Laserfiche WebLink
HU.BBARD ELECTRIC, INC <br />Electrical Contractor <br />14166 Bank St. <br />Becker, MN 55308 <br />Phone:(763) 263-8334 <br />CONTRACT POTENTIAL/CHANGE ORDER #4 <br />Date: 7/12/2021 <br />Job # Orono Park Site Improvements <br />Contract For: Electrical <br />Owner/Contractor: City of Elk River / New Look Construction <br />The following changes from the contract plans and specifications are hereby requested: <br />Decrease in Increease in <br />Description of Change Contract Price Contract Price <br />Refeed / hookup (2) existing shelters by the playground. Power supplying <br />those shelters was previously fed from pedestals that got demo'd. Work to <br />include: Set (3) new ground box's, utilize the (2) existing pedestal feeder <br />conduit/feeder from existing service on the south side of the park to supply <br />the new power source for the (2) shelters and the new bathroom building as <br />discussed at the jobsite meeting. <br />Net Change in Contract Price: <br />Material: $2,071.17 <br />Labor: $2,450.00 <br />OH&P: $4-_X"3 <br />� T3 <br />The sum of S S j is hereby added to to the total contract price. <br />(added to or deducted from) <br />The time for completion is _the same _ _ _ _ 4 by zerodays. This document <br />will become a supplement to the contract and all provisions of the contract will apply here to. <br />HUBBARD ELECTRIC, INC. <br />