My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-03-1991 PC MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Minutes
>
1990 - 1999
>
1991
>
09-03-1991 PC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:30 AM
Creation date
9/12/2005 3:30:52 PM
Metadata
Fields
Template:
City Government
type
PCM
date
9/3/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Page 15 <br /> <br />This meets City standards it may not satisfy you - but it meets City <br />standards - Anything that you guys come up with for any thing different we <br />would want to review it again. <br /> <br />Cliff - that is correct. <br /> <br />Steve - So if you can get together and come up with something different, <br />revise the plan, Cliff will look at it again. <br /> <br />Cliff - It does address your lot, but what he is showing me right now is <br />everything is on this property and it meets the ordinance as far as our <br />slopes etc. and also he brought in a civil engineer for the retaining wall. <br />He is addressing what the ordinance has to say. He probably should address <br />this here - but I don't know what the slope is. <br /> <br />TAPE I SIDE II <br /> <br />Cliff - recorded along with this top soil and so forth. I am not sure, if <br />I would have given the permission or not - but I think Mr. Corman has to be <br />informed of what took place. <br /> <br />Cliff - Lot 5 and 6, Deerfield 4th - Any owners here? Lot 5 and 6 is <br />basically showing the retaining walls also, 4 to 1 slopes. He is also <br />showing the 3 to 1 slopes past that. The way I measured it out its showing <br />4 to 1 slopes or closer to 4 to 1. The biggest thing on there if we don't <br />disturb the vegetational growth that is already there, I think were going to <br />be better off as far as our man-made products being put on there, but he is <br />showing a nice 4 to 1 on there - silt fencing, diversion fencing. <br /> <br />Steve Rohlf - Jerry do you own 5 and 6 yet? <br /> <br />Jerry - Yes - Terry Hartman is the builder of H. E. Homes, he's Lot 4 - you <br />own Lot 5..Lot 6 is still a hole. <br /> <br />Cliff - Lot 5 is that the lot you just put the retaining wall on? <br /> <br />Scott Wold - That is the one you inspected last month. <br /> <br />Cliff - Lot 6 is still a hole. Who owns that one? <br /> <br />Jerry - We do. <br /> <br />Steve - So your responsible totally for the corrections on Lot 6. <br /> <br />Jerry - Yes 6 and 9 is a hole - those two are left. <br /> <br />Scott Wold/S. W. Wold Construction - I built the house on Lot 5 and Lot 7, <br />Block 1. <br /> <br />Cliff - Have you taken a look at what is on Lot 7 then as far as <br />corrections? <br />
The URL can be used to link to this page
Your browser does not support the video tag.