My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.5 SR 11-15-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
11-15-2021
>
9.5 SR 11-15-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 1:28:55 PM
Creation date
11/12/2021 8:41:52 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/15/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan 2022 rhru 2026 <br />City of Elk River, Minnesota <br />Project # STM-1 <br />Project Name Storm Water Projects <br />Description <br />Department <br />Storm Water <br />Contact <br />Storm Water Coordinator <br />Type <br />Maintenance <br />Useful Life <br />Unassigned <br />Category <br />Utilities <br />3i-annual pond cleaning, stormwater repairs, BMP inventory. <br />?022 - Trott Brook <br />?025 - Elk Park Center basin and Zane Street basin <br />;Storm water infrastructure projects combined with street projects are included on the pavement management CIP sheet.) <br />Justification <br />these projects include the testing, removal, and disposal of sediment deposits from our stormwater ponds. This is needed to assure the storm water <br />system is functioning as designed and achieving the water quality standards of our NPDES permit. <br />the smaller stormwater repairs include minor pipe upsizing, culvert replacement, manhole and catch basin repairs and fixing of washout areas. <br />Expenditures <br />2022 2023 <br />2024 2025 2026 <br />Total <br />Construction/Maintenance <br />250,000 <br />250,000 <br />500,000 <br />Total <br />Funding Sources <br />250,000 <br />2022 2023 <br />250,000 <br />2024 2025 2026 <br />500,000 <br />Total <br />Storm Water <br />250,000 <br />250,000 <br />500,000 <br />Total <br />250,000 <br />250,000 <br />500,000 <br />2022-2026 CAPITAL IMPROVEMENT PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.