Laserfiche WebLink
<br />Page 4 <br /> <br />Planning Commission Minutes <br />12/15/87 <br /> <br />. <br /> <br />6. THAT THE FIRE DEPARTMENT BE SUPPLIED WITH A KEY TO THE SECURITY <br />GATES PROPOSED ON THE SITE. <br /> <br />7. THAT NO PART OF THE SITE BE LEFT DIRT TO AVOID DUST. <br /> <br />o. THAT THE SECURITY rENCE BE PROVIDED AS SHOWN ON THE SITE PLAN. <br /> <br />9. THAT THE PARKING AREAS ON THE SITE BE LIT TO A MINIMUM OF 1-1/2 FOOT <br />CANDLES AND THAT THE LIGHTING BE DIRECTED AWAY FROM ADJACENT <br />RESIDENTIAL PROPERTY AND ROAD. RIGHT-OF-WAY. <br /> <br />10. THAT THE SHIPPING AND RECEIVING AND WASTE UNLOADING AREAS BE AS <br />SHOWN ON THE ATTACHED SITE PLAN BUT THE TANK FARM BE MOVED TO <br />PROV~DE THE ASH LOADING AREA WITH DIMENSIONS AS PER THE CITY <br />ORDINANCE. <br /> <br />11. THAT ALL OUTSIDE STORAGE BE SCREENED BY AN OPAQUE FENCE. ALSO NO <br />OUTSIDE STORAGE OF WASTE OR ASH IS PERMITTED. <br /> <br />12. THAT DUST. ODOR AND LITTER BE CONTROLLED AS OUTLINED IN ATLAS' <br />APPLICATION. <br /> <br />13. THAT FIRE EQUIPMENT AND PERSONNEL TRAINING BE AS OUTLINED IN ATLAS' <br />APPLICATION. <br /> <br />. 14. THAT WHICHEVER IS THE MORE RESTRICTIVE BETWEEN THE RESOURSE <br />CONSERVATION AND RECOVERY ACT (RCRA) STANDARD S OR THE MINNESOTA <br />POLLUTION CONTROL AGENCY (MPCA) STANDARDS FOR ATLAS' PERMIT BE USED <br />AS STANDARDS BY THE CITY ON ATLAS' AIR EMISSION. <br /> <br />15. THAT APPROVAL BY THE BUILDING AND ZONING ADMINISTRATOR IS REQUIRED <br />PRIOR TO ATLAS ACCEPTING DANGEROUS WASTE. <br /> <br />16. THAT THE 150 LBS/HOUR OF WASTE TEST INCINERATOR BE BROUGHT TO <br />MINIMUM OPERATING TEMPERATURE PRIOR TO BURNING WASTE. <br /> <br />17. THAT DIOXINS WILL BE TESTED FOR THE INITIAL 1500 LBS/ HOUR CONTRACT <br />INCINERATOR DURING A TEST BURN. THE MATERIAL TO BE BURNED AND THE <br />TIME TO BURN WILL TAKE CITY STAFF APPROVAL. THE DIOXINS THAT WILL <br />BE TESTED FOR IS 2378TCDD. ALSO. ANY ADDITIONAL INCINERATORS ADDED <br />WILL REQUIRE A SIMILAR TEST UNLESS THEY ARE THE SAME MODEL AS THE <br />INITIAL INCINERATOR. <br /> <br />18. THAT THE COUNCIL CONSIDER AN EIS PRIOR TO ATLAS EXPANDING TO BURNING <br />3000 LBS/HOUR OF WASTE. <br /> <br />19. THAT ATLAS IMMEDIATELY REPORT: 1) AN 8 HOUR AVERAGE BURN <br />TEMPERATURE OF LESS THAN 1800 F. IN THE SECONDARY CHAMBER 2) <br />EXCEEDING 200 PPM CO. 3) OPACITY ABOVE 20%. <br /> <br />. <br />