My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1 SR 02-22-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
02-22-2022
>
7.1 SR 02-22-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 4:20:16 PM
Creation date
2/17/2022 4:09:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 <br />Daily dust control is required when site is in use. This <br />requirement is the responsibility of the mine operator and <br />includes a requirement to notify all contractors working at <br />the site. Chemicals shall not be use for dust control. <br />d. A minimum of 100 feet must be paved from 225th Ave NW <br />into the pit. <br />e. The City reserves the right to require additional measures <br />to be taken, if warranted by dust problems, including but <br />not limited to reducing stock pile heights. <br />f. Installation of a cattle grid device at the entrance/exit is <br />required to prevent tracking into 225th Ave NW. <br />g. Annual approval of a maintenance agreement is required, <br />which will address street sweeping and ongoing <br />maintenance concerns. <br />(12) Hours of Operation <br />All mineral excavation, processing, and sales activities shall be <br />conducted between the normal hours of 7:00 a.m. and 7:00 p.m., <br />Monday through Saturday, except the hours for the hot -mix <br />asphalt plant can be extended by the Environmental <br />Administrator for special cases. <br />(13) Noise <br />a. As deemed necessary by city staff, noise from screening and <br />crushing associated with this Operation shall be controlled <br />by equipment location on site, the erection of sound <br />barriers, the placement of stockpiles, and the type of <br />equipment used. <br />b. Noise levels associated with this Operation shall at no time <br />exceed State standards. <br />C. The City reserves the right to require additional measures <br />be taken, if warranted by noise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.