My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1u ERMUSR 01-11-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2022
>
01-11-2022
>
5.1u ERMUSR 01-11-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2022 3:42:50 PM
Creation date
1/7/2022 3:42:50 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LargeIndustrialDemandElectricServiceRate <br />DeterminationofBillingDemand:Thebillingdemandshallbethehighestmeasureddemand(corrected <br />forpowerfactorifrequired)duringanyfifteen(15)minuteperiodoccurringinthecurrentbillingperiod. <br />FluctuatingLoads:Customersoperatingequipmenthavingahighlyfluctuatingorlargeinstantaneous <br />demand,suchasweldersandXraymachines,shallberequiredtopayallnonbettermentcostsof <br />isolatingtheloadfromthebalanceof9wa <br />ƭsystemsothattheloadwillnotundulyinterferewith <br />serviceon9wa <br />ƭlines.Nomotorlargerthanten(10)HP(or7.355kW)willbeallowedtobeacross <br />thelinestartedwithoutnotificationandwrittenauthorizationfromERMU. <br />PowerFactorAdjustment:Powerfactoradjustmentsmaybemadeinthebillingdemand,whenthe <br />powerfactor,asdeterminedbytest,atthetimeofthe/ǒƭƷƚƒĻƩƭmaximumuseislessthan98%.Ifthe <br />powerfactor,asmeasuredbyERM <br />ƭelectricdepartment,islowerthan98%,themonthlydemand <br />chargemaybemultipliedbytheratio98%dividedbythemeasuredpowerfactor,orat9wa <br />ƭoption, <br />thepowerfactormaybecorrectedatthe/ǒƭƷƚƒĻƩƭexpense. <br />BillingandTermsofPayment:SeeERMUServicePoliciesPolicy(BillingDueDates,andPenaltiesand <br />DelinquentNotices.) <br />TermsandConditions: <br />1. Usagemaybefractionalizedontheactualdaysofserviceforapplicationofachangeinrate. <br />2. Servicewillbefurnishedpursuantto9wa <br />ƭrules. <br />eprovisionsof9wa <br />ƭrules <br />3. Extensionsmadeforserviceunderthisschedulearesubjecttoth <br />governingExtensionofServiceandFacilities. <br />4. Theratessetforthhereinmaybemodifiedbytheamountofanygovernmentalchanges <br />imposedandleviedontransmission,distribution,production,orthesaleofelectricalpower. <br />5. Exceptionsbymanagementapprovalonly. <br />AdoptedDecember14,2021 <br />AmendedJanuary11,2022 <br />EffectiveJanuary1,2022 <br />Page2of2 <br />91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.