Laserfiche WebLink
Terra ct Number 20.705 <br />i <br />Terra Ok RRiver Fre 3ation #3 <br />CONSTRUCTION Cit of Ok RlVer <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 11 <br />Contractor's signed certification is attached. APPLICATION DATE: 12/31/22 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 12/31/22 <br />Use Column I on Contracts where variable retainage for line items may. a pply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D <br />E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />DOR E) <br />(D+E+F) <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#5 RFI#107 <br />$ - <br />$ - <br />$ (213.00) <br />$ (213.00) <br />$ - <br />$ (213.00) <br />$ (213.00) <br />100.00% <br />$ - <br />$ (10.65) <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#7 RFI#121 <br />$ - <br />$ - <br />$ (250.00) <br />$ (250.00) <br />$ - <br />$ (250.00) <br />$ (250.00) <br />100.00% <br />$ - <br />$ (12.50) <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />00#8 PR#13 Steam Generator <br />$ - <br />$ - <br />$ 8,342.00 <br />$ 8,342.00 <br />$ - <br />$ - <br />0.00% <br />$ 8,342.00 <br />$ - <br />Summit Fire <br />15-1533 <br />21A <br />Labor <br />$ 18,200.00 <br />$ - <br />$ - <br />$ 18,200.00 <br />$ 9,100.00 <br />$ 1,820.00 <br />$ 10,920.00 <br />60.00% <br />$ 7,280.00 <br />$ 546.00 <br />Summit Fire <br />15-1533 <br />21A <br />Material <br />$ 22,800.00 <br />$ - <br />$ - <br />$ 22,800.00 <br />$ 22,800.00 <br />$ 22,800.00 <br />100.00% <br />$ - <br />$ 1,140.00 <br />Summit Fire <br />15-1533 <br />21A <br />Design <br />$ 3,200.00 <br />$ - <br />$ - <br />$ 3,200.00 <br />$ 3,200.00 <br />$ 3,200.00 <br />100.00% <br />$ - <br />$ 160.00 <br />Summit Fire <br />15-1533 <br />21A <br />Fabrication <br />$ 2,600.00 <br />$ - <br />$ - <br />$ 2,600.00 <br />$ 2,600.00 <br />$ 2,600.00 <br />100.00% <br />$ - <br />$ 130.00 <br />Summit Fire <br />15-1533 <br />21A <br />Bond <br />$ 800.00 <br />$ - <br />$ - <br />$ 800.00 <br />$ 800.00 <br />$ 800.00 <br />100.00% <br />$ - <br />$ 40.00 <br />Summit Fire <br />15-1533 <br />21A <br />00#1 ASI#9 Redesigned Sprinkler Layout <br />$ - <br />$ - <br />$ 820.00 <br />$ 820.00 <br />$ - <br />$ 820.00 <br />$ 820.00 <br />100.00% <br />$ - <br />$ 41.00 <br />Klein Electric <br />16-1600 <br />26A <br />Electrical -Permit <br />$ 1,325.00 <br />$ - <br />$ - <br />$ 1,325.00 <br />$ 1,325.00 <br />$ 1,325.00 <br />100.00% <br />$ - <br />$ 66.25 <br />Klein Electric <br />16-1600 <br />26A <br />Electrical -Bond <br />$ 4,347.00 <br />$ - <br />$ - <br />$ 4,347.00 <br />$ 4,347.00 <br />$ 4,347.00 <br />100.00% <br />$ - <br />$ 217.35 <br />Klein Electric <br />16-1600 <br />26A <br />Mobilization <br />$ 22,936.00 <br />$ - <br />$ - <br />$ 22,936.00 <br />$ 22,936.00 <br />$ 22,936.00 <br />100.00% <br />$ - <br />$ 1,146.80 <br />Klein Electric <br />16-1600 <br />26A <br />Temp Power/Job Trailer <br />$ 1,710.00 <br />$ - <br />$ - <br />$ 1,710.00 <br />$ 1,368.00 <br />$ 1,368.00 <br />80.00% <br />$ 342.00 <br />$ 68.40 <br />Klein Electric <br />16-1600 <br />26A <br />Temp Power/Site <br />$ 3,325.00 <br />$ - <br />$ - <br />$ 3,325.00 <br />$ 2,660.00 <br />$ 2,660.00 <br />80.00% <br />$ 665.00 <br />$ 133.00 <br />Klein Electric <br />16-1600 <br />26A <br />Temp Power/Building <br />$ 3,325.00 <br />$ - <br />$ - <br />$ 3,325.00 <br />$ 2,328.00 <br />$ 2,328.00 <br />70.02% <br />$ 997.00 <br />$ 116.40 <br />Klein Electric <br />16-1600 <br />26A <br />Switchgear Package/Graybar Electric Cc <br />$ 28,845.00 <br />$ - <br />$ - <br />$ 28,845.00 <br />$ 28,845.00 <br />$ 28,845.00 <br />100.00% <br />$ - <br />$ 1,442.25 <br />Klein Electric <br />16-1600 <br />26A <br />Utility Fees/Elk River Public Utilities <br />$ 8,279.00 <br />$ - <br />$ - <br />$ 8,279.00 <br />$ 8,279.00 <br />$ 8,279.00 <br />100.00% <br />$ - <br />$ 413.95 <br />Klein Electric <br />16-1600 <br />26A <br />Utility Transformer Pad Material <br />$ 1,045.00 <br />$ - <br />$ - <br />$ 1,045.00 <br />$ 1,045.00 <br />$ 1,045.00 <br />100.00% <br />$ - <br />$ 52.25 <br />Klein Electric <br />16-1600 <br />26A <br />Utility Transformer Pad Labor <br />$ 1,425.00 <br />$ - <br />$ - <br />$ 1,425.00 <br />$ 1,425.00 <br />$ 1,425.00 <br />100.00% <br />$ - <br />$ 71.25 <br />Klein Electric <br />16-1600 <br />26A <br />Service Entrance Material <br />$ 4,834.00 <br />$ - <br />$ - <br />$ 4,834.00 <br />$ 1,209.00 <br />$ 3,625.00 <br />$ 4,834.00 <br />100.00% <br />$ - <br />$ 241.70 <br />Klein Electric <br />16-1600 <br />26A <br />Service Entrance Labor <br />$ 3,827.00 <br />$ - <br />$ - <br />$ 3,827.00 <br />$ 957.00 <br />$ 2,870.00 <br />$ 3,827.00 <br />100.00% <br />$ - <br />$ 191.35 <br />Klein Electric <br />16-1600 <br />26A <br />Service Equipment Material <br />$ 2,776.00 <br />$ - <br />$ - <br />$ 2,776.00 <br />$ 694.00 <br />$ 2,082.00 <br />$ 2,776.00 <br />100.00% <br />$ - <br />$ 138.80 <br />Klein Electric <br />16-1600 <br />26A <br />Service Equipment Labor <br />$ 3,277.00 <br />$ - <br />$ - <br />$ 3,277.00 <br />$ 819.00 <br />$ 2,458.00 <br />$ 3,277.00 <br />100.00% <br />$ - <br />$ 163.85 <br />Klein Electric <br />16-1600 <br />26A <br />Power Panelboards Material <br />$ 2,739.00 <br />$ - <br />$ - <br />$ 2,739.00 <br />$ 1,370.00 <br />$ 685.00 <br />$ 2,055.00 <br />75.03% <br />$ 684.00 <br />$ 102.75 <br />Klein Electric <br />16-1600 <br />26A <br />Power Panelboards Labor <br />$ 2,856.00 <br />$ - <br />$ - <br />$ 2,856.00 <br />$ 1,428.00 <br />$ 714.00 <br />$ 2,142.00 <br />75.00% <br />$ 714.00 <br />$ 107.10 <br />Klein Electric <br />16-1600 <br />26A <br />Generator Package/Total Energy Systems <br />$ 79,282.00 <br />$ - <br />$ - <br />$ 79,282.00 <br />$ 7,928.00 <br />$ 7,928.00 <br />10.00% <br />$ 71,354.00 <br />$ 396.40 <br />Klein Electric <br />16-1600 <br />26A <br />Generator Pad Material <br />$ 1,235.00 <br />$ - <br />$ - <br />$ 1,235.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,235.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Generator Pad Labor <br />$ 1,710.00 <br />$ - <br />$ - <br />$ 1,710.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,710.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />Generator Material <br />$ 1,562.00 <br />$ - <br />$ - <br />$ 1,562.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,562.00 <br />$ - <br />KleinElectric <br />16-1600 <br />26A <br />Generator Labor <br />$ 4,091.00 <br />$ - <br />$ - <br />$ 4,091.00 <br />$ - <br />$ - <br />0.00% <br />$ 4:091.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Generator Serivice Entrance Material <br />$ 3,841.00 <br />$ - <br />$ - <br />$ 3,841.00 <br />$ 960.00 <br />$ 960.00 <br />24.99% <br />$ 2,881.00 <br />$ 48.00 <br />Klein Electric <br />16-1600 <br />26A <br />Generator Serivice Entrance Labor <br />$ 3,599.00 <br />$ - <br />$ - <br />$ 3,599.00 <br />$ 900.00 <br />$ 900.00 <br />25.01% <br />$ 2,699.00 <br />$ 45.00 <br />Klein Electric <br />16-1600 <br />26A <br />ATS Equipment Material <br />$ 2,309.00 <br />$ - <br />$ - <br />$ 2,309.00 <br />$ - <br />$ 1,385.00 <br />$ 1,385.00 <br />59.98% <br />$ 924.00 <br />$ 69.25 <br />Klein Electric <br />16-1600 <br />26A <br />ATS Equipment Labor <br />$ 2,901.00 <br />$ - <br />$ - <br />$ 2,901.00 <br />$ - <br />$ 1,741.00 <br />$ 1,741.00 <br />60.01% <br />$ 1,160.00 <br />$ 87.05 <br />Klein Electric <br />16-1600 <br />26A <br />ES Panelboards Material <br />$ 801.00 <br />$ - <br />$ - <br />$ 801.00 <br />$ 401.00 <br />$ 401.00 <br />50.06% <br />$ 400.00 <br />$ 20.05 <br />Klein Electric <br />16-1600 <br />26A <br />ES Panelboards Labor <br />$ 1,146.00 <br />$ - <br />$ - <br />$ 1,146.00 <br />$ 573.00 <br />$ 573.00 <br />50.00% <br />$ 573.00 <br />$ 28.65 <br />Klein Electric <br />16-1600 <br />26A <br />Light Fixture Package/Viking Electric <br />$ 94,954.00 <br />$ - <br />$ - <br />$ 94,954.00 <br />$ 94,165.00 <br />$ 789.00 <br />$ 94,954.00 <br />100.00% <br />$ - <br />$ 4,747.70 <br />Klein Electric <br />16-1600 <br />26A <br />Fixture Material <br />$ 6,196.00 <br />$ - <br />$ - <br />$ 6,196.00 <br />$ 930.00 <br />$ 930.00 <br />15.01% <br />$ 5,266.00 <br />$ 46.50 <br />Klein Electric <br />16-1600 <br />26A <br />Fixture Labor <br />$ 21,162.00 <br />$ - <br />$ - <br />$ 21,162.00 <br />$ 3,174.00 <br />$ 3,174.00 <br />15.00% <br />$ 17,988.00 <br />$ 158.70 <br />Klein Electric <br />16-1600 <br />26A <br />Fixture Control Material <br />$ 1,572.00 <br />$ - <br />$ - <br />$ 1,572.00 <br />$ 236.00 <br />$ 236.00 <br />15.01% <br />$ 1,336.00 <br />$ 11.80 <br />Klein Electric <br />16-1600 <br />26A <br />Fixture Control Labor <br />$ 4,632.00 <br />$ - <br />$ - <br />$ 4,632.00 <br />$ 695.00 <br />$ 695.00 <br />15.00% <br />$ 3,937.00 <br />$ 34.75 <br />Klein Electric <br />16-1600 <br />26A <br />HVLS Fan/Big Ass Fans <br />$ 10,123.00 <br />$ - <br />$ - <br />$ 10,123.00 <br />$ 10,123.00 <br />$ 10,123.00 <br />100.00% <br />$ - <br />$ 506.15 <br />Klein Electric <br />16-1600 <br />26A <br />HVLS Fan Material <br />$ 313.00 <br />$ - <br />$ - <br />$ 313.00 <br />$ - <br />$ - <br />0.00% <br />$ 313.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />HVLS Fan Labor <br />$ 878.00 <br />$ - <br />$ - <br />$ 878.00 <br />$ - <br />$ - <br />0.00% <br />$ 878.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Site Pole Bases Material <br />$ 2,320.00 <br />$ - <br />$ - <br />$ 2,320.00 <br />$ 116.00 <br />$ 116.00 <br />5.00% <br />$ 2,204.00 <br />$ 5.80 <br />Klein Electric <br />16-1600 <br />26A <br />Site Pole Bases Labor <br />$ 2,546.00 <br />$ - <br />$ - <br />$ 2,546.00 <br />$ 127.00 <br />$ 127.00 <br />4.99% <br />$ 2,419.00 <br />$ 6.35 <br />Klein Electric <br />16-1600 <br />26A <br />Site Pole Underground Material <br />$ 2,318.00 <br />$ - <br />$ - <br />$ 2,318.00 <br />$ 116.00 <br />$ 116.00 <br />5.00% <br />$ 2,202.00 <br />$ 5.80 <br />Klein Electric <br />16-1600 <br />26A <br />Site Pole Underground Labor <br />$ 3,041.00 <br />$ - <br />$ - <br />$ 3,041.00 <br />$ 152.00 <br />$ 152.00 <br />5.00% <br />$ 2,889.00 <br />$ 7.60 <br />Klein Electric <br />16-1600 <br />26A <br />Site Pole Install Material <br />$ 98.00 <br />$ - <br />$ - <br />$ 98.00 <br />$ - <br />$ - <br />0.00% <br />$ 98.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Site Pole Install Labor <br />$ 1,126.00 <br />$ - <br />$ - <br />$ 1,126.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,126.00 <br />$ - <br />Page 5 / 8 <br />