My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1z ERMUSR 01-11-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2022
>
01-11-2022
>
5.1z ERMUSR 01-11-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2022 3:44:20 PM
Creation date
1/7/2022 3:44:20 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUNDSOURCEHEATPUMPPROGRAMRATE <br />Available:WithinElkRiverMunicipalUtilities(ERMU)establishedserviceterritory. <br />Applicable:Tosinglefamilyresidences,nondemandanddemandcustomersreceivingserviceunder <br />anotherrate,whoaddasecondmeterforanyofthefollowingcontrolledloads: <br />GroundSourceHeatPumpRate:ThisProgramisavailabletoresidentialandcommercialcustomers.A <br />groundsourceheatpump(GSHP)isacentralheatingand/orcoolingsystemforresidentiallivingspaces <br />orcommercialworkspaces.ResidentiallivingspaceswillmeetalltheapplicableMinnesotastate <br />buildingcodes.CommercialstructuresthatareclassifiedasUtilityandMiscellaneousGroupUbythe <br />InternationalCodeCouncilarenoteligibleforthisrate.Thisprogramisavailabletoresidentialor <br />commercialcustomerswithaGSHPastheirsoleheatsource.GSHPsthatqualifyforthisprogramwill <br />notbeinterrupted.AGSHPpairedwithanotherheatingsourcesuchasnaturalgas,fueloil,orpropane <br />mayqualifyfortheDualFuelprogram. <br />Toqualifyforthespecialrate,thecustomershallprovide: <br />1. TheGSHPistheonlyheatsource.OnlyclosedloopGSHPsareeligibleforthisratebeginning <br />January1,2016. <br />2. ERMUandthecustomerwillagreeonameterlocationpriortothemetersocketinstallation. <br />yhaveaseparatemetertodeterminetheloadoftheheatpumps. <br />3. Commercialcustomersma <br />Electricusagefortheremainderofthebuildingwillbemeteredandpricedusingthe <br />appropriaterate(DemandorNonDemand). <br />4. Accommodationsforameterandassociatedwiringinstalledaccordingtotheapplicable <br />electricalcodesandwillbeinstalledbyaqualifiedelectrician. <br />5. InspectionbyaStatecertifiedelectricalinspectorandarepresentativeofERMU. <br />ERMUshallprovide: <br />1. Allelectricenergyconsumedbytheprimaryelectricheatingsystemat$0.09360954perkWh. <br />2. Ametersockettoaccommodatethemeterinamutuallyagreedtolocation. <br />3. Ametertomeasureelectricityconsumedbytheelectricheatingsystem. <br />RatesaresubjecttoapplicationofPowerCostAdjustment(PCA). <br />Federal,state,andlocaltaxesmayapply. <br />AdoptedDecember14,2021 <br />AmendedJanuary11,2022 <br />EffectiveJanuary1,2022 <br />Page1of1 <br />100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.