My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2 SR 01-03-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
01-03-2022
>
7.2 SR 01-03-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 12:58:11 PM
Creation date
12/30/2021 10:34:41 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kraemer Trucking & Excavating Inc. <br />Jackson Residential Suites <br />Elk River, Minnesota <br />Proposal 4-17-20 <br />Complete site excavating for the Phased 2020 Jackson Hills Residential Suites <br />Phase 2 to include the following items: <br />- Mobilization <br />- Obtain and manage SWPPP <br />- Install perimeter erosion control and rock entrance <br />- Clear and Grub trees and brush <br />- Strip and salvage Black Dirt for respread <br />- Remove all unsuitable soils within Building and Parking lot per soil borings <br />- Import and place clean sand to replace unsuitable soils <br />- Subgrade site per plan <br />- Dig and Backfill footings <br />- Install drain tile around elevator pit and daylight into pond <br />- Install Sewer and Water per plan with dewatering <br />- Install Storm Sewer per plan (PVC pipe figured where storm crosses water) <br />- Install 4" Radon Rock after plumbing underground <br />- Import, Place and Tolerance Class 5 for pavement <br />- Final Grade all green spaces <br />- Infiltrometer Tests in Infiltration Pond <br />Phase 2 $ 785,000.00 <br />- Wet tap included for water connection in street <br />- No concrete or asphalt replacement included for water and sewer connections <br />- No detour included if required by city for street closure <br />PLEASE NOTE: <br />NO Bond fees, Permit fees, Staking, Surveying, or Testing included <br />- Dewatering for footing installation not included <br />- No surveying included for monitoring settlement from dewatering process <br />- No Temporary or Permanent stabilization included <br />- Price good for 1 year from date of proposal <br />Estimated increase of 5-10% after 1 year <br />
The URL can be used to link to this page
Your browser does not support the video tag.