ventral Door
<br />08-8200
<br />8A
<br />Specialty Material
<br />$ 3,541.00
<br />$ -
<br />$ -
<br />$ 3,541.00
<br />$ 3,541.00
<br />$ 3,541.00
<br />100.00%
<br />$ -
<br />:entral Door
<br />08-8200
<br />8A
<br />WD Door Material
<br />$ 12,861.00
<br />$ -
<br />$ -
<br />$ 12,861.00
<br />$ 12,861.00
<br />$ 12,861.00
<br />100.00%
<br />$ -
<br />:entral Door
<br />08-8200
<br />8A
<br />CO#1
<br />$ -
<br />$ -
<br />$ 1,294.50
<br />$ 1,294.50
<br />$ 1,294.50
<br />$ 1,294.50
<br />100.00%
<br />$ -
<br />:entral Door
<br />08-8200
<br />8A
<br />CO#2 RFI#109
<br />$ -
<br />$ -
<br />$ 513.58
<br />$ 513.58
<br />$ 513.58
<br />$ 513.58
<br />100.00%
<br />$ -
<br />:entral Door
<br />08-8200
<br />8A
<br />CO#3 Shorten Door 177 - Use of Force Room
<br />$ -
<br />$ -
<br />$ 350.00
<br />$ 350.00
<br />$ -
<br />$ 350.00
<br />$ 350.00
<br />100.00%
<br />$ -
<br />:entral Door
<br />08-8200
<br />8A
<br />CO#4 PR#19 Doors & Hardware
<br />$ -
<br />$ -
<br />$ 3,538.39
<br />$ 3,538.39
<br />$ -
<br />$ 1,297.80
<br />$ 1,297.80
<br />36.68%
<br />$ 2,240.59
<br />ford Doors
<br />08-8361
<br />8B
<br />OH Doors -Material
<br />$ 50,475.00
<br />$ -
<br />$ -
<br />$ 50,475.00
<br />$ 50,475.00
<br />$ 50,475.00
<br />100.00%
<br />$ -
<br />ford Doors
<br />08-8361
<br />8B
<br />OH Doors -Labor
<br />$ 12,800.00
<br />$ -
<br />$ -
<br />$ 12,800.00
<br />$ 12,800.00
<br />$ 12,800.00
<br />100.00%
<br />$ -
<br />ford Doors
<br />08-8361
<br />8B
<br />High Speed Doors -Material
<br />$ 56,525.00
<br />$ -
<br />$ -
<br />$ 56,525.00
<br />$ 56,525.00
<br />$ 56,525.00
<br />100.00%
<br />$ -
<br />ford Doors
<br />08-8361
<br />8B
<br />High Speed Doors -Labor
<br />$ 5,000.00
<br />$ -
<br />$ -
<br />$ 5,000.00
<br />$ 5,000.00
<br />$ 5,000.00
<br />100.00%
<br />$ -
<br />ford Doors
<br />08-8361
<br />8B
<br />CO#1 High Speed Door VE Option #1
<br />$
<br />$ -
<br />$ (6,100.00)
<br />$ (6,100.00)
<br />$ (6,100.00)
<br />$ (6,100.00)
<br />100.00%
<br />$ -
<br />ford Doors
<br />08-8361
<br />8B
<br />CO#2 Powder Coat Colorfor High Speed Doors
<br />$ -
<br />$ -
<br />$ 2,310.00
<br />$ 2,310.00
<br />$ 2,310.00
<br />$ 2,310.00
<br />100.00%
<br />$
<br />ford Doom
<br />08-8361
<br />8B
<br />CO#3 Credit Ground Loop at 173A
<br />$ -
<br />$ -
<br />$ (150.70)
<br />$ (150.70)
<br />$ (150.70)
<br />$ (150.70)
<br />100.00%
<br />$
<br />ford Doom
<br />08-8361
<br />8B
<br />CO#4 Creditfor single phase OH Door Operator
<br />$ -
<br />$ -
<br />$ (1,992.00)
<br />$ (1,992.00)
<br />$ (1,992.00)
<br />$ (1,992.00)
<br />100.00%
<br />$ -
<br />ford Doors
<br />08-8361
<br />8B
<br />CO#5 RFI#140 Ext access control
<br />$ -
<br />$ -
<br />$ 1,047.00
<br />$ 1,047.00
<br />$ 1,047.00
<br />$ 1,047.00
<br />100.00%
<br />$ -
<br />Hand Glass
<br />08-8800
<br />8C
<br />Aluminum, Glass and Glazing-PD Material
<br />$ 7,462.00
<br />$ -
<br />$ -
<br />$ 7,462.00
<br />$ 7,462.00
<br />$ 7,462.00
<br />100.00%
<br />$ -
<br />tlandGlass
<br />08-8800
<br />8C
<br />Aluminum, Glass and Glazing-PD Labor/GC's
<br />$ 11,810.00
<br />$ -
<br />$ -
<br />$ 11,810.00
<br />$ 11,810.00
<br />$ 11,810.00
<br />100.00%
<br />$ -
<br />tlandGlass
<br />08-8800
<br />8C
<br />Aluminum, Glass and Glazing -Fire Material
<br />$ 31,920.00
<br />$ -
<br />$ -
<br />$ 31,920.00
<br />$ 31,920.00
<br />$ 31,920.00
<br />100.00%
<br />$ -
<br />tlandGlass
<br />08-8800
<br />8C
<br />Aluminum, Glass and Glazing -Fire Labor/GC's
<br />$ 16,742.00
<br />$ -
<br />$ -
<br />$ 16,742.00
<br />$ 14,398.00
<br />$ 14,398.00
<br />86.00%
<br />$ 2,344.00
<br />Hand Glass
<br />08-8800
<br />8C
<br />CO#1-PR#01
<br />$ -
<br />$ -
<br />$ 2,595.00
<br />$ 2,595.00
<br />$ 2,595.00
<br />$ 2,595.00
<br />100.00%
<br />$ -
<br />tland Glass
<br />08-8800
<br />8C
<br />CO#2 RFI#117
<br />$ -
<br />$ -
<br />$ 1,310.00
<br />$ 1,310.00
<br />$ 1,310.00
<br />$ 1,310.00
<br />100.00%
<br />$ -
<br />tland Glass
<br />08-8800
<br />8C
<br />CO#3 PR#19 F&I Sidelights & Display Case Doors & Hardware
<br />$ -
<br />$ -
<br />$ 3,855.00
<br />$ 3,855.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 3,855.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />Mobilization
<br />$ 5,000.00
<br />$ -
<br />$ -
<br />$ 5,000.00
<br />$ 5,000.00
<br />$ 5,000.00
<br />100.00%
<br />$ -
<br />tyDrywall
<br />09-9250
<br />9A
<br />Metal Framing
<br />Material
<br />$ 12,000.00
<br />$ -
<br />$ -
<br />$ 12,000.00
<br />$ 9,600.00
<br />$ 2,400.00
<br />$ 12,000.00
<br />100.00%
<br />$
<br />ty Drywall
<br />09-9250
<br />9A
<br />Drywall
<br />Material
<br />$ 20,000.00
<br />$ -
<br />$ -
<br />$ 20,000.00
<br />$ 16,000.00
<br />$ 4,000.00
<br />$ 20,000.00
<br />100.00%
<br />$
<br />ty Drywall
<br />09-9250
<br />9A
<br />Taping
<br />Material
<br />$ 4,000.00
<br />$ -
<br />$ -
<br />$ 4,000.00
<br />$ 3,200.00
<br />$ 800.00
<br />$ 4,000.00
<br />100.00%
<br />$
<br />ty Drywall
<br />09-9250
<br />9A
<br />EIFS
<br />Material
<br />$ 8,000.00
<br />$ -
<br />$ -
<br />$ 8,000.00
<br />$ 8,000.00
<br />$ 8,000.00
<br />100.00%
<br />$
<br />ty Drywall
<br />09-9250
<br />9A
<br />Metal Framing
<br />Labor
<br />$ 45,000.00
<br />$ -
<br />$ -
<br />$ 45,000.00
<br />$ 36,000.00
<br />$ 9,000.00
<br />$ 45,000.00
<br />100.00%
<br />$
<br />ty Drywall
<br />09-9250
<br />9A
<br />Drywall
<br />Labor
<br />$ 60,000.00
<br />$ -
<br />$ -
<br />$ 60,000.00
<br />$ 48,000.00
<br />$ 12,000.00
<br />$ 60,000.00
<br />100.00%
<br />$
<br />ty Drywall
<br />09-9250
<br />9A
<br />Taping
<br />Labor
<br />$ 20,000.00
<br />$ -
<br />$ -
<br />$ 20,000.00
<br />$ 16,000.00
<br />$ 4,000.00
<br />$ 20,000.00
<br />100.00%
<br />$
<br />ty Drywall
<br />09-9250
<br />9A
<br />EIFS
<br />Labor
<br />$ 15,000.00
<br />$ -
<br />$ -
<br />$ 15,000.00
<br />$ 15,000.00
<br />$ 15,000.00
<br />100.00%
<br />$
<br />ty Drywall
<br />09-9250
<br />9A
<br />Allowance
<br />$ 7,000.00
<br />$ -
<br />$ -
<br />$ 7,000.00
<br />$ 6,100.00
<br />$ 6,100.00
<br />87.14%
<br />$ 900.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#1 Remove Air Barrier at EIFSfrom Scope
<br />$ -
<br />$ -
<br />$ 2,533.30
<br />$ 2,533.30
<br />$ 2,533.30
<br />$ 2,533.30
<br />100.00%
<br />$ -
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#2 Demo and Patch RI PD Upper Level
<br />$ -
<br />$ -
<br />$ 2,775.00
<br />$ 2,775.00
<br />$ 2,775.00
<br />$ 2,775.00
<br />100.00%
<br />$ -
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#3 RFI#36
<br />$ -
<br />$ -
<br />$ 1,637.00
<br />$ 1,637.00
<br />$ 1,637.00
<br />$ 1,637.00
<br />100.00%
<br />$ -
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#4 PR#17
<br />$ -
<br />$ -
<br />$ 3,959.00
<br />$ 3,959.00
<br />$ 3,959.00
<br />$ 3,959.00
<br />100.00%
<br />$
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#S Allowance usage (remaining $3395)
<br />$
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />#DIV/01
<br />$
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#6 Allowance usage (remaining $1855)
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />#DIV/01
<br />$ -
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#7 RFI#132
<br />$ -
<br />$ -
<br />$ 2,221.00
<br />$ 2,221.00
<br />$ 2,221.00
<br />$ 2,221.00
<br />100.00%
<br />$ -
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#8 RFI#108
<br />$ -
<br />$ -
<br />$ 650.00
<br />$ 650.00
<br />$ 650.00
<br />$ 650.00
<br />100.00%
<br />$
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#9 Allowance Usage (remaining $900)
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />#DIV/01
<br />$ -
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#10 Refinish EOC Walls
<br />$ -
<br />$ -
<br />$ 4,750.00
<br />$ 4,750.00
<br />$ 4,750.00
<br />$ 4,750.00
<br />100.00%
<br />$
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#11 PR#27 Wall Changes
<br />$ -
<br />$ -
<br />$ 1,700.00
<br />$ 1,700.00
<br />$ -
<br />$ 1,700.00
<br />$ 1,700.00
<br />100.00%
<br />$ -
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#12 RFI#162 Fur out Kitchen 117
<br />$ -
<br />$ -
<br />$ 1,300.00
<br />$ 1,300.00
<br />$ -
<br />$ 1,300.00
<br />$ 1,300.00
<br />100.00%
<br />$ -
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#13 RFI#172 F&I DoorJamb Flashing at Door 101BX
<br />$ -
<br />$ -
<br />$ 290.00
<br />$ 290.00
<br />$ -
<br />$ 290.00
<br />$ 290.00
<br />100.00%
<br />$ -
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#14 PR#19 F&I Gyp Partitions and Patching
<br />$
<br />$ -
<br />$ 12,598.00
<br />$ 12,598.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 12,598.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#15 RFI#176 Add Frame and Finish Top of CMU Wall to Deck
<br />$ -
<br />$ -
<br />$ 3,235.00
<br />$ 3,235.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 3,235.00
<br />ty Drywall
<br />09-9250
<br />9A
<br />CO#16 RFI#192 Creditto eliminate gyp lid in Dispatch 103
<br />$ -
<br />$ -
<br />$ (450.00)
<br />$ (450.00)
<br />$ -
<br />$ -
<br />0.00%
<br />$ (450.00)
<br />itate Tile
<br />09-9300
<br />9B
<br />Tile Labor
<br />$ 19,311.00
<br />$ -
<br />$ -
<br />$ 19,311.00
<br />$ -
<br />$ 19,311.00
<br />$ 19,311.00
<br />100.00%
<br />$ -
<br />itateTile
<br />09-9300
<br />9B
<br />Tile Materials
<br />$ 17,693.00
<br />$ -
<br />$ -
<br />$ 17,693.00
<br />$ 17,693.00
<br />$ 17,693.00
<br />100.00%
<br />$ -
<br />itateTile
<br />09-9300
<br />9B
<br />Bond
<br />$ 800.00
<br />$ -
<br />$ -
<br />$ 800.00
<br />$ 800.00
<br />$ 800.00
<br />100.00%
<br />$ -
<br />itateTile
<br />09-9300
<br />9B
<br />Area B- Upper(212, 220, 221)
<br />Labor
<br />$ 8,307.00
<br />$ -
<br />$ -
<br />$ 8,307.00
<br />$ 6,400.00
<br />$ 1,907.00
<br />$ 8,307.00
<br />100.00%
<br />$ -
<br />itateTile
<br />09-9300
<br />9B
<br />Area B- Lower (150)
<br />Material
<br />$ 300.00
<br />$ -
<br />$ -
<br />$ 300.00
<br />$ -
<br />$ 300.00
<br />$ 300.00
<br />100.00%
<br />$ -
<br />itateTile
<br />09-9300
<br />9B
<br />CO#1 ASI 2R TL 8-11 Change
<br />$ -
<br />$ -
<br />$ 7,472.00
<br />$ 7,472.00
<br />$ -
<br />$ 7,472.00
<br />$ 7,472.00
<br />100.00%
<br />$ -
<br />itateTile
<br />09-9300
<br />9B
<br />CO#2 Wall Tile Repair(B/C Klein)
<br />$ -
<br />$ -
<br />$ 150.00
<br />$ 150.00
<br />$ -
<br />$ 150.00
<br />$ 150.00
<br />100.00%
<br />$ -
<br />itateTile
<br />09-9300
<br />9B
<br />CO#3 Tile in Duty Bay 176
<br />$ -
<br />$ -
<br />$ 495.00
<br />$ 495.00
<br />$ -
<br />$ 495.00
<br />$ 495.00
<br />100.00%
<br />$ -
<br />itateTile
<br />09-9300
<br />9B
<br />CO#4 Install Tile Base at PD 1st Floor Reno
<br />$ -
<br />$ -
<br />$ 496.00
<br />$ 496.00
<br />$ -
<br />$ 496.00
<br />$ 496.00
<br />100.00%
<br />$ -
<br />City Acoustics
<br />09-9510
<br />9C
<br />ACT-PoliceM
<br />$ 19,700.00
<br />$ -
<br />$ -
<br />$ 19,700.00
<br />$ 19,700.00
<br />$ 19,700.00
<br />100.00%
<br />$
<br />City Acoustics
<br />09-9510
<br />9C
<br />ACT-PoliceL
<br />$ 9,000.00
<br />$ -
<br />$ -
<br />$ 9,000.00
<br />$ 9,000.00
<br />$ 9,000.00
<br />100.00%
<br />$
<br />City Acoustics
<br />09-9510
<br />9C
<br />ACT-FireM
<br />$ 3,600.00
<br />$ -
<br />$ -
<br />$ 3,600.00
<br />$ -
<br />$ 3,600.00
<br />$ 3,600.00
<br />100.00%
<br />$
<br />City Acoustics
<br />09-9510
<br />9C
<br />ACT-FireL
<br />$ 2,400.00
<br />$ -
<br />$ -
<br />$ 2,400.00
<br />$ -
<br />$ 2,400.00
<br />$ 2,400.00
<br />100.00%
<br />$
<br />City Acoustics
<br />09-9510
<br />9C
<br />CO#1 Change ACT-1&2
<br />$ -
<br />$ -
<br />$ 6,829.00
<br />$ 6,829.00
<br />$ 6,829.00
<br />$ 6,829.00
<br />100.00%
<br />$
<br />City Acoustics
<br />09-9510
<br />9C
<br />CO#2 ACT in Duty Bags 176
<br />$
<br />$ -
<br />$ 389.09
<br />$ 389.09
<br />$ -
<br />$ 389.09
<br />$ 389.09
<br />100.00%
<br />$
<br />City Acoustics
<br />09-9510
<br />9C
<br />CO#3 T&M Ceiling Patch at PD 1st Floor
<br />$ -
<br />$ -
<br />$ 952.81
<br />$ 952.81
<br />$ -
<br />$ 952.81
<br />$ 952.81
<br />100.00%
<br />$
<br />City Acoustics
<br />09-9510
<br />9C
<br />CO#4 Patch EOC Ceiling
<br />$ -
<br />$ -
<br />$ 2,001.74
<br />$ 2,001.74
<br />$ -
<br />$ 2,001.74
<br />$ 2,001.74
<br />100.00%
<br />$ -
<br />$ 177.05
<br />$ 643.05
<br />$ 64.73
<br />$ 25.68
<br />$ 17.50
<br />$ 64.89
<br />$ 2,523.75
<br />$ 640.00
<br />$ 2,826.25
<br />$ 250.00
<br />$ (305.00
<br />$ 115.50
<br />$ (7.54
<br />$ (99.60
<br />$ 52.35
<br />$ 373.10
<br />$ 590.50
<br />$ 1,596.00
<br />$ 719.90
<br />$ 129.75
<br />$ 65.50
<br />S -
<br />250.00
<br />600.00
<br />1,000.00
<br />200.00
<br />400.00
<br />2,250.00
<br />3,000.00
<br />1,000.00
<br />750.00
<br />305.00
<br />126.67
<br />138.75
<br />81.85
<br />197.95
<br />237.50
<br />85.00
<br />65.00
<br />14.50
<br />$ 965.55
<br />$ 884.65
<br />$ 40.00
<br />$ 415.35
<br />$ 15.00
<br />$ 373.60
<br />$ 7.50
<br />$ 24.75
<br />$ 24.80
<br />$ 985.00
<br />$ 450.00
<br />$ 180.00
<br />$ 120.00
<br />$ 341.45
<br />$ 19.45
<br />$ 47.64
<br />$ 100.09