Laserfiche WebLink
Precire Heating <br />15-1500 <br />22A <br />CCp1J RFIp11£ <br />$ - <br />$ - <br />$ (1,623.33) <br />$ (1,623.33) <br />$ (1,623.33) <br />Precire Heating <br />15-1500 <br />22A <br />CCp18 RFIp92 <br />$ - <br />$ - <br />$ 8,595.42 <br />$ 8,595.42 <br />$ 8,595.42 <br />Prelise Heating <br />15-1511 <br />22A <br />CCp19 RFIp123 <br />$ - <br />$ - <br />$ (22J.41) <br />$ (227.41) <br />$ (227.41) <br />P111ise Heating <br />15-1500 <br />22A <br />C3p20 PRp21 <br />$ - <br />$ - <br />$ 1,J69.50 <br />$ 1,769.50 <br />$ 1,J69.50 <br />PL"I" Heating <br />15-1500 <br />22A <br />C3p21 Expansion tankin FD <br />$ - <br />$ - <br />$ 568.33 <br />$ 568.33 <br />$ 568.33 <br />P111ise Heating <br />15-1500 <br />22A <br />C3p22 PRp24It- C111-Or <br />$ - <br />$ - <br />$ 6,OJ 1.95 <br />$ 6,OJ1:9: <br />$ 6, OJ1.95 <br />PL""Heating <br />15-1500 <br />22A <br />CCW23 RFIp142 Added MEP Demo <br />$ - <br />$ - <br />$ 545.29 <br />$ 545.29 <br />$ 545.29 <br />P111ise Heating <br />15-1500 <br />22A <br />CO <br />024 RFIp143120 Floor-m <br />$ - <br />$ - <br />$ 321.98 <br />$ 321.98 <br />$ 321.9E <br />PrecI Heating <br />15-1500 <br />22A <br />C3p25 Creditto Eliminate New Floor Dain <br />$ - <br />$ - <br />$ (1,319.94) <br />$ (1,319.94) <br />(1,319.94' <br />P111ise Heating <br />15-1500 <br />22A <br />ff0#26 RFIp1621 nstall Water Supply for KH,hen 117 <br />$ - <br />$ - <br />$ 381.11 <br />$ 381.11 <br />$ - <br />$ 381.11 <br />PL"I" Heating <br />15-1500 <br />22A <br />C3p27 Garbage U1,0111 at Sk-3 in Ki Then 117 <br />$ - <br />$ - <br />$ 419.80 <br />$ 419.80 <br />$ - <br />$ 419.80 <br />P111ise Heating <br />15-1500 <br />22A <br />C3p2A RFIp145 Salvage& Reinstall IS Sink in 122 <br />$ - <br />$ - <br />$ 248.99 <br />$ 248.99 <br />$ 248.99 <br />PrecI Heating <br />15-1500 <br />22A <br />CCW29 tredit for Eyewash Install in Shop 113 <br />(9J283) <br />$ (9J283) <br />(9J2.83', <br />P111ise Heating <br />15-1500 <br />22A <br />CCp'30 RFIp163&p146 Plumbing Change= <br />$ - <br />$ - <br />$ J,51636 <br />$ J,51636 <br />$ 7,516.76 <br />PL""Heating <br />15-1500 <br />22A <br />CCW31 PRHVAC <br />$ - <br />$ - <br />$ 1,614.80 <br />$ 1,614.80 <br />$ - <br />$ 1,614.80 <br />P111ise Heating <br />15-1500 <br />22A <br />CC#32 PRp'31 Install Fresh Air Intake -to SCBA <br />$ - <br />$ - <br />$ 1,06J.35 <br />$ 1,06J.35 <br />1,06J.35 <br />PL""Heating <br />15-1500 <br />22A <br />CCW33 Add to Extend Hot Warr recirc to PD L2 <br />$ - <br />$ - <br />$ 1,351.42 <br />$ 1,351.42 <br />$ - <br />$ 1,351.42 <br />Prelise Heating <br />15-1500 <br />22A <br />CCp34 Install Water and Air Reels at PD Garage <br />$ - <br />$ - <br />$ 6,366.59 <br />$ 6,366.59 <br />$ - <br />Summit H" <br />15-1533 <br />21A <br />Polite Lab or <br />$ 22,500.00 <br />$ - <br />$ - <br />$ 22,500.00 <br />$ 22,500.00 <br />Summit Flre <br />15-1533 <br />21A <br />Po ice Material <br />$ 12,100.00 <br />$ - <br />$ - <br />$ 12,100.00 <br />$ 12,100.So <br />Summit H" <br />15-1533 <br />21A <br />Fire lab or <br />$ 11,500.00 <br />$ - <br />$ - <br />$ 11,500.00 <br />$ 9,J50.00 <br />$ 1,750.00 <br />Summit Fire <br />15-1533 <br />21A <br />Fire Matenal <br />$ 6,200.00 <br />$ - <br />$ - <br />$ 6,200. So <br />$ 6,200.00 <br />Summit H, <br />15-1533 <br />2 1 A <br />CCp1P- Fire Suppression Modifications <br />$ - <br />$ - <br />$ 500.00 <br />$ 500.00 <br />$ - <br />Kl ein Electlic <br />il' <br />16-1600 <br />26A <br />Mobilization <br />$ 17328.00 <br />$ - <br />$ - <br />$ 17328.00 <br />$ 17321.00 <br />Klein Etel <br />16-1600 <br />26A <br />P111H/Bond <br />$ 4,500.00 <br />$ - <br />$ - <br />$ 4,500. So <br />$ 4,500.00 <br />Klein Electric <br />16-1600 <br />26A <br />ExtenorTemp Services/Job Trailer Temp Power <br />$ 1, 500.00 <br />$ - <br />$ - <br />$ 1, 500.00 <br />$ 1, 500.00 <br />Klein Electric <br />16-1600 <br />26A <br />Switchg-LjPanels/Border States El e,t it <br />$ 4,J3J.00 <br />$ - <br />$ - <br />$ 4,J3J.00 <br />$ 4,737.00 <br />Klein Electric <br />16-1600 <br />26A <br />Light Fx Wres/Controls/W Brener Electric Co. <br />$ 109,114.00 <br />$ - <br />$ - <br />$ 109,114.00 <br />$ 109,114.00 <br />Klein Electric <br />16-PASS <br />26A <br />Div 28/H, Alann/Twenty45even <br />$ 22,66J.00 <br />22,66J.00 <br />$ 20,066.00 <br />$ 2,601.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD-Demolition <br />$ 2,19J.00 <br />$ - <br />$ - <br />$ 2, 19J.00 <br />$ 2,19J.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD- Tempo— Power/light= <br />$ 1,146.00 <br />$ - <br />$ - <br />$ 1,146.00 <br />$ 9J5.So <br />$ 171.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD-Si to Underground <br />Material <br />$ 1,060.00 <br />$ - <br />$ - <br />$ 1,060.00 <br />$ 1,060.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD-Si to Underground <br />Labor <br />$ 2,9210.00 <br />$ - <br />$ - <br />$ 2,980.00 <br />$ 2,980.So <br />Klein Electric <br />16-1600 <br />26A <br />FD-Si to Pole &are <br />Material <br />$ 922.00 <br />$ - <br />$ - <br />$ 922.00 <br />$ 92200 <br />Klein Electric <br />16-1600 <br />26A <br />FD-Site Pole Bare <br />Labor <br />$ 817.00 <br />$ - <br />$ - <br />$ 81J.00 <br />$ 81J.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD- Site Set Parking Lot Poles <br />$ 473.00 <br />$ - <br />$ - <br />$ 4273.00 <br />$ 473.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD-1itchgear/Panels Install <br />Material <br />$ 1,127.00 <br />$ - <br />$ - <br />$ 1,12J.So <br />$ 1, 12J.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD-Suitchgear/Panels Install <br />Labor <br />$ 1,886.00 <br />$ - <br />$ - <br />$ 1,996.00 <br />$ 1,996.00 <br />Kl ein Electric <br />16-1600 <br />26A <br />FD- Light Fi x W re Install <br />Material <br />$ 4,298.00 <br />$ - <br />$ - <br />$ 4,298.00 <br />$ 3,009.00 <br />$ 1,OJ5.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD-Light Fix Wre Install <br />Labor <br />$ 13,351.00 <br />$ - <br />$ - <br />$ 13,351.00 <br />$ 9,346.00 <br />$ 3,338.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD-Light Fix Wre Control)Install <br />Material <br />$ 1, 012.00 <br />$ - <br />$ - <br />$ 1,012.00 <br />$ 709.00 <br />$ 303.00 <br />Kl ein Electric <br />16-1600 <br />26A <br />FD-Light Fix Wre Control) Install <br />Labor <br />$ 2,8J5.00 <br />$ - <br />$ - <br />$ 2,8J5.00 <br />$ 2,013.00 <br />$ 86200 <br />Klein Electric <br />16-1600 <br />26A <br />FD-Precast Rough -In'= <br />Material <br />$ 1,350.00 <br />$ - <br />$ - <br />$ 1,350.00 <br />$ 1,350.00 <br />Kl ein Electric <br />16-1600 <br />26A <br />FD-Precast Rough -In'= <br />Labor <br />$ 4,1OJ.00 <br />$ - <br />$ - <br />$ 4,1OJ.00 <br />$ 4,1607 0 <br />Klein Electric <br />16-1600 <br />26A <br />FD-Power/Devices/Re,ept,dle, <br />Material <br />$ 9,485.00 <br />$ - <br />$ - <br />$ 9,485.00 <br />$ 6,166.So <br />$ 3,319.So <br />Klein Electric <br />16-1600 <br />26A <br />FD-Power/Devices/Relep teal es <br />Labor <br />$ 16,038.00 <br />16,038.00 <br />$ 10,426.00 <br />$ 5,61200 <br />Klein Electric <br />16-1600 <br />26A <br />FD-Unit Heater= <br />Material <br />$ 429.00 <br />$ - <br />$ - <br />$ 429.00 <br />$ 300.00 <br />$ 86.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD-Unit Heater= <br />Labor <br />$ 1,256.00 <br />$ - <br />$ - <br />$ 1,256.00 <br />$ 8J9.00 <br />$ 126.00 <br />Kl el Electric <br />16-1600 <br />26A <br />FD-Exhaust Fans <br />Material <br />$ 463.00 <br />$ - <br />$ - <br />$ 463.00 <br />$ 463.So <br />Klein Electric <br />16-1600 <br />26A <br />FD-Exhaust Fans <br />Labor <br />$ 950.00 <br />$ - <br />$ - <br />$ 950.00 <br />$ 950.00 <br />Kl ein Electric <br />16-1600 <br />26A <br />FD-VAV's <br />Material <br />$ 291.00 <br />$ - <br />$ - <br />$ 291.00 <br />$ 262.00 <br />$ 29.So <br />Klein Electric <br />16-1600 <br />26A <br />FD-I 's <br />Labor <br />$ 816.00 <br />$ - <br />$ - <br />$ 816.00 <br />$ J34.00 <br />$ 82.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD- B hers <br />Material <br />$ 196.00 <br />$ - <br />$ - <br />$ 196.00 <br />$ 1J6.00 <br />$ 20.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD-Boilers <br />Labor <br />$ 339.00 <br />$ - <br />$ - <br />$ 339.00 <br />$ 305.00 <br />$ 34.00 <br />Kl ein Electric <br />16-1600 <br />26A <br />FD-Pumps <br />Material <br />$ 754.00 <br />$ - <br />$ - <br />$ 3754.00 <br />$ 679.00 <br />$ 75.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD -Pumps <br />Labor <br />$ 2, 096.00 <br />2, 096.00 <br />$ 1,886.00 <br />$ 210.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD- MAU <br />Material <br />$ 219.00 <br />$ - <br />$ - <br />$ 219.00 <br />$ 219.00 <br />Klein Electric <br />16-1600 <br />26A <br />FD- MAU <br />Labor <br />$ 797.00 <br />$ - <br />$ - <br />$ 79J.00 <br />$ J9J.00 <br />Kl ein Electric <br />16-1600 <br />26A <br />FD-CU <br />Material <br />$ 764.00 <br />$ - <br />$ - <br />$ 764.00 <br />$ 68J.00 <br />$ 77.00 <br />$ - 0.00%1 $ 6,366.59 I $ <br />$ 22,500.00 100.00% $ - $ 1,125.01 <br />$ 12, 100.00 100.00% $ - $ 605.00 <br />$ 11,500.00 100.00% $ - $ 575.00 <br />$ 6,200.00 100.00A. $ - $ 310.00 <br />5 - 0.00% 5 500.00 5 - <br />