Laserfiche WebLink
Page 2 of 2 <br />Labor $ Z'! .5 <br />Materials $ <br />OH&P �' Z <br />(Add) (D w <br />(Circle One) <br />PR No. 005 <br />3. F i.a 1'1 h tall 2" PVC conduit for future electric vehicle charger to located at the south end <br />11 �V1�J sVe <br />ag lot. Conduit shall be directionally bored under Gary Street to utilizel ng source on the power pole as discussed with Elk River Municipal Utilities. <br />U V-" <br />Labor $ 2 t 7 4 <br />Materials $ Z <br />OH&P $ / *+rim <br />(Add) e t $ ?� <br />(Circle One) <br />TOTAL ADD/DEDUCT: $ <br />Does Proposed Change(s) involve a change in Contract Time? �No ❑ Yes <br />(Increased)(Decreased) _ days. <br />Attachments: None <br />Request By: Tim Wold, SRF <br />cc: Michael Hecker, City of Elk River <br />Tim Sevcik, City of Elk River <br />Branson Wisner, City of Elk River <br />H \Pnje is\ 13000\ 13673\Cnudmd1oa\0rono Park\Cowrael GGauges\Pmpnm/ Regj ws\PR #9 EkdMx 071421.d6m <br />