Laserfiche WebLink
Terra Tara Project Number 20.705 <br />ffENa O k River F re Station#3 <br />iGON5TRIJG City of Elk River <br />CONTINUATION SHEET AIA DOCUMENTG703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 9 <br />Contractor's signed certification is attached. APPLICATION DATE: 10/31/21 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 10/31/21 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm -Concrete Piping/Manholes Labor <br />$ 10,155.38 <br />$ - <br />$ - <br />$ 10,155.38 <br />$ 10,155.38 <br />$ 10,155.38 <br />100.00% <br />$ - <br />$ 507.77 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm -Concrete Piping/Manholes Material <br />$ 27,063.60 <br />$ - <br />$ - <br />$ 27,063.60 <br />$ 27,063.60 <br />$ 27,063.60 <br />100.00% <br />$ - <br />$ 1,353.18 <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm - Castings/Grates Labor <br />$ 3,152.40 <br />$ - <br />$ - <br />$ 3,152.40 <br />$ - <br />$ - <br />0.00% <br />$ 3,152.40 <br />$ - <br />Dryden Excavating <br />31-1000 <br />33A <br />Storm - Castings/Grates Material <br />$ 52,068.00 <br />$ - <br />$ - <br />$ 52,068.00 <br />$ 6,074.24 <br />$ 1,000.00 <br />$ 7,074.24 <br />13.59% <br />$ 44,993.76 <br />$ 353.71 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#1 Additional Construction Entrances <br />$ - <br />$ - <br />$ 4,246.61 <br />$ 4,246.61 <br />$ 4,246.61 <br />$ 4,246.61 <br />100.00% <br />$ - <br />$ 212.33 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#2 PR#7 Water Service <br />$ - <br />$ - <br />$ (1,517.19) <br />$ (1,517.19) <br />$ (1,517.19) <br />$ (1,517.19) <br />100.00% <br />$ - <br />$ (75.86) <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#3 PR#4 Stepped Footings <br />$ - <br />$ - <br />$ 1,584.00 <br />$ 1,584.00 <br />$ 1,584.00 <br />$ 1,584.00 <br />100.00% <br />$ - <br />$ 79.20 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#4 ASI#2 <br />$ - <br />$ - <br />$ 6,096.75 <br />$ 6,096.75 <br />$ 6,096.75 <br />$ 6,096.75 <br />100.00% <br />$ - <br />$ 304.84 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#5 B/C Thomsen <br />$ - <br />$ - <br />$ (500.00) <br />$ (500.00) <br />$ (500.00) <br />$ (500.00) <br />100.00% <br />$ - <br />$ (25.00) <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#6 Overexcavate Footing Trenches for Rock <br />$ - <br />$ - <br />$ 2,373.26 <br />$ 2,373.26 <br />$ 2,373.26 <br />$ 2,373.26 <br />100.00% <br />$ - <br />$ 118.66 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#7 Furnish and Install 3'' Rock for Pump Truck <br />$ - <br />$ - <br />$ 5,409.16 <br />$ 5,409.16 <br />$ 5,409.16 <br />$ 5,409.16 <br />100.00% <br />$ - <br />$ 270.46 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#8 Install Temp Drain Pipe <br />$ - <br />$ - <br />$ 5,894.96 <br />$ 5,894.96 <br />$ 5,894.96 <br />$ 5,894.96 <br />100.00% <br />$ - <br />$ 294.75 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#9 C-900 Municipal Water Piping <br />$ - <br />$ - <br />$ 278.65 <br />$ 278.65 <br />$ 278.65 <br />$ 278.65 <br />100.00% <br />$ - <br />$ 13.93 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#10 Damaged Transformer- repaired by ERMU <br />$ - <br />$ - <br />$ (3,273.92) <br />$ (3,273.92) <br />$ (3,273.92) <br />$ (3,273.92) <br />100.00% <br />$ - <br />$ (163.70) <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#11 Crushed Concrete Entrance <br />$ - <br />$ - <br />$ 3,935.75 <br />$ 3,935.75 <br />$ 3,935.75 <br />$ 3,935.75 <br />100.00% <br />$ - <br />$ 196.79 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#12 Revised Finished Grade at Trash Enclosure <br />$ - <br />$ - <br />$ 962.50 <br />$ 962.50 <br />$ - <br />$ 962.50 <br />$ 962.50 <br />100.00% <br />$ - <br />$ 48.13 <br />Dryden Excavating <br />31-1000 <br />33A <br />CO#13 Soil Correction South Parking Lot <br />$ - <br />$ - <br />$ 6,917.00 <br />$ 6,917.00 <br />$ - <br />$ 6,917.00 <br />$ 6,917.00 <br />100.00% <br />$ - <br />$ 345.85 <br />Omann Brothers <br />32-1216 <br />32C <br />Gravel Base <br />$ 16,920.00 <br />$ - <br />$ - <br />$ 16,920.00 <br />$ - <br />$ 16,920.00 <br />$ 16,920.00 <br />100.00% <br />$ - <br />$ 846.00 <br />Omann Brothers <br />32-1216 <br />32C <br />Bit Base Course <br />$ 25,370.00 <br />$ - <br />$ - <br />$ 25,370.00 <br />$ - <br />$ - <br />0.00% <br />$ 25,370.00 <br />$ - <br />Omann Brothers <br />32-1216 <br />32C <br />Bit Wear Course <br />$ 27,700.00 <br />$ - <br />$ - <br />$ 27,700.00 <br />$ - <br />$ - <br />0.00% <br />$ 27,700.00 <br />$ - <br />Omann Brothers <br />32-1216 <br />32C <br />Striping <br />$ 500.00 <br />$ - <br />$ - <br />$ 500.00 <br />$ - <br />$ - <br />0.00% <br />$ 500.00 <br />$ - <br />Omann Brothers <br />32-1216 <br />32C <br />CO#1 PR#7 Water Service <br />$ - <br />$ - <br />$ (850.00) <br />$ (850.00) <br />$ - <br />$ - <br />0.00% <br />$ (850.00) <br />$ - <br />Omann Brothers <br />32-1216 <br />32C <br />CO#2 Agg Base at intersection of 191st and Edision <br />$ - <br />$ - <br />$ (845.28) <br />$ (845.28) <br />$ - <br />$ - <br />0.00% <br />$ (845.28) <br />$ - <br />Peterson Companies <br />32-4000 <br />32A <br />Fencing <br />$ 4,485.00 <br />$ - <br />$ - <br />$ 4,485.00 <br />$ - <br />$ - <br />0.00% <br />$ 4,485.00 <br />$ - <br />Autumn Ridge <br />32-3291 <br />32B <br />Landscaping <br />$ 68,500.00 <br />$ - <br />$ - <br />$ 68,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 68,500.00 <br />$ - <br />GRANDTOTAIS $ 6,898,246.00 $ - $ (0.00) $ 6,898,246.00 $ 2,672,186.63 $ 674,561.26 $ - $ 3,346,747.89 48.52% $ 3,551,498.11 $ 167,337.39 <br />Page8/8 <br />