Laserfiche WebLink
<br />Planning Commission Minutes <br />February 27, 1996 <br /> <br />Page 5 <br /> <br />. <br /> <br />property line between the Nord family property and this plat. Terry stated he is <br />aware of an agreement for watering purposes, but that he mentioned these <br />items in his memo so that they can be addressed before proceeding ahead <br />after final plat to construction. The assurances would be necessary for the City <br />to have the right to make those kinds of improvements. If not, the improvements <br />would be kept within the plat itself. <br /> <br />Steve explained the Park and Recreation Commission recommendation for the <br />location of the trail. Steve noted that the City made an agreement with the <br />Nords not to open up the trail until their property is developed. Mr. Nord asked <br />if additional right-of-way would be needed beyond the 70 feet presently. Terry <br />Maurer stated that the 70 feet would be adequate for the roadway trail. <br /> <br />Dave Anderson, 14845 County Road 30, Park and Recreation Commission <br />representative, noted Steve Ach's memo mentions a partly on road, partly off <br />road trail. He felt an entirely on-road trail (widened paved surface) will work in <br />this area. Dave added that a 50-75 foot width for a trail corridor is preferred. <br /> <br />There being no further comments from the public, Chair Dillon closed the public <br />hearing. <br /> <br />. <br /> <br />Discussion followed regarding the location of the existing home and stream. The <br />Commission reached a consensus that the developer try to reach a <br />compromise to satisfy both the City and the DNR, and that a variance would be <br />justifiable if it is the only workable solution. Steve indicated a meeting would be <br />scheduled with the DNR, the developer and City staff to address this issue. <br /> <br />COMMISSIONER THOMPSON MOVED THE PLANNING COMMISSION RECOMMEND <br />PRELIMINARY PLAT APPROVAL FOR NORDIC WOODS, AS REQUESTED BY RICK LUND, <br />PUBLIC HEARING CASE NO. P 95-8, CITING THERE WAS NO OPPOSITION DURING <br />THE PUBLIC HEARING, WITH THE FOLLOWING CONDITIONS: <br /> <br />1. A DEVELOPER'S AGREEMENT BE PREPARED OUTLINING THE TERMS AND <br />CONDITIONS FOR PLAT APPROVAL AND INSTALLATION OF IMPROVEMENTS. <br /> <br />2. COMMENTS OUTLINED IN THE CITY ENGINEER'S MEMO DATED 2/19/96, BE <br />ADDRESSED AND INCORPORATED INTO REVISED PLAT. <br /> <br />3. RECOMMENDATIONS FROM THE PARK AND RECREATION COMMISSION BE <br />INCORPORATED INTO APPROVAL FOR PRELIMINARY PLAT. <br /> <br />4. WATER AVAILABILITY CHARGE IN THE AMOUNT OF $300 PER LOT BE PAID TO <br />ELK RIVER UTILITIES PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. <br />DEVELOPER SHOULD CHECK WITH ELK RIVER UTILITIES FOR ANY ADDITIONAL <br />CHARGES RELATIVE TO WATER CONNECTION FEES. <br /> <br />5. SURFACE WATER MANAGEMENT FEE IN THE AMOUNT REQUIRED BY THE CITY <br />AT THE TIME OF FINAL PLAT BE PAID PRIOR TO RECORDING THE PLAT WITH <br />SHERBURNE COUNTY. <br /> <br />. <br />