contours. <br />a. Also provided shall be detailed site drainage plans, including the detailing of the site's storm sewer <br />system with catchbasins and invert elevations. <br />b. Casting types must be shown for all catchbasins. <br />(10) Erosion control plan. Plans for site erosion control as required by the city engineer. <br />(11) Lightingplan. Plans showing location, height, and candlepower of all luminaries on the site. All parking lot <br />lighting standards located within the parking lot area must be located within parking lot islands. <br />(12) Staging plan. If the project is to be constructed in several stages, all stages shall be clearly detailed out on the <br />plan. This shall also include future expansion elements of a proposal. <br />(13) Sign plan. Plans showing all proposed signage for the site in accordance with chapter 24. <br />(14) Planned improvements summary. Calculation of the area, length, amount or other summary dimensions or <br />inventory for each improvement contemplated pursuant to this subsection (e), which calculation shall be <br />useful to the city planning department in determining the amount of the surety to be provided pursuant to <br />section 36-84. <br />(Code 1984, § 375:117(2)) <br />Sec. 36-83. - Procedure for review and approval. <br />(a) Generally. Except as otherwise provided in this section, all plans for site development within the city as described <br />in this chapter shall be subject to formal review and approval proceedings. <br />(1) Upon submission of the site plan as specified in section 36-82 the city staff shall circulate the plan to all <br />appropriate city, county, state, and federal agencies for their review and comment. <br />(2) Upon receipt of all agency reviews, a meeting between the applicant and all involved reviewers to discuss any <br />necessary plan amendments will be held. After the meeting, the applicant shall make any necessary revisions <br />and submit a final site plan. <br />(b) Final site plan. <br />(1) Purpose. The final site plan is to serve as a complete, thorough, and permanent public record of the manner <br />in which the subject site is to be developed. It shall incorporate all revisions and conditions resulting from the <br />site plan review process. <br />(2) Submission. Three copies of the final site plan shall be submitted to the director of community development <br />for review and approval. Subsequent to receiving approval of the final plan, the applicant may apply for a <br />building permit. <br />(3) Preconstruction meeting. After a building permit has been applied for, and before issuance thereof, a <br />preconstruction meeting shall be required to take place. It shall be the developer's responsibility to arrange <br />the preconstruction meeting with the city staff. At this meeting, the building construction plans will be <br />reviewed and compared with the approved final plan. If the building construction plans are not in substantial <br />conformance with the final plan, the building construction plans shall be revised to achieve such <br />conformance. <br />(4) Limitation on final site plan approval. Within one year after the approval of a final site plan, or such shorter <br />time as may be established by the approved development schedule, construction shall commence with the <br />approved plan. <br />