Laserfiche WebLink
YAC/Ebert Change Orders <br />Change # PR # <br />Date <br />Brief Description I <br />Total Cost <br />1 <br />001 <br />7/20 <br />Revising water services to come off well near the concessions building <br />$-738.00 <br />Subtotal <br />$-738.00 <br />2 <br />002 <br />9/28 <br />Revise site improvements based on shifting restroom bldg. 11 ft to the west <br />$8,908.44 <br />2 <br />004 <br />9/28 <br />Add electric feed to new building <br />$7,258.00 <br />Subtotal <br />$16,166.44 <br />3 <br />003 <br />10/18 <br />Increase water service size to restroom building from 1" to 2" <br />$1,074.96 <br />3 <br />005 <br />10/18 <br />Increase vent pipe size for concessions building per plumbing plan review <br />$736.16 <br />3 <br />006 <br />10/18 <br />Add gypsum board due to poor backing material. Replace moldy insulation and poly in ceiling of <br />concessions building. <br />$4,298.04 <br />3 <br />0010 <br />10/18 <br />General contractor overhead and profit/bonds not included in Change order 2 <br />$1403.65 <br />Subtotal <br />$7,512.81 <br />4 <br />007 <br />10/12 <br />Replacement windows <br />$9,314.06 <br />4 <br />009 <br />11/18 <br />Pressure Reducing Valve <br />$332.56 <br />4 <br />0011 <br />10/14 <br />Irrigation Valve Box <br />$1,054.73 <br />4 <br />0012 <br />10/22 <br />Paint Columns <br />$887.91 <br />4 <br />0013 <br />10/25 <br />Boarding up windows <br />$719.04 <br />4 <br />0014 <br />11/11 <br />Credit for no longer installing the column wraps -Ebert labor <br />-665.00 <br />008 <br />11/27 <br />Subtotal <br />Alternate BID accepted North Valley Bituminous <br />$11,643.30 <br />$18,204.49 <br />Subtotal <br />Grand Total <br />$17,392.55 <br />$51,977.10 <br />N:\Departments\Parks and Recreation\Administration\Projects\Orono Park and YAC Active Elk River\Changes orders (Updated 12-2-21) <br />