Laserfiche WebLink
Elk River Youth Athletic Bldg Request for Change <br />9950165th Ave NW <br />Elk River, MN 55330 <br />To: Ebert Construction, Inc. RFC Number: RTL #002 <br />Original Contract <br />$11,959.00 <br />Other Approved Change Orders: <br />$0.00 <br />Total Contract to Date: <br />$11,959.00 <br />Other Pending Requests: <br />$0.00 <br />This Request: <br />$1,458.03 <br />RTL Job # 21-181 <br />Date:9/1/2021 <br />r Description of Change, Add gypsum board to the ceiling that was demo'd. (Taping already I <br />fi ured in base bid) _ <br />Cost Notes/Attachments <br />Labor $ 900.00 <br />Material $ _ 425.48 <br />Total Cost $ 1,325.48 <br />Overhead and Profit $ <br />132.55 10% <br />Self -Performed Total J <br />_ <br />$1,458.03 <br />Subcontractors $ <br />I <br />0.00 <br />Overhead and Profit on Subs $ <br />0.00 ' <br />Subcontractor Total <br />$0.00 <br />l Total Change in Contract <br />$1,458.03 1 I <br />I <br />Labor �--I�ours _ Gate <br />5heetrocking� r 10_ $90.00 $900.00� <br />Labor Total 10 __ $900.00 <br />�Matterial �Tot aI <br />Material Total $425.48 <br />The above work is subject to the same conditions as specified in the original contract unless otherwise stipulated. <br />Upon approval the sum of $1,458.03 will be added to the contract price. <br />Authorized Signature:__-- _ Date: <br />Ebert Construction, Inc. <br />