Laserfiche WebLink
EXHIBIT C <br />PUBLIC DEVELOPMENT COSTS <br />Complete site excavating for Jackson Street Apartments Phase 2 to include the following items <br />-Obtain and manage SWPPP <br />-Install perimeter erosion control and rock entrance <br />-Clear and Grub trees and brush <br />-Strip and salvage Black Dirt for respread <br />-Remove all unsuitable soils within Building and Parking lot per soil borings <br />-Import and place clean sand to replace unsuitable soils <br />-Subgrade site per plan <br />-Dig and Backfill footings <br />-Install drain tile around elevator pit and daylight into pond <br />-Install Sewer and Water per plan with dewatering <br />-Install Storm Sewer per plan (PVC pipe figured where storm crosses water) <br />-Install 4" Radon Rock after plumbing underground <br />-Import, Place and Tolerance Class 5 for pavement <br />-Final Grade all green spaces <br />- Infiltration Pond Work <br />- Dewatering site <br />- Civil & Geo Engineering <br />C-1 <br />EL185-70-769416.d7 <br />