Laserfiche WebLink
( i) <br />EBERT <br />CONSTRUCTION <br />Change Proposal PR0015 Price Breakdown <br />Continuation Sheet <br />Description: Unforeseen material and labor <br />Description <br />Project Superintendents <br />Thermal Insulation <br />Asphalt Paving <br />Labor Material Equipment Subcontract <br />$760.00 $132.57 <br />$475.00 $110.00 <br />$613.80 <br />$-4,920.00 <br />23350 County Road 10 <br />Corcoran, MN 55357 <br />Ph: 763-498-7844 <br />Other Price <br />$892.57 <br />$585.00 <br />$613.80 <br />$-4,920.00 <br />Subtotal: <br />$-2,828.63 <br />Self -Performed OH&P $1,477.57 15.00% <br />$221.64 <br />Sub -Performed OH&P $613.80 5.W% <br />$30.69 <br />Bond & Insurance -$2,576.30 <br />$0.00 <br />Total: <br />$-2,576.30 <br />Page 2 of 2 <br />