Laserfiche WebLink
SRF Comm No 13725.00 <br />H:\Projects\13000\13725\Design\Cost Estimates\13725_Trail Estimate_R1.xlsx <br />1 <br />SRF <br />SHERBURNE CO. CSAH 33 - CONCEPTUAL TRAIL COST <br />Concept Cost Estimate (based upon 2020 bid price information) <br />Prepared By: SRF Consulting Group, Inc., Revised December 30, 2021 <br />CSAH 33 Trail <br />Sherburne County <br />City of Elk River <br />ITEM DESCRIPTION <br />UNIT <br />UNIT <br />PRICE <br />EST. <br />QUANTITY <br />EST. <br />AMOUNT <br />COST <br />SPLIT <br />COST <br />SPLIT <br />PAVING AND GRADING COSTS <br />GrP 2a <br />12106 Common Embankment CV <br />cu. d. <br />6.00 <br />25 500 <br />153,000 <br />153 000 <br />GrP 4b <br />Bituminous Walk / Trail <br />1 <br />s d. <br />25.00 <br />10 340 <br />258 500 <br />258.500 <br />GrP 4c <br />IADA Pedestrian Curb Ram <br />each <br />1800.00 <br />8 <br />114,400 <br />14 400 <br />r <br />oncrete Curban utter <br />in. <br />Additional Tree Clearin /Grubbin to construct trail <br />acre <br />10000.00 <br />1.3 <br />13 000 <br />13 000 <br />SUBTOTAL PAVING AND GRADING COSTS: <br />$693,280 <br />$693,280 <br />DRAINAGE, UTILITIES AND EROSION CONTROL <br />Dr 5 Draina e - urban 1 30% <br />208 000 <br />$104,000 <br />$104,000 <br />SUBTOTAL DRAINAGE, UTILITIES AND EROSION CONTROL <br />$208,000 <br />$104,000 <br />$104,000 <br />RETAINING WALLS & OTHER MINOR STRUCTURAL COSTS <br />RW 1 <br />Box Culvert - <br />2 <br />lin. ft. <br />3.050 <br />20 <br />61.000 <br />61.000 <br />RW 2 <br />Cattle Pass <br />I In. ft. <br />300 <br />20 <br />6,000 <br />6 000 <br />RW 3 <br />Reinforced Soil Sloe RSS & Mod. Block Retainin Walls <br />3 <br />s d. <br />160 <br />950 <br />152 000 <br />30 400 <br />121 600 <br />KW 26 <br />are oc ravi a <br />scl. <br />SUBTOTAL RETAINING WALLS & OTHER MINOR STRUCTURAL COSTS: <br />$338,250 <br />$30,400 <br />$307,850 <br />LIGHTING COSTS <br />SGL 3 At Grade Intersection Li htin ermanent - non si nalized 4 each 18 000 <br />7 <br />126 000 <br />126,000 <br />SGL 4 Modif Liahtina Unit at TH 169 Exit Ram each I 10 000 11 <br />1.00 <br />$11D.UIDU <br />10 000 <br />SUBTOTAL LIGHTING COSTS: <br />$136,000 <br />$10,000 <br />$126,000 <br />SUBTOTAL CONSTRUCTION COSTS: $1,375,530 <br />$144,400 $1,231,130 <br />MISCELLANEOUS COSTS <br />M 2 Non uantified Minor Items 1 1 5% <br />70 000 <br />$8,000 <br />$62,000 <br />SUBTOTAL MISCELLANEOUS COSTS: <br />$70 000 <br />$8 000 <br />ji $62 000 <br />ESTIMATED TOTAL CONSTRUCTION COSTS without Contingency: <br />$1,445,530 <br />$152,400 $1,293,130 <br />1 lContingency or "risk" 15% <br />$217,0001 <br />$23,000 1 $194,000 <br />ESTIMATED TOTAL CONSTRUCTION COSTS PLUS CONTINGENCY: <br />$1,662,530 <br />$175,400 $1,487,130 <br />OTHER PROJECT COSTS: <br />RAN ACQUISITIONS (ADD. TEMP EASEMENT FOR TRAIL) <br />sq. ft. <br />$1.00 <br />70000 <br />1 $70,0001 <br />$70,000 <br />DESIGN ENGINEERING <br />Lump Sum <br />I $180,000 <br />1 <br />1 $180,0001 <br />$180,000 <br />SUBTOTAL OTHER PROJECT COSTS <br />1 $250,0001 <br />$250,000 <br />TOTAL PROJECT COST <br />L <br />1 $1,912,5301 <br />$175,400 <br />1 $1,737,130 <br />NOTE: <br />(1) 2.5' Bituminous and 6" aggregate base class 5 per Elk River Std Plt 2012 <br />(2) Does not include excavation. <br />(3) Additional cost for Reinforced Soil Slopes and/or smaller large block retaining walls are anticipated in key locations to reduce impacts to <br />wetlands and private properties. <br />(4) Intersection / Ped lighting, 7 "T intersections, 2 light units per intersection, separate service cabinets and equipment. <br />Estimate does NOT include any costs for Construction Administration. <br />PRINTED: 12/30/2021 12:32 PM <br />