My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7 SR 01-03-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
01-03-2022
>
4.7 SR 01-03-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 12:57:11 PM
Creation date
12/29/2021 3:04:35 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOCUMENT 00 52 00 <br />STANDARD FORM OF AGREEMENT <br />THIS AGREEMENT is by and between the City of Elk River ("Owner") and Northwest Asphalt, Inc. ("Contractor"). Owner and <br />Contractor hereby agree as follows: <br />ARTICLE 1β WORK <br />1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally <br />described as follows: <br />Bituminous, Pavement Removal, Concrete Removal, Removals, Grading, Construction of Storm Sewer, Culverts, <br />Construction of Base, Bituminous Paving, Concrete Curb and Gutter, Pavement Markings, Traffic Signs, Trails, Erosion <br />Control, and Restoration. <br />ARTICLE 2βTHE PROJECT <br />2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: <br />Natures Edge Business Center Third Addition <br />ARTICLE 3 β ENGINEER <br />3.01 The Project has been designed by Hakanson Anderson. <br />3.02 The Owner has retained Hakanson Anderson ("Engineer") to act as Owner's representative, assume all duties and <br />responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4β CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment <br />as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Contract Times: Dates <br />A. All Work including Bituminous, Pavement Removal, Concrete Removal, Removals, Grading, Construction of <br />Storm Sewer, Culverts, Sanitary Sewer, Watermain, Bituminous Paving of non wear on 1681h Avenue and Polk <br />Street, Bituminous Paving of non wear and wear course on 1651h Avenue turn lane, Concrete Curb and Gutter, <br />Pavement Markings, Trails, Erosion Control, and Restoration will be substantially completed on or before <br />August 15, 2022, and completed and ready for final payment in accordance with Paragraph 15.06 of the General <br />Conditions on or before June 15, 2023. The bituminous wear course shall not be constructed until one <br />freeze/thaw cycle following the construction of the non wear course on 1681h Avenue and Polk Street. <br />B. Parts of the Work shall be substantially completed on or before the following Milestone(s): <br />Standard Form of Agreement <br />00 52 00-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.