Laserfiche WebLink
Treatments <br />Treatments <br />Structural Fab <br />Structural Fab <br />Structural Fab <br />Structural Fab <br />Structural Fab <br />Structural Fab <br />Structural Fab <br />Structural Fab <br />Structural Fab <br />Structural Fab <br />Structural Fab <br />Structural Fab <br />Structural Fab <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />t Erectors <br />03-3300 <br />32D <br />C0#11Add pourfor PDcard reader <br />$ - <br />$ - <br />$ 1,245.32 <br />$ 1,245.32 <br />$ 1,245.32 <br />$ 1,245.32 <br />100.00% <br />$ - <br />03-3300 <br />32D <br />CO#12 RFI#116Add Altfor Fence Pier <br />$ - <br />$ - <br />$ (2,816.65) <br />$ (2,816.65) <br />$ (2,816.65) <br />$ (2,816.65) <br />100.00% <br />$ - <br />03-3400 <br />3B <br />Precast- Police Squad <br />$ 260,826.00 <br />$ - <br />$ - <br />$ 260,826.00 <br />$ 260,826.00 <br />$ 260,826.00 <br />100.00% <br />$ - <br />03-3400 <br />3B <br />Precast- Fire Dept <br />$ 17,700.00 <br />$ - <br />$ - <br />$ 17,700.00 <br />$ 17,700.00 <br />$ 17,700.00 <br />100.00% <br />$ - <br />03-3350 <br />3C <br />Polished Concrete <br />$ 12,360.00 <br />$ - <br />$ - <br />$ 12,360.00 <br />$ - <br />$ - <br />0.00% <br />$ 12,360.00 <br />03-3350 <br />3C <br />CO#1 Add to Polish Concrete in Locker Room 120 <br />$ - <br />$ - <br />$ 676.00 <br />$ 676.00 <br />$ - <br />$ - <br />0.00% <br />$ 676.00 <br />04-4200 <br />4A <br />FD- Addition/Remodel 034500 L <br />Labor <br />$ 3,000.00 <br />$ - <br />$ - <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />100.00% <br />$ - <br />04-4200 <br />4A <br />FD- Addition/Remodel 034500 M <br />Material <br />$ 4,020.00 <br />$ - <br />$ - <br />$ 4,020.00 <br />$ 4,020.00 <br />$ 4,020.00 <br />100.00% <br />$ - <br />04-4200 <br />4A <br />FD- Addition/Remodel 042000 L <br />Labor <br />$ 179,900.00 <br />$ - <br />$ - <br />$ 179,900.00 <br />$ 162,000.00 <br />$ 17,900.00 <br />$ 179,900.00 <br />100.00% <br />$ - <br />04-4200 <br />4A <br />FD- Addition/Remodel 042000 M <br />Material <br />$ 107,800.00 <br />$ - <br />$ - <br />$ 107,800.00 <br />$ 96,800.00 <br />$ 11,000.00 <br />$ 107,800.00 <br />100.00% <br />$ - <br />04-4200 <br />4A <br />PD- Addition/Remodel 034500 L <br />Labor <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />04-4200 <br />4A <br />PD- Addition/Remodel 034500 M <br />Material <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />04-4200 <br />4A <br />PD- Addition/Remodel 042000 L <br />Labor <br />$ 41,000.00 <br />$ - <br />$ - <br />$ 41,000.00 <br />$ 41,000.00 <br />$ 41,000.00 <br />100.00% <br />$ - <br />04-4200 <br />4A <br />PD- Addition/Remodel 042000M <br />Material <br />$ 35,180.00 <br />$ - <br />$ - <br />$ 35,180.00 <br />$ 35,180.00 <br />$ 35,180.00 <br />100.00% <br />$ - <br />04-4200 <br />4A <br />CO#1 RFI#21 <br />$ - <br />$ - <br />$ 371.00 <br />$ 371.00 <br />$ 371.00 <br />$ 371.00 <br />100.00% <br />$ - <br />04-4200 <br />4A <br />CO#2 RFI#41 <br />$ - <br />$ - <br />$ 2,320.00 <br />$ 2,320.00 <br />$ 2,320.00 <br />$ 2,320.00 <br />100.00% <br />$ - <br />04-4200 <br />4A <br />CO#4 Backcharge Joist Pockets <br />$ - <br />$ - <br />$ (482.76) <br />$ (482.76) <br />$ (482.76) <br />$ (482.76) <br />100.00% <br />$ - <br />04-4200 <br />4A <br />CO#3 PR#1R <br />$ - <br />$ - <br />$ 5,876.00 <br />$ 5,876.00 <br />$ 5,876.00 <br />$ 5,876.00 <br />100.00% <br />$ - <br />04-4200 <br />4A <br />CO#5 RFI#36 <br />$ - <br />$ - <br />$ 1,761.00 <br />$ 1,761.00 <br />$ 1,761.00 <br />$ 1,761.00 <br />100.00% <br />$ - <br />04-4200 <br />4A <br />CO#6 RFI#93 <br />$ - <br />$ - <br />$ (1,040.00) <br />$ (1,040.00) <br />$ (1,040.00) <br />$ (1,040.00) <br />100.00% <br />$ - <br />04-4200 <br />4A <br />CO#7 RFI#78 Eliminate 4" Patch Work <br />$ - <br />$ - <br />$ (491.00) <br />$ (491.00) <br />$ (491.00) <br />$ (491.00) <br />100.00% <br />$ - <br />04-4200 <br />4A <br />CO#8 T&M Cut Bolts <br />$ - <br />$ - <br />$ 691.00 <br />$ 691.00 <br />$ 691.00 <br />$ 691.00 <br />100.00% <br />$ - <br />04-4200 <br />4A <br />CO#9 RFI#108 <br />$ <br />$ - <br />$ 735.00 <br />$ 735.00 <br />$ - <br />$ - <br />0.00% <br />$ 735.00 <br />04-4200 <br />4A <br />CO#10 RFI#130 <br />$ - <br />$ - <br />$ 7,186.00 <br />$ 7,186.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,186.00 <br />04-4200 <br />4A <br />CO#11 Credit CMU above Joist <br />$ - <br />$ - <br />$ (3,235.00) <br />$ (3,235.00) <br />$ - <br />$ - <br />0.00% <br />$ (3,235.00) <br />05-5120 <br />5A <br />Steel Supplier -Structural Steel <br />$ 51,161.88 <br />$ - <br />$ - <br />$ 51,161.88 <br />$ 51,161.88 <br />$ 51,161.88 <br />100.00% <br />$ - <br />05-5120 <br />5A <br />Steel Supplier -Joist <br />$ 53,937.50 <br />$ - <br />$ - <br />$ 53,937.50 <br />$ 53,937.50 <br />$ 53,937.50 <br />100.00% <br />$ - <br />05-5120 <br />5A <br />Steel Supplier -Deck <br />$ 23,732.50 <br />$ - <br />$ - <br />$ 23,732.50 <br />$ 23,732.50 <br />$ 23,732.50 <br />100.00% <br />$ - <br />05-5120 <br />5A <br />Steel Supplier -Metal Fabrication <br />$ 26,118.12 <br />$ - <br />$ - <br />$ 26,118.12 <br />$ 26,118.12 <br />$ 26,118.12 <br />100.00% <br />$ - <br />05-5120 <br />5A <br />CO#1 RFI#21 <br />$ - <br />$ - <br />$ 1,034.74 <br />$ 1,034.74 <br />$ 1,034.74 <br />$ 1,034.74 <br />100.00% <br />$ - <br />05-5120 <br />5A <br />CO#2 PR#08 <br />$ - <br />$ - <br />$ (2,858.00) <br />$ (2,858.00) <br />$ (2,858.00) <br />$ (2,858.00) <br />100.00% <br />$ - <br />05-5120 <br />5A <br />CO#3 PR#1R <br />$ - <br />$ - <br />$ 2,253.00 <br />$ 2,253.00 <br />$ 2,253.00 <br />$ 2,253.00 <br />100.00% <br />$ - <br />05-5120 <br />5A <br />CO#4 RFI#36 <br />$ - <br />$ - <br />$ 541.38 <br />$ 541.38 <br />$ 541.38 <br />$ 541.38 <br />100.00% <br />$ - <br />05-5120 <br />5A <br />CO#5 ASI 13 <br />$ - <br />$ - <br />$ 575.00 <br />$ 575.00 <br />$ 575.00 <br />$ 575.00 <br />100.00% <br />$ - <br />05-5120 <br />5A <br />CO#6 RFI#97 <br />$ - <br />$ - <br />$ 1,776.00 <br />$ 1,776.00 <br />$ 1,776.00 <br />$ 1,776.00 <br />100.00% <br />$ - <br />05-5120 <br />5A <br />CO#7 RFI#21 <br />$ <br />$ - <br />$ 495.00 <br />$ 495.00 <br />$ 495.00 <br />$ 495.00 <br />100.00% <br />$ - <br />05-5120 <br />5A <br />CO#8 Expedited Shipping <br />$ - <br />$ - <br />$ 700.00 <br />$ 700.00 <br />$ 700.00 <br />$ 700.00 <br />100.00% <br />$ - <br />05-5120 <br />5A <br />CO#9 PR#17 <br />$ - <br />$ - <br />$ 2,898.00 <br />$ 2,898.00 <br />$ 2,898.00 <br />$ 2,898.00 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />PD- Structural Steel <br />Labor <br />$ 8,362.00 <br />$ - <br />$ - <br />$ 8,362.00 <br />$ 8,362.00 <br />$ 8,362.00 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />PD-Steel Joist <br />Labor <br />$ 6,500.00 <br />$ - <br />$ - <br />$ 6,500.00 <br />$ 6,500.00 <br />$ 6,500.00 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />PD-Steel Roof Deck <br />Labor <br />$ 7,500.00 <br />$ - <br />$ - <br />$ 7,500.00 <br />$ 7,500.00 <br />$ 7,500.00 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />PD-Metal Fab <br />Labor <br />$ 4,500.00 <br />$ - <br />$ - <br />$ 4,500.00 <br />$ 4,500.00 <br />$ 4,500.00 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />PD-Metal Stairs <br />Labor <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />05-5121 <br />5B <br />PD- Pipe&Tube Railings <br />Labor <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />05-5121 <br />5B <br />FD- Structural Steel <br />Labor <br />$ 2,780.00 <br />$ - <br />$ - <br />$ 2,780.00 <br />$ 2,780.00 <br />$ 2,780.00 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />FD - Steel Joist <br />Labor <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />FD - Steel Roof Deck <br />Labor <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />FD - Metal Fab <br />Labor <br />$ 1,750.00 <br />$ - <br />$ - <br />$ 1,750.00 <br />$ 1,750.00 <br />$ 1,750.00 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />FD - Metal Stairs <br />Labor <br />$ 1,600.00 <br />$ - <br />$ - <br />$ 1,600.00 <br />$ 1,600.00 <br />$ 1,600.00 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />FD- Pipe&Tube Railings <br />Labor <br />$ 1,500.00 <br />$ - <br />$ - <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />Bond <br />$ 658.00 <br />$ - <br />$ - <br />$ 658.00 <br />$ 658.00 <br />$ 658.00 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />CO#1 PR#08 <br />$ <br />$ - <br />$ 619.14 <br />$ 619.14 <br />$ 619.14 <br />$ 619.14 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />CO#3 Joist Pockets <br />$ - <br />$ - <br />$ 482.76 <br />$ 482.76 <br />$ 482.76 <br />$ 482.76 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />CO#2 PR#1R <br />$ - <br />$ - <br />$ 1,721.04 <br />$ 1,721.04 <br />$ 1,721.04 <br />$ 1,721.04 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />CO#4 RFI#36 <br />$ - <br />$ - <br />$ 309.57 <br />$ 309.57 <br />$ 309.57 <br />$ 309.57 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />CO#5 RFI#78 Added Crane Mob <br />$ - <br />$ - <br />$ 675.00 <br />$ 675.00 <br />$ 675.00 <br />$ 675.00 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />CO#6 Plug Weld <br />$ - <br />$ - <br />$ 1,355.80 <br />$ 1,355.80 <br />$ 1,355.80 <br />$ 1,355.80 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />CO#7 RFI#124 <br />$ <br />$ - <br />$ (825.52) <br />$ (825.52) <br />$ (825.52) <br />$ (825.52) <br />100.00% <br />$ - <br />05-5121 <br />5B <br />CO#8 PR#17 <br />$ - <br />$ - <br />$ 2,712.56 <br />$ 2,712.56 <br />$ 2,712.56 <br />$ 2,712.56 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />CO#9 RFI#101 <br />$ - <br />$ - <br />$ 412.76 <br />$ 412.76 <br />$ 412.76 <br />$ 412.76 <br />100.00% <br />$ - <br />05-5121 <br />5B <br />CO#10 Field Fab Shim Plates at GL P/1 & P/3 <br />$ - <br />$ - <br />$ 309.57 <br />$ 309.57 <br />$ 309.57 <br />$ 309.57 <br />100.00% <br />$ - <br />06-6100 <br />6A <br />Area A FDAddition Envelop <br />$ 11,000.00 <br />$ - <br />$ - <br />$ 11,000.00 <br />$ 11,000.00 <br />$ 11,000.00 <br />100.00% <br />$ - <br />06-6100 <br />6A <br />Area A FDAddition Interior <br />$ 10,200.00 <br />$ - <br />$ - <br />$ 10,200.00 <br />$ 10,200.00 <br />$ 10,200.00 <br />100.00% <br />$ - <br />06-6100 <br />6A <br />Area A FD Renovation <br />$ 17,000.00 <br />$ - <br />$ - <br />$ 17,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 17,000.00 <br />$ 62.27 <br />$ (140.83 <br />$ 13,041.30 <br />$ 885.00 <br />N. <br />2,050.00 <br />1,759.00 <br />18.55 <br />116.00 <br />(24.14 <br />293.80 <br />88.05 <br />34.55 <br />2,558.09 <br />2,696.88 <br />1,186.63 <br />1,305.91 <br />51.74 <br />(142.90 <br />112.65 <br />27.07 <br />28.75 <br />88.80 <br />24.75 <br />35.00 <br />144.90 <br />418.10 <br />325.00 <br />375.00 <br />225.00 <br />139.00 <br />100.00 <br />200.00 <br />87.50 <br />80.00 <br />75.00 <br />32.90 <br />30.96 <br />24.14 <br />86.05 <br />15.48 <br />33.75 <br />67.79 <br />(41.28 <br />135.63 <br />20.64 <br />15.48 <br />550.00 <br />510.00 <br />