My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.11 SR 02-07-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
02-07-2022
>
4.11 SR 02-07-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2022 10:38:04 AM
Creation date
2/4/2022 10:03:39 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/7/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MnDOT Contract No.: 1046508 <br />B. 100 Percent will be the City's rate of cost participation in all of the signal system construction. The <br />construction includes, but is not limited to, those construction items tabulated on Sheet No. 3 of the <br />Preliminary Schedule "I". <br />C. 100 Percent will be the City's rate of cost participation in all of the colored concrete construction. The <br />construction includes, but is not limited to, those construction items tabulated on Sheet No. 4 of the <br />Preliminary Schedule "I". The City will receive a credit for standard concrete walk, which will be <br />subtracted from the colored concrete costs. These costs will be based on estimated quantities and <br />construction contract unit prices. <br />5.3. State Furnished Materials. The State will furnish a signal cabinet and controller unit, video detection <br />system and video detection cameras ("State Furnished Materials"), according to the Project Plans, to <br />operate the traffic control signal systems covered under this Agreement. The City's lump sum share for <br />State Furnished Materials is $135,494.86. The City's cost share for State Furnished Materials will be added <br />to the City's total construction cost share as shown in the Schedule "I". <br />5.4. Construction Engineering Costs. The City will pay a construction engineering charge equal to 5 percent of <br />the total City participation construction covered under Article 5.2.A. The City will pay a construction <br />engineering charge equal to 8 percent of the remainder of the City participation construction covered <br />under this Agreement. <br />5.5. Aesthetic Participation. The following State aesthetic participation is capped and based off preliminary <br />estimates. <br />A. Bridge Aesthetics State's share capped: Bridge No. 71020 up to $148,340.00, Bridge No. 71019 up to <br />$172,630.00, Bridge No. 71018 up to $87,380.00, Bridge No. 71017 up to $235,260.00, and Bridge No. <br />71016 up to $235,580.00. Total City cost share for bridge aesthetics will be $5,356.25. <br />B. Retaining Wall Aesthetics State's share capped: Main Street interchange up to $151,810.00, School <br />Street interchange up to $189,850, 193rd Avenue interchange $301,840.00, and 197th Avenue <br />interchange $37,500.00. Total City share for retaining wall aesthetics will be $66,260.00. <br />C. Noise Wall Aesthetics State's share total capped up to $58,040.00. Total City share of noise wall <br />aesthetics will be $25,256.00. <br />5.6. Plan Changes, Additional Construction, Etc. The City will share in the costs of construction contract <br />addenda and change orders that are necessary to complete the City participation construction covered <br />under this Agreement, including any City requested additional work and plan changes. <br />The State reserves the right to invoice the City for the cost of any additional City requested work and plan <br />changes, construction contract addenda, change orders, and associated construction engineering before <br />the completion of the contract construction. <br />5.7. Liquidated Damages. All liquidated damages assessed the State's contractor in connection with the <br />construction contract will result in a credit shared by each party in the same proportion as their total <br />construction cost share covered under this Agreement is to the total contract construction cost before any <br />deduction for liquidated damages. <br />6. City Cost and Payment by the City <br />6.1. City Cost. $1,507,570.10 is the City's estimated share of the costs of the contract construction, State <br />Furnished Materials and the 8 percent construction engineering cost share as shown in the Preliminary <br />Schedule "I". The Preliminary Schedule "I" was prepared using estimated quantities and unit prices, and <br />may include any credits or lump sum costs. Upon award of the construction contract, the State will <br />Receivable Standard CE by Both Parties with Signal (Cooperative Agreements) <br />
The URL can be used to link to this page
Your browser does not support the video tag.