My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.13 SR 12-06-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
12-06-2021
>
4.13 SR 12-06-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 1:30:30 PM
Creation date
12/2/2021 4:02:18 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER$ <br />PLANNERS <br />D ESIGNERS <br />Consulting Group, Inc. <br />PROPOSAL REQUEST <br />Date: 06/18/2021 <br />Project: Orono Park <br />General Site Improvements <br />18599 Gary Street <br />Elk River, MN 55330 <br />Owner: City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />SRFNa 13673 A <br />PR No.: 003 <br />To: Wyatt Gutzke <br />New Look Contracting <br />14045 Northdale Boulevard <br />Rogers, MN 55374 <br />From: Tim Wold <br />SRF Consulting Group, Inc. <br />3701 Wayzata Boulevard, Suite 100 <br />Minneapolis, MN 55416-3791 <br />Please submit an itemized cost estimate`,for changes in the Contract Sum and Contract Time for <br />proposed modifications to Contract Documents. Submit your cost within five days, or notify <br />Architect of the date you anticipate submitting your proposal. <br />This is not a change order or a direction to proceed with the work described in the proposed <br />modifications. <br />Reason for Change: ❑ Owner Request ❑ Unforeseen Condition ❑ Code Interpretation ® Other <br />1. Description of Changes: Remove existing water service for former drinking fountain <br />within proposed entrance drive to the south parking lot (based on discussion at the 6/17/21 <br />site meeting). <br />• Excavate to corporation stop on former drinking fountain water service shut-off. <br />Coordinate observation/inspection of this work with Elk River Municipal Water. <br />• Shut off corporation stop <br />• Remove water service line downstream from corporation stop. <br />Labor $ N ✓ 0 <br />Materials $ �- <br />OH&P <br />ONE CAmsoN PARRwAY, SUITE 150 1 MINNEAPoms, MN 55447 1 763.475.0010 1 www.sRFcoNsuLnNG.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.