My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4 SR 04-18-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
04-18-2022
>
7.4 SR 04-18-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 1:42:45 PM
Creation date
4/14/2022 3:38:20 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K9 Country CIub Proj ect Narrative <br />We are requesting a conditional use permit of for the parcel#75-136-1103. VVith this permit we intend <br />to use our space to board canines in the pre-existing outbuildings. Located East of Cleveland we are in <br />an R-1-a Residential zone. This is typically reserved for agricultural use as well as we are outside any <br />currentTy piannec� uni� c�eveiopment Foca�ions wni%e s�ii� �eing c�ose enoug� to �eYp suppori t.�e <br />community. The main focus is overnight boarding and care, while also offering private dog park access <br />to previous customers. <br />We operate from 8am to 8pm. Sunday to Sunday. Day to day is preriy straight forward here on the <br />f��t. D�gs ��e e�� a�, gg�� p�� ��cs, ��� ��� �� e�gh�, �, €�, a�� etg��. Pr����ng <br />them with consistency, care, and plenty of distractions while their owners are away. For any new clients <br />we set up meet and greets through out the week. A rneet and greet typically takes about 1�-30 minutes. <br />For these we request that at some point prior to their stay, the owners bring in their pup for <br />introductions and to make sure they will fit our expectations. Aggressive, destructive, or unsocialized <br />dog� a�e ty�icail� te�ed ar�uay- <br />K9 Country Clubs employs two individuals, and a wiener dog. <br />Our space is set up for 2 parking spaces alongside our second drive. The second driveway is for access <br />directly to the outbuildin�s and is around 280 feet lon�. With an adjacent parking space near the <br />entrance to the dog park. We have plans in place to have Class 2 BufFLimestone put down in the <br />summer of 2022. These plans are in place for erosion control and prafessional aesthetic. <br />We had a screening of our site completed by a Local community service oi�icer in January of 2022. <br />Currently the property does not have any signage. We have talked about plans for a sign, but have made <br />no oi�icial decisions. A signage permit will be submitted when we are ready! <br />Outdoor storage will be unnecessary for the kennel side of our property. All animals, food, and <br />accessories will be stored inside the kennel. <br />Most issues surrounding erosion wiIl be taken care of by adding gravel to the driveway. Half way to the <br />back of the property where the land reaches it's lowest point. The previous owners, and the owners of <br />the property to the south, had a culvert insta.11ed to prevent water from backing up across the property <br />lines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.