My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-03-1991 PC MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Minutes
>
1990 - 1999
>
1991
>
09-03-1991 PC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:30 AM
Creation date
9/12/2005 3:30:52 PM
Metadata
Fields
Template:
City Government
type
PCM
date
9/3/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 20 <br /> <br />. <br /> <br />Right now George, there is a bid being made right now regarding the <br />retaining wall. Gerry, in fact it should be done when we get back. The guy <br />is over there doing it now. <br /> <br />Bill - As soon as we get the dollar amount; Gerry, Howard and I will come to <br />terms on how its going to be paid for, which is not your concern, and then <br />as soon as we come to terms with that then will let the thing out and get <br />going. <br /> <br />Gerry - I think the next thing that needs to be addressed, I think we need <br />to address those side slopes. I see the problem, they drop off on the south <br />side. <br /> <br />Cliff, you can do it one or two ways; if your going to fill that lot, go <br />ahead and fill it with compaction and etc. Otherwise we need a 4 to 1 slope <br />or a retaining walls along with the erosion control, and it is not just the <br />back part, it is also the sides there to. <br /> <br />Gerry - I think on the north side it is pretty good. George, on that corner <br />here, that is pretty bad also. Gerry - is it! George, yes it is. <br /> <br />Bill - As you can see George. this is 988, that is the top of this wall and <br />his is at 988 here and it goes up to 989. <br /> <br />. George - So these will all flow together? <br /> <br />Bill - These two will flow together, then we got a wall...from the corner of <br />your wall it comes back and around and over. As I see here, there's just a <br />retaining wall to here on his lot. But these two are going to basically <br />kiss each other. <br /> <br />George - So what happens on Lot 9 then? Basically my lot is filled and then <br />it is going to drop off. <br /> <br />Gerry - Were going to be filling it as soon as we get approval from the City <br />to take dirt out of Outlot A. <br /> <br />Bill - That is going to be filled to reflect a maximum of 4 to 1 slope. <br />Your not going to have the cliff there when its built. <br /> <br />Cliff - As far as Outlot A, there may be problems with it and you should <br />deal with Steve Rohlf after the meeting on that. What were looking for on <br />these drawings for this home to close is your 4 to 1 slopes, erosion control <br />around the whole perimeter, not just the back, because we still have a lot <br />there that is empty. The silt that is already run down there, is there <br />going to be anything done with that? <br /> <br />Gerry - Is there silt that runs down there? <br /> <br />. <br /> <br />Cliff - All this fill has ended up down here and what we have done is kill <br />all the growth. Were still c going to have a lot of the problem down there <br />also. <br /> <br />Gerry - Lets take a look at it. <br />
The URL can be used to link to this page
Your browser does not support the video tag.