Laserfiche WebLink
Complete site excavating for the Phased 2020 Jackson Hills Residential Suites <br />Phase 2 to include the following items: <br /> - Mobilization <br /> - Obtain and manage SWPPP <br /> - Install perimeter erosion control and rock entrance <br /> - Clear and Grub trees and brush <br /> - Strip and salvage Black Dirt for respread <br /> - Remove all unsuitable soils within Building and Parking lot per soil borings <br /> - Import and place clean sand to replace unsuitable soils <br /> - Subgrade site per plan <br /> - Dig and Backfill footings <br /> - Install drain tile around elevator pit and daylight into pond <br /> - Install Sewer and Water per plan with dewatering <br /> - Install Storm Sewer per plan (PVC pipe figured where storm crosses water) <br /> - Install 4" Radon Rock after plumbing underground <br /> - Import, Place and Tolerance Class 5 for pavement <br /> - Final Grade all green spaces <br /> - Infiltrometer Tests in Infiltration Pond <br />Phase 2 785,000.00$ <br /> - Wet tap included for water connection in street <br /> - No concrete or asphalt replacement included for water and sewer connections <br /> - No detour included if required by city for street closure <br />PLEASE NOTE: <br /> - NO Bond fees, Permit fees, Staking, Surveying, or Testing included <br /> - Dewatering for footing installation not included <br /> - No surveying included for monitoring settlement from dewatering process <br /> - No Temporary or Permanent stabilization included <br /> - Price good for 1 year from date of proposal <br /> - Estimated increase of 5-10% after 1 year <br /> Proposal 4-17-20 <br />Kraemer Trucking & Excavating Inc. <br />Jackson Residential Suites <br />Elk River, Minnesota