My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.3 SR 04-04-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
04-04-2022
>
8.3 SR 04-04-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2022 4:53:56 PM
Creation date
4/1/2022 10:38:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/4/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />PUBLIC DEVELOPMENT COSTS <br />Complete site excavating for Jackson Street Apartments Phase 2 to include the following items <br />-Obtain and manage SWPPP <br />-Install perimeter erosion control and rock entrance <br />-Clear and Grub trees and brush <br />-Strip and salvage Black Dirt for respread <br />-Remove all unsuitable soils within Building and Parking lot per soil borings <br />-Import and place clean sand to replace unsuitable soils <br />-Subgrade site per plan <br />-Dig and Backfill footings <br />-Install drain tile around elevator pit and daylight into pond <br />-Install Sewer and Water per plan with dewatering <br />-Install Storm Sewer per plan (PVC pipe figured where storm crosses water) <br />-Install 4" Radon Rock after plumbing underground <br />-Import, Place and Tolerance Class 5 for pavement <br />-Final Grade all green spaces <br />- Infiltration Pond Work <br />- Dewatering site <br />- Civil & Geo Engineering <br />C-1 <br />EL185-70-769416.d7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.