My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.3 SR 04-04-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
04-04-2022
>
8.3 SR 04-04-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2022 4:53:56 PM
Creation date
4/1/2022 10:38:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/4/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDEPENDENT TESTING TECHNOLOGIES, INC. LOG OF SOIL BORING <br />PROJECT.' 19-406 THE BRIGGS COMPANIES DATE. 2/26/20 BORING #: SB-1 <br />JACKSON HILLS RESIDENTIAL SUITES START TIME. 1:30 END TIME. 2:00 <br />PHASE II- IV <br />ELK RIVER, MINNESOTA METHOD: 31/4" I.D. Hollow Stem Auaer <br />CREW. BH AR <br />LOCATION.' See Boring Location ELEVATION.' 106.4 Page 1 of 1 <br />Depth <br />ASTM <br />Soil <br />Sample <br />N <br />(Feet) <br />Symbol <br />Description <br /># <br />Value <br />Wn <br />Notes <br />PT <br />PEAT, organic, black. <br />2.5 <br />SP <br />POORLY GRADED SAND, medium grained, brown. <br />1 <br />11 <br />3.0 <br />5.0 <br />2 <br />8 <br />16.0 <br />V Water encountered 7' <br />during drilling. <br />greyish brown. <br />3 <br />2 <br />27.1 <br />10.0 <br />4 <br />19 <br />22.0 <br />Boring complete to 11.5 feet. <br />Water encountered at 7' during drilling. <br />Water not encountered to cave-in at 6' 11" after completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.