Laserfiche WebLink
NORTHWEST ASPHALT BID <br />CITY OF ELK RIVER <br />NATURES EDGE BUSINESS CENTER THIRD ADDITION <br />Base Bid <br />Northwest Asphalt <br />ITEM <br />NO. <br />Mn/DOT <br />SPEC. NO. <br />ITEM DESCRIPTION <br />UNIT <br />ESTIMATED <br />QUANTITY <br />UNIT PRICE <br />EXTENSION <br />59 <br />2504.603 <br />6" WATERMAIN DUCTILE IRON CL 52 <br />LIN FT <br />85 <br />$65.00 <br />$5,525.00 <br />60 <br />2504.603 <br />8" WATERMAIN DUCTILE IRON CL 52 <br />LIN FT <br />301 <br />$66.00 <br />$19,866.00 <br />61 <br />2504.603 <br />12" WATERMAIN DUCTILE IRON CL 52 <br />LIN FT <br />2751 <br />$66.70 <br />$183,491.70 <br />62 <br />2504.603 <br />8" HDPE WATERMAIN DIRECTIONAL DRILLED <br />LIN FT <br />50 <br />$175.00 <br />$8,750.00 <br />63 <br />2504.603 <br />12" HDPE WATERMAIN (DIRECTIONAL DRILLED) <br />LIN FT <br />848 <br />$72.00 <br />$61,056.00 <br />64 <br />2504.604 <br />3" POLYSTYRENE INSULATION <br />SQ YD <br />40 <br />$37.00 <br />$1,480.00 <br />65 <br />2504.608 <br />DUCTILE IRON FITTINGS <br />POUND <br />6500 <br />$11.50 <br />$74,750.00 <br />66 <br />2506.502 <br />CASTING ASSEMBLY <br />EACH <br />31 <br />$462.00 <br />$14,322.00 <br />67 <br />2506.503 <br />CONSTRUCT SANITARY STRUCTURE DESIGN 4007 <br />LIN FT <br />216.2 <br />$287.00 <br />$62,049.40 <br />68 <br />2506.503 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 24"X36" <br />LIN FT <br />13.6 <br />$586.00 <br />$7,969.60 <br />69 <br />2506.503 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />LIN FT <br />33.1 <br />$477.00 <br />$15,788.70 <br />70 <br />2506.503 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 <br />LIN FT <br />32.5 <br />$731.00 <br />$23,757.50 <br />71 <br />2506.503 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 72-4020 <br />LIN FT <br />27.6 <br />$762.00 <br />$21,031.20 <br />72 <br />2506.503 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 96-4020 <br />LIN FT <br />12.1 <br />$1,268.00 <br />$15,342.80 <br />73 <br />2511.504 <br />GEOTEXTILE FILTER TYPE 4 <br />SQ YD <br />202 <br />$4.00 <br />$808.00 <br />74 <br />2511.507 <br />RANDOM RIPRAP CLASS IV <br />CU YD <br />35.9 <br />$166.00 <br />$5,959.40 <br />75 <br />2515.504 <br />ARTICULATED BLOCK MAT CLOSED CELL TYPE B <br />SQ YD <br />66 <br />$218.00 <br />$14,388.00 <br />76 <br />2521.518 <br />6" CONCRETE WALK <br />SQ FT <br />128 <br />$11.30 <br />$1,446.40 <br />77 <br />2531.503 <br />CONCRETE CURB AND GUTTER DESIGN B612 <br />LIN FT <br />101 <br />$25.65 <br />$2,590.65 <br />78 <br />2531.503 <br />CONCRETE CURB AND GUTTER DESIGN B618 <br />LIN FT <br />5150 <br />$12.65 <br />$65,147.50 <br />79 <br />2531.504 <br />7" CONCRETE DRIVEWAY PAVEMENT <br />SQ YD <br />28 <br />$63.00 <br />$1,764.00 <br />80 <br />2531.504 <br />8" CONCRETE DRIVEWAY PAVEMENT <br />SQ YD <br />55 <br />$63.00 <br />$3,465.00 <br />81 <br />2531.618 <br />TRUNCATED DOMES <br />SQ FT <br />20 <br />$100.00 <br />$2,000.00 <br />82 <br />2533.503 <br />PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 <br />LIN FT <br />725 <br />$14.50 <br />$10,512.50 <br />83 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />1 <br />$2,250.00 <br />$2,250.00 <br />84 <br />2564.518 <br />SIGN PANELS TYPE C <br />SQ FT <br />26.3 <br />$55.00 <br />$1,446.50 <br />85 <br />2564.602 <br />INSTALL SIGN <br />EACH <br />2 <br />$150.00 <br />$300.00 <br />86 <br />2573.501 <br />STABILIZED CONSTRUCTION EXIT <br />LUMP SUM <br />1 <br />$1,500.00 <br />$1,500.00 <br />87 <br />2573.501 <br />EROSION CONTROL SUPERVISOR <br />LUMP SUM <br />1 <br />$1,500.00 <br />$1,500.00 <br />88 <br />2573.502 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />17 <br />$150.00 <br />$2,550.00 <br />89 <br />2573.502 <br />CULVERT END CONTROLS <br />EACH <br />4 <br />$250.00 <br />$1,000.00 <br />90 <br />2573.503 <br />SILT FENCE; TYPE MS <br />LIN FT <br />4300 <br />$2.62 <br />$11,266.00 <br />91 <br />2573.503 <br />SEDIMENT CONTROL LOG TYPE WOOD FIBER <br />LIN FT <br />9200 <br />$2.77 <br />$25,484.00 <br />92 <br />2574.508 <br />FERTILIZER TYPE 1 <br />POUND <br />7560 <br />$0.64 <br />$4,838.40 <br />93 <br />2575.504 <br />SODDING TYPE LAWN <br />SQ YD <br />600 <br />$9.15 <br />$5,490.00 <br />94 <br />2575.504 <br />ROLLED EROSION PREVENTION CATEGORY 15 <br />SQ YD <br />42147 <br />$1.59 <br />$67,013.73 <br />95 <br />2575.508 <br />SEED MIXTURE 25-131 <br />POUND <br />4576 <br />$4.93 <br />$22,559.68 <br />96 <br />2575.508 <br />SEED MIXTURE 33-261 <br />POUND <br />154 <br />$25.20 <br />$3,880.80 <br />97 <br />2575.508 <br />HYDRAULIC MULCH MATRIX <br />POUND <br />5000 <br />$0.74 <br />$3,700.00 <br />98 <br />2575.509 <br />MULCH MATERIAL TYPE 1 <br />TON <br />58.8 <br />$0.01 <br />$0.59 <br />99 <br />2575.605 <br />SEEDING <br />ACRE <br />25.4 <br />$595.00 <br />$15,113.00 <br />100 <br />2582.503 <br />4" SOLID LINE MULTI -COMPONENT <br />LIN FT <br />715 <br />$0.75 <br />$536.25 <br />101 <br />2582.503 <br />4" DOUBLE SOLID LINE YELLOW- EPDXY <br />LIN FT <br />2359 <br />$1.50 <br />$3,538.50 <br />102 <br />1 2582.518 <br />IPAVEMENT MESSAGE MULTI -COMPONENT <br />SQ FT <br />90 <br />$6.50 <br />$585.00 <br />BASE BID TOTAL $1,967,329.71 <br />Page 2 of 2 <br />