My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1h ERMUSR 12-12-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
12-12-2021
>
6.1h ERMUSR 12-12-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 3:46:12 PM
Creation date
12/13/2021 3:46:12 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Crews continue to terminate wire in some of the new housing developments that have <br /> been constructed this past year. Most of these should be finished by the end of the year <br /> and ready for new homes. <br /> • Crews finished collecting oil samples from all the dead front switchgears located on the <br /> system. We currently have over 70. <br /> • Crews worked with the meter shop to de-energize the Station 14 Bank 3 transformer, <br /> then added oil to the load tap changer control and changed the high side lightning <br /> arresters. <br /> • Installed wire and a transformer for a three phase service to a new business building in <br /> Otsego south of Coborn's. <br /> • Crews finished the work related to the County Road 13 reconstruction project. The road <br /> is scheduled to open mid-December. <br /> • Installed the wire and transformer pad for three phase service at the field services <br /> building. <br /> • Installed another run of primary line down Lander Street. This area is scheduled to <br /> receive new primary line throughout in 2022. <br /> • A crew installed wreaths/banners for the holiday season on the light poles in downtown <br /> Elk River. <br /> • Staff is working on finalizing tree trimming objectives for the 2022 season. <br /> • Working on the final plan for the next phase of the overhead rebuild along County Road <br /> 35 that will begin in January 2022. <br /> • Collaborating with staff on getting material secured for 2022 construction season. <br /> Page 2 of 2 <br /> 151 <br />