Laserfiche WebLink
<br />The base amount associated with Category C cost recovery calculations <br /> <br /> <br />shall be 75 percent of the eligible project cost d.ivided by appropriate <br /> <br /> <br />recovery period which shall be equal to 30 years or the useful life of <br /> <br />the City facilities, whichever is less. <br /> <br />ICRC payments shall be made by industrial users no less than annually. <br /> <br />The industrial users shall be based on all factors which significantly <br /> <br />influence the cost of the City's facilities. Factors such as strength, <br /> <br />volume and delivery flow rate characteristics shall be considered and <br /> <br />included to insure a proportional distribution of the grant assistance <br /> <br />allocable to industrial use to all industrial users of the facilities. <br /> <br />As a minimum, an industries payments shall be proprotional to its flow, <br /> <br />in relation to the City facilities flow capacity. In the event of a <br /> <br />substantial change in the strength, volume or delivery flow rate <br /> <br />introduced into the City facilities by an industrial user, such user's <br /> <br />share shall be adjusted accordingly. An industrial user's share shall <br /> <br />not include an interest component. <br /> <br />The City shall retain 50% of the amounts recovered from industrial users. <br /> <br />The remainde~, together with any interest earned thereon shall be returned <br /> <br />to the U.S. Treasury on an annual basis. <br /> <br />A minimum of 80% of the obtained amounts together with the interest <br /> <br />thereon shall be used solely for the expansion and reconstruction of <br /> <br />City facilities associated with the project and necessary to meet the <br /> <br />~equirements of the Federal Water Pollution Control Act Amendments of <br /> <br />1~72. The City shall obtain the written approval of the EPA Regional <br /> <br />Administrator prior to. commitment of the retained amount for any <br /> <br /> <br />expansion and reconstruction. The remainder of the ~etained amounts <br /> <br />may be used as the City sees fit. <br /> <br />Section 2:35 - Industrial Charges and Industrial Cost Recovery Charges <br /> <br />1. The industrial charges for debt service for the City project <br /> <br />(2:30 - Category A) shall be determined as follows: <br /> <br />-7- <br />