My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.11 SR 02-07-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
02-07-2022
>
4.11 SR 02-07-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2022 10:38:04 AM
Creation date
2/4/2022 10:03:39 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/7/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRELIMINARY SCHEDULE "I" <br />Agreement No. 1046508 <br />City of Elk River <br />S.P. 7106-87 (T.H. 169=018) <br />Preliminary: January 10, 2022 <br />State Funds <br />Grading, bituminous and concrete paving, retaining walls, noise wall, lighting, signals, TMS, ADA improvements, <br />Bridges 71001, 71016, 71017, 71018, 71019, 71020 construction to start approximately April 2022 under <br />State Contract No. with <br />located on TH 169 from Mississippi River to 0.35 miles north of 197th Avenue; and on TH 101 from 0.22 miles south of Mississippi River to Mississippi River; <br />and on TH 10 from 0.45 miles west of TH 169 to 0.39 miles east of TH 169 <br />CITY COST PARTICIPATION <br />Totals <br />Sanitary Work Items (City Performed CE), From Sheet No. 2 <br />706,551.16 <br />Construction Engineering (5%) <br />35,327.56 <br />Subtotal <br />$741,878.72 <br />Sanitary Work Items (State Performed CE), From Sheet No. 2 <br />226,051.34 <br />Signal System Work Items, From Sheet No. 3 <br />89,600.00 <br />(2) State Furnished Materials (City Cost), From Sheet No. 3 <br />135,494.86 <br />Aesthetic Items: <br />(2) Signal System Painting, From Sheet No. 3 <br />42,444.00 <br />(1) Colored Concrete, From Sheet No. 4 <br />118,511.05 <br />(2) Bridge <br />5,356.25 <br />(2) Retaining Wall <br />66,260.00 <br />(2) Noise Wall <br />25,256.00 <br />Construction Subtotal <br />$708,973.50 <br />Construction Engineering (8%) <br />56,717.88 <br />Subtotal <br />$765,691.38 <br />(3) Total City Cost <br />$1,507,570.10 <br />(1) Amount as described in Article 5.2.C. of the Agreement <br />(2) Lump sum costs based on preliminary estimates <br />(3) Amount of advance payment as described in Article 6 of the Agreement (estimated amount) <br />Data is considered Non-public prior to project award. - 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.