Laserfiche WebLink
COST ISSUE DATE: 12/612021 <br />TO: Nick Schmidt PROJECT: 6484 Elk River YAC <br />Ebert Construction RE: PR #Mechanical Platform <br />23350 County Road 10 DATE: 11/30/2021 <br />Corcoran, MN 55357 TIME EXTENSION REQUESTED: <br />pESCRIPTON: <br />Install 24" plywood walkway and 30"x30" platform at mech equipment in attic for servicing per Inspector. <br />MATE I_ALIL_ ABOR BREAK -DOWN <br />AMOUNT <br />Carpenter Install walkway and platform. 5 hrs @ $95.00 hr = <br />Materials 2-pcs 4'x8'x3/4 plywood and misc framing. 1 L/S $110.00 US = <br />$475.00 <br />$110.00 <br />Total Cost $085.00 <br />TOTAL. ADDITIONAL COST: $585.00 <br />EBERT CONSTRUCTION <br />Prepared By: <br />Kevin Roehl <br />