My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1 ERMUSR 03-08-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2022
>
03-08-2022
>
5.1 ERMUSR 03-08-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 3:54:07 PM
Creation date
3/4/2022 3:54:07 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/8/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br />Document G701-.*+) <br /> !"#$%&'(%' <br />PROJECT:(Name and address)CONTRACT INFORMATION:CHANGE ORDER INFORMATION: <br />108820 Elk River Municipal Utilities - Contract For: Construction Manager at Change Order Number: 005 <br />Field Services BuildingRisk <br />Elk RiverDate: January 12, 2021Date: February 28, 2022 <br />OWNER:(Name and address)ARCHITECT:(Name and address)CONTRACTOR:(Name and address) <br />Elk River Municipal UtilitiesKodet Architectural Group LtdRJM Construction <br />1705 Main St.15 Groveland Terrace830 Boone Avenue North <br />Minneapolis, MN 55403Golden Valley, MN 55427 <br />Elk River, MN 55330 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives.) <br />PCO Owner-31 (Alternate #1 and Alternate #2 acceptance for painting) = $60,509.00 <br />Total = $60,509.00 <br />The original Guaranteed Maximum Price was $12,180,926.00 <br />The net change by previously authorized Change Orders$17,235.78 <br />The Guaranteed Maximum Price prior to this Change Order was$12,198,161.78 <br />The Guaranteed Maximum Price will be increased by this Change Order in the amount of$60,509.00 <br />The new Guaranteed Maximum Priceincluding this Change Order will be$12,258,670.78 <br />The Contract Time will be unchanged by Zero (0) days. <br />The new date of Substantial Completion will be 8/12/22 <br />NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Kodet Architectural Group LtdRJM ConstructionElk River Municipal Utilities <br />ARCHITECTRCHHHHHHHHHHITTECET(Firm name)(F(Firm irnaname)CONTRACTOR(Firm name)OWNER(Firm name) <br />SIGNATURESIGNATURESIGNATURE <br />Edward Daniel Kodet III, AIA Theresa Slominski <br />PRINTED NAME AND TITLEPRINTED NAME AND TITLEPRINTED NAME AND TITLE <br />03/01/2022 <br />DATEDATEDATE <br />- <br />AIA Document G701./+,*0Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. 5'6@76$%812 <br />92:(%(;(6!<$8'%(68(:-A@9-A('69B!&!-123@9 !2($18(C!8;762(:A1$6$6&%:(6$63($13671$D:12371#2!(46;:63E%('!ut permission. This document <br />1 <br />was produced by AIA software at 14:38:27 ET on 02/28/2022 under Order No.6631446434 which expires on 08/13/2022, is not for resale, is licensed for one-time <br />® <br />use only, and may only be used in accordance with the AIA Contract Documents Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (3B9ADA50) <br />209 <br />
The URL can be used to link to this page
Your browser does not support the video tag.