Laserfiche WebLink
Terra ct Number 20.705 <br />i <br />Terra Ok RRiver Fre 3ation #3 <br />C O N S TR O CT ION Cit of Ok Rver <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 11 <br />Contractor's signed certification is attached. APPLICATION DATE: 12/31/22 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 12/31/22 <br />Use Column I on Contracts where variable retainage for line items may. a pply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D <br />E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />DOR E) <br />(D+E+F) <br />Klein Electric <br />16-1600 <br />26A <br />DIV 28 Site Future Cameras Labor <br />$ 1,856.00 <br />$ - <br />$ - <br />$ 1,856.00 <br />$ 93.00 <br />$ 93.00 <br />5.01% <br />$ 1,763.00 <br />$ 4.65 <br />Klein Electric <br />16-1600 <br />26A <br />00#1 PR#6 Generator and Transformer <br />$ - <br />$ - <br />$ (19,350.00) <br />$ (19:350.00) <br />$ - <br />$ - <br />0.00% <br />$ (19:350.00) <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />00#2 PR#2 Overhead Doors & Circuiting <br />$ - <br />$ - <br />$ 1,068.00 <br />$ 1,068.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,068.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />00#3 PR#3R <br />$ - <br />$ - <br />$ (443.00) <br />$ (443.00) <br />$ (443.00) <br />$ (443.00) <br />100.00% <br />$ - <br />$ (22.15) <br />Klein Electric <br />16-1600 <br />26A <br />CO44 ASI#1/RFI#19 <br />$ - <br />$ - <br />$ (2,625.00) <br />$ (2,625.00) <br />$ (2,625.00) <br />$ (2,625.00) <br />100.00% <br />$ - <br />$ (131.25) <br />Klein Electric <br />16-1600 <br />26A <br />00#5 PR#10R <br />$ - <br />$ - <br />$ 1,875.00 <br />$ 1,875.00 <br />$ - <br />$ 526.00 <br />$ 526.00 <br />28.05% <br />$ 1,349.00 <br />$ 26.30 <br />Klein Electric <br />16-1600 <br />26A <br />00#6 PR#9R Elecrical Revisions <br />$ - <br />$ - <br />$ 2,370.00 <br />$ 2,370.00 <br />$ 593.00 <br />$ 593.00 <br />25.02% <br />$ 1,777.00 <br />$ 29.65 <br />Klein Electric <br />16-1600 <br />26A <br />CO#7 ASI#4RTower Lights <br />$ - <br />$ - <br />$ 8,136.00 <br />$ 8,136.00 <br />$ 814.00 <br />$ 814.00 <br />10.00% <br />$ 7,322.00 <br />$ 40.70 <br />Klein Electric <br />16-1600 <br />26A <br />00#8 PR#17 SCBA Compressor <br />$ - <br />$ - <br />$ 1,354.00 <br />$ 1,354.00 <br />$ - <br />$ 339.00 <br />$ 339.00 <br />25.04% <br />$ 1,015.00 <br />$ 16.95 <br />Klein Electric <br />16-1600 <br />26A <br />00#9 RFI#117 <br />$ - <br />$ - <br />$ 983.00 <br />$ 983.00 <br />$ 737.00 <br />$ 737.00 <br />74.97% <br />$ 246.00 <br />$ 36.85 <br />Klein Electric <br />16-1600 <br />26A <br />00#10 RFI#118 Automatic Push Pad <br />$ - <br />$ - <br />$ 437.00 <br />$ 437.00 <br />$ - <br />$ 328.00 <br />$ 328.00 <br />75.06% <br />$ 109.00 <br />$ 16.40 <br />Dryden Excavating <br />31-1000 <br />31A <br />Mobilization, Bond, SWPP Permit <br />$ 7,000.00 <br />$ - <br />$ - <br />$ 7,000.00 <br />$ 5,950.00 <br />$ 350.00 <br />$ 6,300.00 <br />90.00% <br />$ 700.00 <br />$ 315.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Bituminous Saw -Cutting Labor <br />$ 2,105.00 <br />$ - <br />$ - <br />$ 2,105.00 <br />$ 2,105.00 <br />$ 2,105.00 <br />100.00% <br />$ - <br />$ 105.25 <br />Dryden Excavating <br />31-1000 <br />31A <br />Bituminous Removal Labor <br />$ 3,640.00 <br />$ - <br />$ - <br />$ 3,640.00 <br />$ 3,640.00 <br />$ 3,640.00 <br />100.00% <br />$ - <br />$ 182.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Concrete Saw -Cutting Labor <br />$ 160.00 <br />$ - <br />$ - <br />$ 160.00 <br />$ 160.00 <br />$ 160.00 <br />100.00% <br />$ - <br />$ 8.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Concrete Removal Labor <br />$ 3,236.00 <br />$ - <br />$ - <br />$ 3,236.00 <br />$ 3,236.00 <br />$ 3,236.00 <br />100.00% <br />$ - <br />$ 161.80 <br />Dryden Excavating <br />31-1000 <br />31A <br />Tree Protection Labor <br />$ 75.00 <br />$ - <br />$ - <br />$ 75.00 <br />$ 75.00 <br />$ 75.00 <br />100.00% <br />$ - <br />$ 3.75 <br />Dryden Excavating <br />31-1000 <br />31A <br />Clearing & Grubbing Labor <br />$ 2,100.00 <br />$ - <br />$ - <br />$ 2,100.00 <br />$ 2,100.00 <br />$ 2,100.00 <br />100.00% <br />$ - <br />$ 105.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Topsoil Stripping & Emb. Labor <br />$ 1,386.00 <br />$ - <br />$ - <br />$ 1,386.00 <br />$ 1,386.00 <br />$ 1,386.00 <br />100.00% <br />$ - <br />$ 69.30 <br />Dryden Excavating <br />31-1000 <br />31A <br />Export Excess Topsoil Labor <br />$ 14,055.00 <br />$ - <br />$ - <br />$ 14,055.00 <br />$ 14,055.00 <br />$ 14,055.00 <br />100.00% <br />$ - <br />$ 702.75 <br />Dryden Excavating <br />31-1000 <br />31A <br />Site Grading Labor <br />$ 56,076.01 <br />$ - <br />$ - <br />$ 56,076.01 <br />$ 42,834.04 <br />$ 42,834.04 <br />76.39% <br />$ 13,241.97 <br />$ 2,141.70 <br />Dryden Excavating <br />31-1000 <br />31A <br />Site Grading Material <br />$ 14,040.00 <br />$ - <br />$ - <br />$ 14,040.00 <br />$ 14,040.00 <br />$ 14,040.00 <br />100.00% <br />$ - <br />$ 702.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Exc. & Backfill Foundations <br />$ 25,378.00 <br />$ - <br />$ - <br />$ 25,378.00 <br />$ 25,378.00 <br />$ 25,378.00 <br />100.00% <br />$ - <br />$ 1,268.90 <br />Dryden Excavating <br />31-1000 <br />31A <br />Building Sand Cushion Labor <br />$ 3,298.00 <br />$ - <br />$ - <br />$ 3,298.00 <br />$ 2,552.55 <br />$ 589.05 <br />$ 3,141.60 <br />95.26% <br />$ 156.40 <br />$ 157.08 <br />Dryden Excavating <br />31-1000 <br />31A <br />Building Sand Cushion Material <br />$ 629.00 <br />$ - <br />$ - <br />$ 629.00 <br />$ - <br />$ - <br />0.00% <br />$ 629.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Class 5 Labor <br />$ 9,014.00 <br />$ - <br />$ - <br />$ 9,014.00 <br />$ - <br />$ - <br />0.00% <br />$ 9,014.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Class 5 Material <br />$ 7,854.00 <br />$ - <br />$ - <br />$ 7,854.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,854.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Subgrade Prep Labor <br />$ 8,595.00 <br />$ - <br />$ - <br />$ 8,595.00 <br />$ 4,297.50 <br />$ 4,297.50 <br />50.00% <br />$ 4,297.50 <br />$ 214.88 <br />Dryden Excavating <br />31-1000 <br />31A <br />Dewatering Labor <br />$ 2,625.00 <br />$ - <br />$ - <br />$ 2,625.00 <br />$ 2,625.00 <br />$ 2,625.00 <br />100.00% <br />$ - <br />$ 131.25 <br />Dryden Excavating <br />31-1000 <br />31A <br />SWPP Permit <br />$ 525.00 <br />$ - <br />$ - <br />$ 525.00 <br />$ 525.00 <br />$ 525.00 <br />100.00% <br />$ - <br />$ 26.25 <br />Dryden Excavating <br />31-1000 <br />31A <br />Silt Fence Labor <br />$ 2,240.00 <br />$ - <br />$ - <br />$ 2,240.00 <br />$ 2,240.00 <br />$ 2,240.00 <br />100.00% <br />$ - <br />$ 112.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Silt Fence Material <br />$ 700.00 <br />$ - <br />$ - <br />$ 700.00 <br />$ 700.00 <br />$ 700.00 <br />100.00% <br />$ - <br />$ 35.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Inlet Protection Labor <br />$ 2,502.00 <br />$ - <br />$ - <br />$ 2,502.00 <br />$ 2,502.00 <br />$ 2,502.00 <br />100.00% <br />$ - <br />$ 125.10 <br />Dryden Excavating <br />31-1000 <br />31A <br />Construction Entrance Labor <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />100.00% <br />$ - <br />$ 100.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Construction Entrance Materials <br />$ 100.00 <br />$ - <br />$ - <br />$ 100.00 <br />$ 100.00 <br />$ 100.00 <br />100.00% <br />$ - <br />$ 5.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Hydro Seed <br />$ 1,166.00 <br />$ - <br />$ - <br />$ 1,166.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,166.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Flex Mat Labor <br />$ 700.00 <br />$ - <br />$ - <br />$ 700.00 <br />$ - <br />$ - <br />0.00% <br />$ 700.00 <br />$ - <br />Dryden Excavating <br />31-1000 <br />31A <br />Flex Mat Material <br />$ 3,266.00 <br />$ - <br />$ - <br />$ 3,266.00 <br />$ 3,260.00 <br />$ 3,260.00 <br />99.82% <br />$ 6.00 <br />$ 163.00 <br />Dryden Excavating <br />31-1000 <br />33A <br />Mobilization, Bond, Permits <br />$ 20,504.16 <br />$ - <br />$ - <br />$ 20,504.16 <br />$ 18,453.74 <br />$ 18,453.74 <br />90.00% <br />$ 2,050.42 <br />$ 922.69 <br />Dryden Excavating <br />31-1000 <br />33A <br />Water Utilities Labor <br />$ 25,719.19 <br />$ - <br />$ - <br />$ 25,719.19 <br />$ 25,719.19 <br />$ 25,719.19 <br />100.00% <br />$ - <br />$ 1,285.96 <br />Dryden Excavating <br />31-1000 <br />33A <br />Water Utilities Material <br />$ 52,306.23 <br />$ - <br />$ - <br />$ 52,306.23 <br />$ 52,306.23 <br />$ 52,306.23 <br />100.00% <br />$ - <br />$ 2,615.31 <br />Dryden Excavating <br />31-1000 <br />33A <br />Wet Tap Labor <br />$ 239.22 <br />$ - <br />$ - <br />$ 239.22 <br />$ 239.22 <br />$ 239.22 <br />100.00% <br />$ - <br />$ 11.96 <br />Dryden Excavating <br />31-1000 <br />33A <br />Wet Tap Material <br />$ 2,500.00 <br />$ - <br />$ - <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />100.00% <br />$ - <br />$ 125.00 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Piping Labor <br />$ 9,667.77 <br />$ - <br />$ - <br />$ 9,667.77 <br />$ 9,667.77 <br />$ 9,667.77 <br />100.00% <br />$ - <br />$ 483.39 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Piping Material <br />$ 9,622.35 <br />$ - <br />$ - <br />$ 9,622.35 <br />$ 9,622.35 <br />$ 9,622.35 <br />100.00% <br />$ - <br />$ 481.12 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Manholes Labor <br />$ 1,808.00 <br />$ - <br />$ - <br />$ 1,808.00 <br />$ 1,808.00 <br />$ 1,808.00 <br />100.00% <br />$ - <br />$ 90.40 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Manholes Material <br />$ 9,425.00 <br />$ - <br />$ - <br />$ 9,425.00 <br />$ 9,425.00 <br />$ 9,425.00 <br />100.00% <br />$ - <br />$ 471.25 <br />Dryden Excavating <br />31-1000 <br />33A <br />Manhole Castings Labor <br />$ 691.20 <br />$ - <br />$ - <br />$ 691.20 <br />$ 691.20 <br />$ 691.20 <br />100.00% <br />$ - <br />$ 34.56 <br />Dryden Excavating <br />31-1000 <br />33A <br />Manhole Castings Material <br />$ 1,140.00 <br />$ - <br />$ - <br />$ 1,140.00 <br />$ 1,103.80 <br />$ 1,103.80 <br />96.82% <br />$ 36.20 <br />$ 55.19 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm - PVC Piping Labor <br />$ 8,024.15 <br />$ - <br />$ - <br />$ 8,024.15 <br />$ 7,073.34 <br />$ 7,073.34 <br />88.15% <br />$ 950.81 <br />$ 353.67 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm- PVC Piping Material <br />$ 10,992.34 <br />$ - <br />$ - <br />$ 10,992.34 <br />$ 10,992.34 <br />$ 10,992.34 <br />100.00% <br />$ - <br />$ 549.62 <br />Page 7 / 8 <br />