My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1x ERMUSR 01-11-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2022
>
01-11-2022
>
5.1x ERMUSR 01-11-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2022 3:43:44 PM
Creation date
1/7/2022 3:43:44 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OffPeakDemandElectricServiceRate <br />Federal,state,andlocaltaxesmayapply. <br />MinimumBill:Maximumbillingdemandduringprevioustwelvemonthstimes3.0%ofthedemand <br />charge,ortheactualdemandmultipliedbythedemandcharge,whicheverisgreaterplus$1.00perkW <br />permonthofexcesstransformercapacityrequestedbycustomer. <br />DeterminationofBillingDemand:Thebillingdemandshallbethehighestmeasureddemand(corrected <br />forpowerfactorifrequired)duringanyfifteen(15)minuteperiodoccurringinthecurrentbillingperiod. <br />ButinnomonthshallthebillingdemandbegreaterthanthevalueinkWdeterminedbydividingthe <br />kWhsalesforthebillingmonthby75hourspermonth.Thisbillingadjustmentappliesonlyifthe <br />ĭǒƭƷƚƒĻƩƭpeakdemandDOESNOToccurbetweenthehoursof3:00p.m.and10:00p.m. <br />FluctuatingLoads:Customersoperatingequipmenthavingahighlyfluctuatingorlargeinstantaneous <br />demand,suchasweldersandXraymachines,shallberequiredtopayallnonbettermentcostsof <br />isolatingtheloadfromthebalanceof9wa <br />ƭsystemsothattheloadwillnotundulyinterferewith <br />serviceon9wa <br />ƭlines.Nomotorlargerthanten(10)HP(or7.355kW)willbeallowedtobeacross <br />thelinestartedwithoutnotificationandwrittenauthorizationfromERMU. <br />Inaddition,Customerswhofailtoprovideadequatecorrectiveequipmentshallberequiredtoownand <br />maintaintheirowntransformers. <br />PowerFactorAdjustment:Forloadsof50kWormore,orattheoptionofERMUforloadsoflessthan <br />rfactoradjustmentswillbemadeinthebillingdemand,whenthepowerfactor,as <br />50kW,powe <br />determinedbytest,atthetimeofthe/ǒƭƷƚƒĻƩƭmaximumuseislessthan98%.Ifthepowerfactor,as <br />measuredby9wa <br />ƭelectricdepartment,islowerthan98%,themonthlydemandchargemaybe <br />multipliedbytheratio98%dividedbythemeasuredpowerfactor,orat9wa <br />ƭoption,thepower <br />factormaybecorrectedatthe/ǒƭƷƚƒĻƩƭexpense. <br />BillingandTermsofPayment:SeeERMUServicePoliciesPolicy(BillingDueDates,andPenaltiesand <br />DelinquentNotices.) <br />TermsandConditions: <br />1. Usagemaybefractionalizedontheactualdaysofserviceforapplicationofachangeinrate. <br />2. Servicewillbefurnishedpursuantto9wa <br />ƭrules. <br />3. Extensionsmadeforserviceunderthisschedulearesubjecttotheprovisionsof9wa <br />ƭrules <br />governingExtensionofServiceandFacilities. <br />4. Theratessetforthhereinmaybemodifiedbytheamountofanygovernmentalchanges <br />imposedandleviedontransmission,distribution,production,orthesaleofelectricalpower. <br />5. Exceptionsbymanagementapprovalonly. <br />AdoptedDecember14,2021 <br />AmendedJanuary11,2022 <br />EffectiveJanuary1,2022 <br />Page2of2 <br />97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.