My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-23-1994 PC MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Minutes
>
1990 - 1999
>
1994
>
08-23-1994 PC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:29 AM
Creation date
9/9/2005 11:00:47 AM
Metadata
Fields
Template:
City Government
type
PCM
date
8/23/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Planning Commission Minutes <br />August 23, 1994 <br /> <br />Page 8 <br /> <br />14. DUST CONTROL <br /> <br /> <br />. <br /> <br />A. A PERMIT FROM MPCA REGARDING AIR EMISSIONS SHALL BE OBTAINED AND <br />PARTICULATE EMISSION STANDARDS SHALL BE MET BY THE OPERATION. <br /> <br />B. ALL EQUIPMENT SHALL BE LOCATED AS TO REDUCE DUST TO ADJACENT <br />RESIDENTIAL PROPERTIES. <br /> <br />C. WATER, BUT NO CHEMICAL AGENTS SHALL BE USED TO CONTROL DUST AS <br />NECESSARY. <br /> <br />D. THE CITY RESERVES THE RIGHT TO REQUIRE ADDITIONAL MEASURES BE TAKEN <br />IF WARRANTED BY DUST PROBLEMS INCLUDING, BUT NOT LIMITED TO, <br />REDUCING STOCK PILE HEIGHTS. <br /> <br />E. THE FIRST 100 FEET OF THE ACCESS ROAD PRIOR TO COUNTY ROAD 33 SHALL <br />ALSO BE PAVED TO MINIMIZE DUST. <br /> <br />15. TRAFFIC <br /> <br />A. <br /> <br />ALL TRAFFIC ASSOCIATED WITH THE OPERATION SHALL ONLY USE COUNTY <br />ROAD 33 BACK AND FORTH TO U.S. HIGHWAY 169. EXCEPT FOR LOCALIZED <br />JOBS, NO TRAFFIC FROM THIS OPERATION SHALL USE PROCTOR AVENUE OR <br />COUNTY ROAD 33 TO THE WEST OF THE SITE. A MAP SHALL BE PREPARED BY <br />CITY STAFF THAT DEFINES LOCALIZED JOBS. SHIEL Y SHALL POST NOTICE OF <br />THESE REQUIREMENTS AT THE EXIT FROM THEIR SITE. FAILURE TO CONTROL <br />TRAFFIC FROM THIS OPERATION SHALL CONSTITUTE A VIOLATION OF THIS <br />PERMIT. <br /> <br />. <br /> <br />B. AN ACCELERATION AND BY-PASS LANE SHALL BE CONSTRUCTED AT SHIELY'S <br />EXPENSE AND ON RIGHT-OF-WAY THEY DEDICATE TO SHERBURNE COUNTY <br />AS PER THE SPECIFICATIONS OF THE SHERBURNE COUNTY ENGINEER, PRIOR <br />TO HAULING ACTIVITIES COMMENCING. <br /> <br />C. THE LOCATION OF THE ACCESS TO THE SITE SHALL BE DETERMINED BY THE <br />SHERBURNE COUNTY ENGINEER. AN ACCESS PERMIT FROM SHERBURNE <br />COUNTY MAY BE REQUIRED OF THE OPERATOR. <br /> <br />D. THE OPERATOR SHALL REIMBURSE SHERBURNE COUNTY FOR ABNORMAL <br />WEAR ON (DAMAGE CAUSED BY OTHER THAN TRAFFIC FLOW THAT THE ROAD <br />WAS DESIGNED TO HANDLE) HAUL ROADS THAT IS CAUSED BY THE <br />OPERATION. <br /> <br />16. THE BERM ALONG COUNTY ROAD 33 IDENTIFIED IN THE OPERATOR'S PLANS, <br />SHALL BE CONSTRUCTED TO ACT AS A VISUAL SCREEN OF THE OPERATION. <br />THIS BERM SHALL BE BUILT AND LANDSCAPED WITHIN THE FIRST YEAR OF THE <br />MINES OPERATION ACCORDING TO A LANDSCAPED PLAN APPROVED BY <br />STAFF. <br /> <br />. <br /> <br />17. <br /> <br />WASH WATER USED IN THE OPERATION SHALL BE RECYCLED IN A TWO POND <br />SYSTEM ALLOWING FOR SEDIMENTATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.