Laserfiche WebLink
Elk River ---- <br /> Municipal Utilities <br /> ELECTRIC VEHICLE CHARGING RATES <br /> Residential and Commercial Electric Vehicle Charging Rate <br /> Available:Within Elk River Municipal Utilities (ERMU) established service territory. <br /> Applicable:To single family residences, non-demand and demand customers receiving service under <br /> another rate. <br /> Electric Vehicle Charging Rate:This Program is available to all customers of ERMU that own an <br /> electrically powered vehicle used for on road transportation. Charging of the vehicle can occur any time <br /> but will be subject to on-peak and off-peak energy charges per hour daily. On-peak hours are Monday <br /> through Friday between 10 AM and 10 PM. Off-peak hours are Monday through Friday between 10 PM <br /> and 10 AM, Saturdays,Sundays, and the following holidays ( New Year's Day, Memorial Day, <br /> Independence Day, Labor Day,Thanksgiving Day, and Christmas Day). <br /> To qualify for the special rate,the customer shall provide: <br /> 1. Electric vehicle charging station that is used for the sole purpose of charging electric vehicles. <br /> This charging station must be 240 volt. <br /> 2. Customer is responsible for installation of the additional meter socket in a mutually agreed upon <br /> location. <br /> 3. Inspection by a State Certified electrical inspector of all metering equipment and provide an <br /> affidavit to ERMU when completed. <br /> ERMU shall provide: <br /> 1. All on-peak electric energy consumed by the electric vehicle charging equipment will be at the <br /> summer rate of$0.13341270/kWh for the five monthly billing periods of June—October, and <br /> the winter rate of$0.121844-69/kWh for the seven monthly billing periods of November—May. <br /> 2. All off-peak electric energy consumed by electric vehicle charging equipment will be at the rate <br /> of$0.06329692/kWh. <br /> 3. This equipment will be available for charging at applicable rates 24 hours per day and is not <br /> subject to any load control strategies. <br /> 4. All electric energy provided to an account that participates in this rate will be automatically <br /> enrolled in the Clean Energy Choice Program at the 100 percent participation level at no <br /> additional monthly charge. <br /> 5. All electric energy provided for the electric vehicle charging equipment will be 100 percent <br /> renewable. <br /> 6. Electric meter. <br /> 7. Final inspection prior to meter activation to ensure only qualified loads are being supplied <br /> through the electric vehicle charging equipment. <br /> Page 1 of 2 <br /> 116 <br />