My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.13 SR 12-06-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
12-06-2021
>
4.13 SR 12-06-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 1:30:30 PM
Creation date
12/2/2021 4:02:18 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISS IF <br />SRFNo. 13673 A <br />PROPOSAL REQUEST <br />a <br />Date: 07/29/2021 PR No.: 006 <br />Project: Orono Park To: Wyatt Gutzke <br />General Site Improvements New Look Contracting <br />18599 Gary Street 14045. Northdale Boulevard <br />Elk River, MN 55330`- Rogers, MN 55374 <br />Owner: City of Elk River From: Tim Wold <br />13065 Orono Parkway SRF Consulting Group, Inc. <br />Elk River, MN 55330 3701 Wayzata Boulevard, Suite 100 <br />Minneapolis, MN 55416-3791 <br />Please submit an itemized cost estimate for changes in the Contract Sum and Contract Time for <br />proposed modifications to Contract Documents. Submit your cost within five days, or notify <br />Architect of the date you anticipate submitting your proposal. <br />This is not a change order or a direction to proceed with the work described in the proposed <br />modifications. <br />Reason for Change: ® Owner Request ❑ Unforeseen Condition ❑ Code Interpretation Other <br />1. Add two additional 1" PVC conduits with a pull string for additional camera locations. One to <br />be located on the existing light pole on the north side of the play area. The second to be located <br />on the new covered shelter on the southeast corner column to capture the restroom doors. <br />Both conduits will be changed over to rigid conduit upon emergence at the light pole and corner <br />column locations. Both conduits will be run to the electrical room within the new restroom <br />building near the new incoming low -voltage conduit. <br />Labor $ 900.00 <br />Materials $ 2,040.00 <br />OH&P $ 294.00 _ <br />(Add) (Deduct) $_ 3,234.00 <br />(Circle One) <br />3701 WAYzATA BOULEVARD, SUITE 100 I MnvNEAPoLis, MN 55416 1 763.475.0010 1 VAMSUCONSULTING.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.