Laserfiche WebLink
<br /> <br /> <br /> <br />11. Please submit load sheets as soon as possible to assist with the purchase of transformers for the project. <br />We have been seeing long lead times for certain materials. <br />12. Is the building constructed on-site or pre-built and delivered on a trailer? <br /> <br />Please reach out with any questions regarding these comments. Any unaddressed comments will be <br />included as conditions of approval. <br /> <br /> <br />Sincerely, <br /> Zack Carlton <br />Planning Manager <br />763.635.1035 <br />