Laserfiche WebLink
Page 2 of 2 <br />3. Furnish and install T' conduit with sweeps for solar table per attached sketch plan. <br />Labor $— <br />Materials $ <br />OH&P <br />" po"W- $ $1,168.89 <br />(Circle One) <br />TOTAL ADD/DEDUCT: $ / • 11 <br />Does Proposed Change(s) involve a change in Contract Tune? ❑ No eYes <br />(Increased)(Decreased) —d days. <br />Attachments: Sheet E1.0 — Overall Lighting Plan <br />Sheet E1.1— South Park Lighting Enlargement Plan <br />Sheet E1.2 — North Park Lighting Enlargement Plan <br />Solar Table Conduit Plan (from City) <br />Solar Tabel Conduit Quote (from New Look) <br />Request By: Tim Wold, SRF <br />cc: Michael Hecker, City of Elk River <br />Tim Sevcik, City of Elk River <br />Branson Wisner, City of Elk River <br />PR No. 004 <br />H\A,j \13M1i673\G,-tniaw\Om-Park\CoxtmcrCh-V,\Prp-IRej",\PR#4_a#dniA&-06222i.d. <br />