <br />Klein Electric <br />16-1600 <br />26A <br />Fature Control Material <br />$ 1,572.00 <br />$ - <br />$ - <br />$ 1,572.00 <br />$ 1,258.00 <br />$ 1,258.00 <br />80.03% <br />$ 314.00 <br />$ 62.90 <br />Klein Electric <br />16-1600 <br />26A <br />Fature Control tabor <br />$ 4,632.00 <br />$ - <br />$ - <br />$ 4,632.00 <br />$ 3,706.00 <br />$ 3,706.00 <br />80.01% <br />$ 926.00 <br />$ 185.30 <br />Klein Electric <br />16-1600 <br />26A <br />HVLS Fan/Big Ass Fa n, <br />$ 10,123.00 <br />$ - <br />$ - <br />$ 10,123.00 <br />$ 10,123.00 <br />$ 10,123.00 <br />100.00% <br />$ - <br />$ 506.15 <br />Klein Electric <br />16-1600 <br />26A <br />HVLS Fan Material <br />$ 313.00 <br />$ - <br />$ - <br />$ 313.00 <br />$ 94.00 <br />$ 94.00 <br />30.03% <br />$ 219.00 <br />$ 4.70 <br />Klein Electric <br />16-1600 <br />26A <br />HVLS Fan tabor <br />$ 878.00 <br />$ - <br />$ - <br />$ 878.00 <br />$ 263.00 <br />$ 263.00 <br />29.95% <br />$ 615.00 <br />$ 13.15 <br />Klein Electric <br />16-1600 <br />26A <br />Srte Pole Bases Material <br />$ 2,320.00 <br />$ - <br />$ - <br />$ 2,320.00 <br />$ 116.00 <br />$ 116.00 <br />5.00% <br />$ 2,204.00 <br />$ 5.80 <br />Klein Electric <br />16-1600 <br />26A <br />Srte Pole Bases tabor <br />$ 2,546.00 <br />$ - <br />$ - <br />$ 2,546.00 <br />$ 127.00 <br />$ 127.00 <br />4.99% <br />$ 2,419.00 <br />$ 6.35 <br />Klein Electric <br />16-1600 <br />26A <br />Srte Pole Underground Material <br />$ 2,318.00 <br />$ - <br />$ - <br />$ 2,318.00 <br />$ 116.00 <br />$ 116.00 <br />5.00% <br />$ 2,202.00 <br />$ 5.80 <br />Klein Electric <br />16-1600 <br />26A <br />Srte Pole Underground tabor <br />$ 3,041.00 <br />$ - <br />$ - <br />$ 3,041.00 <br />$ 152.00 <br />$ 152.00 <br />5.00% <br />$ 2,889.00 <br />$ 7.60 <br />Page 5 / 8 <br />