My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-08-2005 CC MIN
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
2000-2009
>
2005
>
08-08-2005 CC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:27 AM
Creation date
9/7/2005 12:49:58 PM
Metadata
Fields
Template:
City Government
type
CCM
date
8/8/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Minutes Page 5 <br />August 8, 2005 <br />----------------------------- <br /> <br />Mr. Klaers asked for the Council to consider purchasing a black and white E-sized copier <br />now along with consideration of a $16,000 SmartBoard for the Upper Town Conference <br />Room. He also asked for consideration of constructing an ice arena manager office at a cost <br />of approximately $50,000 and improvements to the Emporium estimated at $10,000. <br /> <br />MOVED BY COUNCILMEMBER FARBER AND SECONDED BY <br />COUNCILMEMBER DIETZ TO ORDER THE E-SIZED COPIER FOR $9,000, <br />WITH FUNDS FROM THE 2005 COUNCIL CONTINGENCY AND TO <br />CONSTRUCT AN OFFICE AT THE ICE ARENA, AND TO MAKE <br />IMPROVEMENTS AT THE EMPORIUM, WITH FUNDS FROM THE <br />GOVERNMENT BUILDING RESERVE FUND. MOTION CARRIED 5-0. <br /> <br />More information regarding funding for the SmartBoard and the possibility of the Cable <br />Commission providing this funding will be provided. <br /> <br />City Engineer Terry Maurer discussed the proposed Engineering Department’s <br />development. He explained that the two proposed engineering technicians would work 50% <br />of their time on various public improvement projects, 25% of their time in 2006 would be <br />spent on projects that have been waiting for someone to work on, and 25% of their time on <br />ongoing items such as maintaining the City’s municipal state aid system, updating the City <br />maps, NPDES inspections, annual inspections of storm sewer outlets and management of <br />the GIS system. He stated that the first thing to do with starting up an engineering <br />department is to get the technicians doing routine items. He also reviewed the possibility of <br />other future positions and their tasks. <br /> <br />Councilmember Gumphrey asked what the difference was between a Technician I and <br />Technician II. Mr. Maurer explained that the difference would be the level of experience. <br />He stated that the more experienced technician would start in April with the less experienced <br />technician, which could be right out of school in June. It was stated that the technicians <br />would be reporting to Mr. Maurer. It was also stated that technician billing rates from <br />consultants could be up to twice as costly, so that in the long run, the City would be saving <br />by hiring technicians. <br /> <br />Councilmember Motin stated that he is okay with the hiring of technicians; however, he is <br />not sure at this time about hiring additional staff in the future. <br /> <br />6. Other Business <br /> <br />Library Cleaning: <br />Mr. Klaers stated that the City has advertised and interviewed but we come back to the <br />situation of how many employees to manage; and it doesn’t make sense to make a change at <br />this time, but instead to have a part-time person go to full-time. <br /> <br />MOVED BY COUNCILMEMBER DIETZ AND SECONDED BY <br />COUNCILMEMBER FARBER TO MOVE KANDIS NASH FROM A PART- <br />TIME TO FULL-TIME POSITION. MOTION CARRIED 5-0. <br /> <br />Repair of Curb and Gutter: <br />Councilmember Dietz explained that he had received an e-mail from a resident who lives in <br />former Chief Zerwas’ home and he is having trouble with the curb and gutter disintegrating. <br />The individual has talked with Phil Hals, however, Mr. Hals only has $3,000 in his budget <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.