My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1v ERMUSR 01-11-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2022
>
01-11-2022
>
5.1v ERMUSR 01-11-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2022 3:43:13 PM
Creation date
1/7/2022 3:43:13 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TransmissionTransformedServiceRate <br />CapacityCharge: <br />CapacitychargesaredeterminedbyCustomerselectionofoneoftheoptionsbelow: <br />A. Ifcustomerhasitsowngeneration,thenthecapacitybillingdeterminantshallbethemaximum <br />metered15minutedemandinexcessof/ǒƭƷƚƒĻƩƭregisteredgenerationinagivenmonth.To <br />terminant,/ǒƭƷƚƒĻƩƭgenerationmustberegisteredwithMISOand <br />qualifyforthisbillingde <br />complywithallMISOrequirementsforcapacityresources. <br />B. IfCustomerdoesnothaveitsowngeneration,orifCustomerfailstoregisteritsgenerationwith <br />MISOorfailstocomplywithallMISOrequirementsforcapacityresources,thenthecapacity <br />billingdeterminantshallbemonthlymaximummetered15minuteCustomerdemand. <br />Thefollowingchargesshallapplytoallcapacityquantities.Theabovedefinedbillingdeterminant <br />multipliedby: <br />A. $10.9011.00perkWmonthforallcapacityquantitiesduringthemonthsofJunethrough <br />September. <br />B. $3.603.75perkWmonthforallcapacityquantitiesduringthemonthsofOctoberthroughMay. <br />EnergyCharge: <br />Energybillingisdeterminedbyactualhourlyusage.Thefollowingchargesshallapplytoallenergy(kWh) <br />quantities: <br />A. MISORealTimeLocationalMarginalPriceattheapplicableMISONode. <br />B. AllapplicableMISOAncillaryServicesCharges. <br />C. MISOMultiValueProjectCharges. <br />D. Achargeof$0.002perkWhforthecostofcompliancewiththeStateofaźƓƓĻƭƚƷğƭRenewable <br />EnergyStandard. <br />E. Achargeof$0.01perkWhtocoveralldispatch,billing,andadministrativecosts.Thischarge <br />shallbeinclusiveofallregulatorychargescollectedbyUtilityonallcustomers. <br />Cityfees,suchasfranchiseandstormwater,willapply. <br />Federal,state,andlocaltaxesmayapply. <br />FailuretoGenerate:IfCustomerhasregisteredgenerationthatdoesnotperformasregisteredwhen <br />requestedbyutility,ǒƷźƌźƷǤƭwholesalesupplier,orMISO,Customershallberesponsiblefor: <br />A. AnyfinancialorotherpenaltiesimposedbyMISOrelatedtotheŭĻƓĻƩğƷźƚƓƭfailuretoperform. <br />B. AllcostsofutilityorǒƷźƌźƷǤƭwholesalesuppliertoacquirereplacementcapacitytoreplace <br />registeredgenerationthatdidnotperform. <br />TransformationCharge:Customershallpayamonthlytransformationchargebasedonthecostof <br />providingtransmissiontransformedservicetoCustomer,includingrecoveryofcostsforanynew <br />ties. <br />substationorrelatedfacili <br />Page2of3 <br />93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.