My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.13 SR 12-06-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
12-06-2021
>
4.13 SR 12-06-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 1:30:30 PM
Creation date
12/2/2021 4:02:18 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
YAC/Ebert Change Orders <br />Change # PR # <br />Date <br />Brief Description I <br />Total Cost <br />1 <br />001 <br />7/20 <br />Revising water services to come off well near the concessions building <br />$-738.00 <br />Subtotal <br />$-738.00 <br />2 <br />002 <br />9/28 <br />Revise site improvements based on shifting restroom bldg. 11 ft to the west <br />$8,908.44 <br />2 <br />004 <br />9/28 <br />Add electric feed to new building <br />$7,258.00 <br />Subtotal <br />$16,166.44 <br />3 <br />003 <br />10/18 <br />Increase water service size to restroom building from 1" to 2" <br />$1,074.96 <br />3 <br />005 <br />10/18 <br />Increase vent pipe size for concessions building per plumbing plan review <br />$736.16 <br />3 <br />006 <br />10/18 <br />Add gypsum board due to poor backing material. Replace moldy insulation and poly in ceiling of <br />concessions building. <br />$4,298.04 <br />3 <br />0010 <br />10/18 <br />General contractor overhead and profit/bonds not included in Change order 2 <br />$1403.65 <br />Subtotal <br />$7,512.81 <br />4 <br />007 <br />10/12 <br />Replacement windows <br />$9,314.06 <br />4 <br />009 <br />11/18 <br />Pressure Reducing Valve <br />$332.56 <br />4 <br />0011 <br />10/14 <br />Irrigation Valve Box <br />$1,054.73 <br />4 <br />0012 <br />10/22 <br />Paint Columns <br />$887.91 <br />4 <br />0013 <br />10/25 <br />Boarding up windows <br />$719.04 <br />4 <br />0014 <br />11/11 <br />Credit for no longer installing the column wraps -Ebert labor <br />-665.00 <br />008 <br />11/27 <br />Subtotal <br />Alternate BID accepted North Valley Bituminous <br />$11,643.30 <br />$18,204.49 <br />Subtotal <br />Grand Total <br />$17,392.55 <br />$51,977.10 <br />N:\Departments\Parks and Recreation\Administration\Projects\Orono Park and YAC Active Elk River\Changes orders (Updated 12-2-21) <br />
The URL can be used to link to this page
Your browser does not support the video tag.