My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. PCSR 01-25-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2022
>
01-25-2022
>
8.1. PCSR 01-25-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 9:37:17 AM
Creation date
1/21/2022 9:32:40 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/25/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.The individual driveways accessing Gates Ave will not be supported by staff. Please amend <br />the plans to show internal access from the site. <br />rd <br />7.The sightlines at Gates/3 may not meet ordinance standards for a vision clearance triangle, <br />or intersection visibility, please verify. <br />a.Vision clearance triangle means the area of a corner lot bounded by the right-of-way <br />lines and a line connecting the two points on the property lines 30 feet from the <br />intersection of the property lines. <br />8.Stormwater treatment will be required for all new impervious (minus what the existing <br />residential properties had prior to demolition). If impervious increase is net 1 acre or more, <br />NPDES requirements will have to be met. <br /> <br />9.A landscaping plan will be required along with the final submittal. <br />Thank you, and please let meknow if you have any questions. <br /> <br />Sincerely, <br /> <br />Zack Carlton, Planning Manager <br />763.635.1035 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.