Laserfiche WebLink
ventral Door <br />08-8200 <br />8A <br />Specialty Material <br />$ 3,541.00 <br />$ - <br />$ - <br />$ 3,541.00 <br />$ 3,541.00 <br />$ 3,541.00 <br />100.00% <br />$ - <br />:entral Door <br />08-8200 <br />8A <br />WD Door Material <br />$ 12,861.00 <br />$ - <br />$ - <br />$ 12,861.00 <br />$ 12,861.00 <br />$ 12,861.00 <br />100.00% <br />$ - <br />:entral Door <br />08-8200 <br />8A <br />CO#1 <br />$ - <br />$ - <br />$ 1,294.50 <br />$ 1,294.50 <br />$ 1,294.50 <br />$ 1,294.50 <br />100.00% <br />$ - <br />:entral Door <br />08-8200 <br />8A <br />CO#2 RFI#109 <br />$ - <br />$ - <br />$ 513.58 <br />$ 513.58 <br />$ 513.58 <br />$ 513.58 <br />100.00% <br />$ - <br />:entral Door <br />08-8200 <br />8A <br />CO#3 Shorten Door 177 - Use of Force Room <br />$ - <br />$ - <br />$ 350.00 <br />$ 350.00 <br />$ - <br />$ 350.00 <br />$ 350.00 <br />100.00% <br />$ - <br />:entral Door <br />08-8200 <br />8A <br />CO#4 PR#19 Doors & Hardware <br />$ - <br />$ - <br />$ 3,538.39 <br />$ 3,538.39 <br />$ - <br />$ 1,297.80 <br />$ 1,297.80 <br />36.68% <br />$ 2,240.59 <br />ford Doors <br />08-8361 <br />8B <br />OH Doors -Material <br />$ 50,475.00 <br />$ - <br />$ - <br />$ 50,475.00 <br />$ 50,475.00 <br />$ 50,475.00 <br />100.00% <br />$ - <br />ford Doors <br />08-8361 <br />8B <br />OH Doors -Labor <br />$ 12,800.00 <br />$ - <br />$ - <br />$ 12,800.00 <br />$ 12,800.00 <br />$ 12,800.00 <br />100.00% <br />$ - <br />ford Doors <br />08-8361 <br />8B <br />High Speed Doors -Material <br />$ 56,525.00 <br />$ - <br />$ - <br />$ 56,525.00 <br />$ 56,525.00 <br />$ 56,525.00 <br />100.00% <br />$ - <br />ford Doors <br />08-8361 <br />8B <br />High Speed Doors -Labor <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />100.00% <br />$ - <br />ford Doors <br />08-8361 <br />8B <br />CO#1 High Speed Door VE Option #1 <br />$ <br />$ - <br />$ (6,100.00) <br />$ (6,100.00) <br />$ (6,100.00) <br />$ (6,100.00) <br />100.00% <br />$ - <br />ford Doors <br />08-8361 <br />8B <br />CO#2 Powder Coat Colorfor High Speed Doors <br />$ - <br />$ - <br />$ 2,310.00 <br />$ 2,310.00 <br />$ 2,310.00 <br />$ 2,310.00 <br />100.00% <br />$ <br />ford Doom <br />08-8361 <br />8B <br />CO#3 Credit Ground Loop at 173A <br />$ - <br />$ - <br />$ (150.70) <br />$ (150.70) <br />$ (150.70) <br />$ (150.70) <br />100.00% <br />$ <br />ford Doom <br />08-8361 <br />8B <br />CO#4 Creditfor single phase OH Door Operator <br />$ - <br />$ - <br />$ (1,992.00) <br />$ (1,992.00) <br />$ (1,992.00) <br />$ (1,992.00) <br />100.00% <br />$ - <br />ford Doors <br />08-8361 <br />8B <br />CO#5 RFI#140 Ext access control <br />$ - <br />$ - <br />$ 1,047.00 <br />$ 1,047.00 <br />$ 1,047.00 <br />$ 1,047.00 <br />100.00% <br />$ - <br />Hand Glass <br />08-8800 <br />8C <br />Aluminum, Glass and Glazing-PD Material <br />$ 7,462.00 <br />$ - <br />$ - <br />$ 7,462.00 <br />$ 7,462.00 <br />$ 7,462.00 <br />100.00% <br />$ - <br />tlandGlass <br />08-8800 <br />8C <br />Aluminum, Glass and Glazing-PD Labor/GC's <br />$ 11,810.00 <br />$ - <br />$ - <br />$ 11,810.00 <br />$ 11,810.00 <br />$ 11,810.00 <br />100.00% <br />$ - <br />tlandGlass <br />08-8800 <br />8C <br />Aluminum, Glass and Glazing -Fire Material <br />$ 31,920.00 <br />$ - <br />$ - <br />$ 31,920.00 <br />$ 31,920.00 <br />$ 31,920.00 <br />100.00% <br />$ - <br />tlandGlass <br />08-8800 <br />8C <br />Aluminum, Glass and Glazing -Fire Labor/GC's <br />$ 16,742.00 <br />$ - <br />$ - <br />$ 16,742.00 <br />$ 14,398.00 <br />$ 14,398.00 <br />86.00% <br />$ 2,344.00 <br />Hand Glass <br />08-8800 <br />8C <br />CO#1-PR#01 <br />$ - <br />$ - <br />$ 2,595.00 <br />$ 2,595.00 <br />$ 2,595.00 <br />$ 2,595.00 <br />100.00% <br />$ - <br />tland Glass <br />08-8800 <br />8C <br />CO#2 RFI#117 <br />$ - <br />$ - <br />$ 1,310.00 <br />$ 1,310.00 <br />$ 1,310.00 <br />$ 1,310.00 <br />100.00% <br />$ - <br />tland Glass <br />08-8800 <br />8C <br />CO#3 PR#19 F&I Sidelights & Display Case Doors & Hardware <br />$ - <br />$ - <br />$ 3,855.00 <br />$ 3,855.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,855.00 <br />ty Drywall <br />09-9250 <br />9A <br />Mobilization <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />100.00% <br />$ - <br />tyDrywall <br />09-9250 <br />9A <br />Metal Framing <br />Material <br />$ 12,000.00 <br />$ - <br />$ - <br />$ 12,000.00 <br />$ 9,600.00 <br />$ 2,400.00 <br />$ 12,000.00 <br />100.00% <br />$ <br />ty Drywall <br />09-9250 <br />9A <br />Drywall <br />Material <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ 16,000.00 <br />$ 4,000.00 <br />$ 20,000.00 <br />100.00% <br />$ <br />ty Drywall <br />09-9250 <br />9A <br />Taping <br />Material <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ 3,200.00 <br />$ 800.00 <br />$ 4,000.00 <br />100.00% <br />$ <br />ty Drywall <br />09-9250 <br />9A <br />EIFS <br />Material <br />$ 8,000.00 <br />$ - <br />$ - <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />100.00% <br />$ <br />ty Drywall <br />09-9250 <br />9A <br />Metal Framing <br />Labor <br />$ 45,000.00 <br />$ - <br />$ - <br />$ 45,000.00 <br />$ 36,000.00 <br />$ 9,000.00 <br />$ 45,000.00 <br />100.00% <br />$ <br />ty Drywall <br />09-9250 <br />9A <br />Drywall <br />Labor <br />$ 60,000.00 <br />$ - <br />$ - <br />$ 60,000.00 <br />$ 48,000.00 <br />$ 12,000.00 <br />$ 60,000.00 <br />100.00% <br />$ <br />ty Drywall <br />09-9250 <br />9A <br />Taping <br />Labor <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ 16,000.00 <br />$ 4,000.00 <br />$ 20,000.00 <br />100.00% <br />$ <br />ty Drywall <br />09-9250 <br />9A <br />EIFS <br />Labor <br />$ 15,000.00 <br />$ - <br />$ - <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />100.00% <br />$ <br />ty Drywall <br />09-9250 <br />9A <br />Allowance <br />$ 7,000.00 <br />$ - <br />$ - <br />$ 7,000.00 <br />$ 6,100.00 <br />$ 6,100.00 <br />87.14% <br />$ 900.00 <br />ty Drywall <br />09-9250 <br />9A <br />CO#1 Remove Air Barrier at EIFSfrom Scope <br />$ - <br />$ - <br />$ 2,533.30 <br />$ 2,533.30 <br />$ 2,533.30 <br />$ 2,533.30 <br />100.00% <br />$ - <br />ty Drywall <br />09-9250 <br />9A <br />CO#2 Demo and Patch RI PD Upper Level <br />$ - <br />$ - <br />$ 2,775.00 <br />$ 2,775.00 <br />$ 2,775.00 <br />$ 2,775.00 <br />100.00% <br />$ - <br />ty Drywall <br />09-9250 <br />9A <br />CO#3 RFI#36 <br />$ - <br />$ - <br />$ 1,637.00 <br />$ 1,637.00 <br />$ 1,637.00 <br />$ 1,637.00 <br />100.00% <br />$ - <br />ty Drywall <br />09-9250 <br />9A <br />CO#4 PR#17 <br />$ - <br />$ - <br />$ 3,959.00 <br />$ 3,959.00 <br />$ 3,959.00 <br />$ 3,959.00 <br />100.00% <br />$ <br />ty Drywall <br />09-9250 <br />9A <br />CO#S Allowance usage (remaining $3395) <br />$ <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ <br />ty Drywall <br />09-9250 <br />9A <br />CO#6 Allowance usage (remaining $1855) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />ty Drywall <br />09-9250 <br />9A <br />CO#7 RFI#132 <br />$ - <br />$ - <br />$ 2,221.00 <br />$ 2,221.00 <br />$ 2,221.00 <br />$ 2,221.00 <br />100.00% <br />$ - <br />ty Drywall <br />09-9250 <br />9A <br />CO#8 RFI#108 <br />$ - <br />$ - <br />$ 650.00 <br />$ 650.00 <br />$ 650.00 <br />$ 650.00 <br />100.00% <br />$ <br />ty Drywall <br />09-9250 <br />9A <br />CO#9 Allowance Usage (remaining $900) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />ty Drywall <br />09-9250 <br />9A <br />CO#10 Refinish EOC Walls <br />$ - <br />$ - <br />$ 4,750.00 <br />$ 4,750.00 <br />$ 4,750.00 <br />$ 4,750.00 <br />100.00% <br />$ <br />ty Drywall <br />09-9250 <br />9A <br />CO#11 PR#27 Wall Changes <br />$ - <br />$ - <br />$ 1,700.00 <br />$ 1,700.00 <br />$ - <br />$ 1,700.00 <br />$ 1,700.00 <br />100.00% <br />$ - <br />ty Drywall <br />09-9250 <br />9A <br />CO#12 RFI#162 Fur out Kitchen 117 <br />$ - <br />$ - <br />$ 1,300.00 <br />$ 1,300.00 <br />$ - <br />$ 1,300.00 <br />$ 1,300.00 <br />100.00% <br />$ - <br />ty Drywall <br />09-9250 <br />9A <br />CO#13 RFI#172 F&I DoorJamb Flashing at Door 101BX <br />$ - <br />$ - <br />$ 290.00 <br />$ 290.00 <br />$ - <br />$ 290.00 <br />$ 290.00 <br />100.00% <br />$ - <br />ty Drywall <br />09-9250 <br />9A <br />CO#14 PR#19 F&I Gyp Partitions and Patching <br />$ <br />$ - <br />$ 12,598.00 <br />$ 12,598.00 <br />$ - <br />$ - <br />0.00% <br />$ 12,598.00 <br />ty Drywall <br />09-9250 <br />9A <br />CO#15 RFI#176 Add Frame and Finish Top of CMU Wall to Deck <br />$ - <br />$ - <br />$ 3,235.00 <br />$ 3,235.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,235.00 <br />ty Drywall <br />09-9250 <br />9A <br />CO#16 RFI#192 Creditto eliminate gyp lid in Dispatch 103 <br />$ - <br />$ - <br />$ (450.00) <br />$ (450.00) <br />$ - <br />$ - <br />0.00% <br />$ (450.00) <br />itate Tile <br />09-9300 <br />9B <br />Tile Labor <br />$ 19,311.00 <br />$ - <br />$ - <br />$ 19,311.00 <br />$ - <br />$ 19,311.00 <br />$ 19,311.00 <br />100.00% <br />$ - <br />itateTile <br />09-9300 <br />9B <br />Tile Materials <br />$ 17,693.00 <br />$ - <br />$ - <br />$ 17,693.00 <br />$ 17,693.00 <br />$ 17,693.00 <br />100.00% <br />$ - <br />itateTile <br />09-9300 <br />9B <br />Bond <br />$ 800.00 <br />$ - <br />$ - <br />$ 800.00 <br />$ 800.00 <br />$ 800.00 <br />100.00% <br />$ - <br />itateTile <br />09-9300 <br />9B <br />Area B- Upper(212, 220, 221) <br />Labor <br />$ 8,307.00 <br />$ - <br />$ - <br />$ 8,307.00 <br />$ 6,400.00 <br />$ 1,907.00 <br />$ 8,307.00 <br />100.00% <br />$ - <br />itateTile <br />09-9300 <br />9B <br />Area B- Lower (150) <br />Material <br />$ 300.00 <br />$ - <br />$ - <br />$ 300.00 <br />$ - <br />$ 300.00 <br />$ 300.00 <br />100.00% <br />$ - <br />itateTile <br />09-9300 <br />9B <br />CO#1 ASI 2R TL 8-11 Change <br />$ - <br />$ - <br />$ 7,472.00 <br />$ 7,472.00 <br />$ - <br />$ 7,472.00 <br />$ 7,472.00 <br />100.00% <br />$ - <br />itateTile <br />09-9300 <br />9B <br />CO#2 Wall Tile Repair(B/C Klein) <br />$ - <br />$ - <br />$ 150.00 <br />$ 150.00 <br />$ - <br />$ 150.00 <br />$ 150.00 <br />100.00% <br />$ - <br />itateTile <br />09-9300 <br />9B <br />CO#3 Tile in Duty Bay 176 <br />$ - <br />$ - <br />$ 495.00 <br />$ 495.00 <br />$ - <br />$ 495.00 <br />$ 495.00 <br />100.00% <br />$ - <br />itateTile <br />09-9300 <br />9B <br />CO#4 Install Tile Base at PD 1st Floor Reno <br />$ - <br />$ - <br />$ 496.00 <br />$ 496.00 <br />$ - <br />$ 496.00 <br />$ 496.00 <br />100.00% <br />$ - <br />City Acoustics <br />09-9510 <br />9C <br />ACT-PoliceM <br />$ 19,700.00 <br />$ - <br />$ - <br />$ 19,700.00 <br />$ 19,700.00 <br />$ 19,700.00 <br />100.00% <br />$ <br />City Acoustics <br />09-9510 <br />9C <br />ACT-PoliceL <br />$ 9,000.00 <br />$ - <br />$ - <br />$ 9,000.00 <br />$ 9,000.00 <br />$ 9,000.00 <br />100.00% <br />$ <br />City Acoustics <br />09-9510 <br />9C <br />ACT-FireM <br />$ 3,600.00 <br />$ - <br />$ - <br />$ 3,600.00 <br />$ - <br />$ 3,600.00 <br />$ 3,600.00 <br />100.00% <br />$ <br />City Acoustics <br />09-9510 <br />9C <br />ACT-FireL <br />$ 2,400.00 <br />$ - <br />$ - <br />$ 2,400.00 <br />$ - <br />$ 2,400.00 <br />$ 2,400.00 <br />100.00% <br />$ <br />City Acoustics <br />09-9510 <br />9C <br />CO#1 Change ACT-1&2 <br />$ - <br />$ - <br />$ 6,829.00 <br />$ 6,829.00 <br />$ 6,829.00 <br />$ 6,829.00 <br />100.00% <br />$ <br />City Acoustics <br />09-9510 <br />9C <br />CO#2 ACT in Duty Bags 176 <br />$ <br />$ - <br />$ 389.09 <br />$ 389.09 <br />$ - <br />$ 389.09 <br />$ 389.09 <br />100.00% <br />$ <br />City Acoustics <br />09-9510 <br />9C <br />CO#3 T&M Ceiling Patch at PD 1st Floor <br />$ - <br />$ - <br />$ 952.81 <br />$ 952.81 <br />$ - <br />$ 952.81 <br />$ 952.81 <br />100.00% <br />$ <br />City Acoustics <br />09-9510 <br />9C <br />CO#4 Patch EOC Ceiling <br />$ - <br />$ - <br />$ 2,001.74 <br />$ 2,001.74 <br />$ - <br />$ 2,001.74 <br />$ 2,001.74 <br />100.00% <br />$ - <br />$ 177.05 <br />$ 643.05 <br />$ 64.73 <br />$ 25.68 <br />$ 17.50 <br />$ 64.89 <br />$ 2,523.75 <br />$ 640.00 <br />$ 2,826.25 <br />$ 250.00 <br />$ (305.00 <br />$ 115.50 <br />$ (7.54 <br />$ (99.60 <br />$ 52.35 <br />$ 373.10 <br />$ 590.50 <br />$ 1,596.00 <br />$ 719.90 <br />$ 129.75 <br />$ 65.50 <br />S - <br />250.00 <br />600.00 <br />1,000.00 <br />200.00 <br />400.00 <br />2,250.00 <br />3,000.00 <br />1,000.00 <br />750.00 <br />305.00 <br />126.67 <br />138.75 <br />81.85 <br />197.95 <br />237.50 <br />85.00 <br />65.00 <br />14.50 <br />$ 965.55 <br />$ 884.65 <br />$ 40.00 <br />$ 415.35 <br />$ 15.00 <br />$ 373.60 <br />$ 7.50 <br />$ 24.75 <br />$ 24.80 <br />$ 985.00 <br />$ 450.00 <br />$ 180.00 <br />$ 120.00 <br />$ 341.45 <br />$ 19.45 <br />$ 47.64 <br />$ 100.09 <br />