My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1zb ERMUSR 01-11-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2022
>
01-11-2022
>
5.1zb ERMUSR 01-11-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2022 3:44:57 PM
Creation date
1/7/2022 3:44:57 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MORATORIUMEFFECTIVEFEBRUARY14,2017ONTHEFOLLOWINGLOADCONTROLPROGRAMS <br />ENERGYMANAGEMENTPROGRAMRATES <br />Available:WithinElkRiverMunicipalUtilities(ERMU)establishedserviceterritory. <br />Applicable:Tosinglefamilyresidences,nondemandanddemandcustomersreceivingserviceunder <br />anotherrate,whoaddasecondmeterforanyofthefollowingcontrolledloads: <br />DualFuelSpaceHeatingRate:ThisProgramisavailabletoresidentialcustomersonly.Adualfuelspace <br />heatingsystemconsistsofanelectricheatingsystemandasecondarynonelectricspaceheatingsystem <br />bothcapableofheatingthelivingspaceatdesignconditions.Interruptionsoftheelectricheating <br />systemwillusuallyoccurforupto12hoursdailyonpeakwinterdaysandamaximumof400hoursper <br />heatingseason. <br />e,thecustomershallprovide: <br />Toqualifyforthespecialrat <br />1. Anelectricspaceheatingsystemwhichcanbeinterruptedbyasingle5ampratedrelay. <br />2. Asecondarynonelectricspaceheatingsystemcapableofautomaticstartupandcontinuous <br />operationuponinterruptionoftheelectricheatingsystem. <br />3. ObtainaloadcontroldevicefurnishedbyERMU. <br />4. Accommodationsforameterandloadcontroldeviceandassociatedwiringinstalledaccording <br />totheapplicableelectricalcodes,andinstalledbyaqualifiedelectrician. <br />5. InspectionbyaStatecertifiedelectricalinspectorandarepresentativeofERMU. <br />6. Radiantheatintheslabofthebuildingqualifiesfordualfuel,notelectricthermalstorage. <br />7. DualFuelisnotallowedingarages,polesheds,oranystructurethatdoesnotconfirmtothe <br />residentialbuildingcode. <br />8. Exceptionsbymanagementapprovalonly. <br />ERMUshallprovide: <br />ctricenergyconsumedbytheprimaryelectricheatingsystemat$0.06200632perkWh. <br />1. Allele <br />2. Duringpeakloadconditions,ERMUwillturncustomercontrolledelectricalheatoffforextended <br />periodsoftimeasstatedabove. <br />3. Ametertomeasureelectricityconsumedbytheelectricheatingsystem. <br />4. Aloadcontroldeviceandmetersockettoaccommodatethemeter. <br />RateissubjecttoapplicationofPowerCostAdjustment(PCA). <br />Federal,stateandlocaltaxesmayapply. <br />Page1of3 <br />103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.