Laserfiche WebLink
KN I FE RIVER <br />AN MDU RESOURCES COMPANY <br />❑x Wetland Delineation (if wetlands are present) <br />April 7, 1997 Barr Engineering conducted a wetland delineation <br />0 Wetland Mitigation Plan (if wetlands are present) <br />o The wetland delineation and mitigation must be reviewed by the <br />Technical Evaluation Panel and revisions made prior to review by the <br />Planning Commission <br />Application Number WVCA 05-10 is on file with City of Elk River <br />❑x EAW/EIS Requirements NA <br />o The EAW/BIS process must be in concert with any application process. <br />The Planning Commission must comment on an EAW/EIS along with <br />an application. <br />❑x All submitted documents shall be: <br />o One (1) hard copy of all required drawings at a scale no smaller than <br />1"=50', and no larger than 24"x36" <br />o Two (2) sets of hard copies of required drawings at 11"x17" <br />o Provided in a digital format (e.g..pdf, .jpeg, .doc, Awg) at a resolution <br />of least 300 dpi. Flash drives, CD's, and email are acceptable. <br />o Folded (rolled drawings will not be accepted) <br />❑x All other information as determined by city staff <br />2 <br />