Laserfiche WebLink
in Electric <br />16-1600 <br />26A <br />CO#22 T&M Underground Work at PD <br />$ - <br />$ - <br />$ 1,206.00 <br />$ 1,206.00 <br />$ 1,206.00 <br />$ 1,206.00 <br />in Electric <br />16-1600 <br />26A <br />CO#23 RFI#160 Power Disconnect at PD N Fan <br />$ - <br />$ - <br />$ 283.00 <br />$ 283.00 <br />$ 283.00 <br />$ 283.00 <br />in Electric <br />16-1600 <br />26A <br />CO#24 RFI#152 Added Demo & Cabinet Demo <br />$ - <br />$ - <br />$ 2,000.00 <br />$ 2,000.00 <br />$ - <br />$ 2,000.00 <br />$ 2,000.00 <br />in Electric <br />16-1600 <br />26A <br />CO#25 ASI#15 Update HP-1 Feed Location <br />$ - <br />$ - <br />$ (377.00) <br />$ (377.00) <br />$ (377.00) <br />$ (377.00 <br />in Electric <br />16-1600 <br />26A <br />CO#26 Replace Lights in Swat Bay 171 <br />$ - <br />$ - <br />$ 3,583.00 <br />$ 3,583.00 <br />$ - <br />$ 2,087.00 <br />$ 2,087.00 <br />in Electric <br />16-1600 <br />26A <br />CO#27 Furinsh & Install 18' Light Pole at PD <br />$ - <br />$ - <br />$ 1,990.00 <br />$ 1,990.00 <br />$ - <br />$ - <br />inElectric <br />16-1600 <br />26A <br />CO#28 PR#29 Relocated Power for Air Compressor <br />$ - <br />$ - <br />$ 2,539.00 <br />$ 2,539.00 <br />$ - <br />$ 2,539.00 <br />$ 2,539.00 <br />in Electric <br />16-1600 <br />26A <br />CO#29 Add to Install Light in Mail Room 152 <br />$ - <br />$ - <br />$ 532.00 <br />$ 532.00 <br />$ - <br />$ - <br />in Electric <br />16-1600 <br />26A <br />CO#30 PR#19 Electrical & Fire Alarm Changes <br />$ - <br />$ - <br />$ 9,223.00 <br />$ 9,223.00 <br />$ - <br />$ - <br />in Electric <br />16-1600 <br />26A <br />CO#31 PR#31 Upsize the SCBA Compressor <br />$ - <br />$ - <br />$ 1,965.00 <br />$ 1,965.00 <br />$ - <br />$ 1,769.00 <br />$ 1,769.00 <br />in Electric <br />16-1600 <br />26A <br />CO#32 RFI#188 Install Outlet in Office 106 <br />$ - <br />$ - <br />$ 258.00 <br />$ 258.00 <br />$ - <br />$ 258.00 <br />$ 258.00 <br />in Electric <br />16-1600 <br />26A <br />CO#33 RFI#90 Provide Racewayfor Garage Door <br />$ - <br />$ - <br />$ 2,536.00 <br />$ 2,536.00 <br />$ - <br />$ 507.00 <br />$ 507.00 <br />,v Look <br />31-1000 <br />31A <br />Mobilization <br />$ 27,400.00 <br />$ - <br />$ - <br />$ 27,400.00 <br />$ 27,400.00 <br />$ 27,400.00 <br />,v Look <br />31-1000 <br />31A <br />Locates, Permits, Surveys <br />$ 17,380.00 <br />$ - <br />$ - <br />$ 17,380.00 <br />$ 17,380.00 <br />$ 17,380.00 <br />,v Look <br />31-1000 <br />31A <br />Erosion Control <br />$ 4,840.00 <br />$ - <br />$ - <br />$ 4,840.00 <br />$ 4,840.00 <br />$ 4,840.00 <br />,v Look <br />31-1000 <br />31A <br />EC Materials <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />,v Look <br />31-1000 <br />31A <br />Removals <br />$ 15,750.00 <br />$ - <br />$ - <br />$ 15,750.00 <br />$ 15,750.00 <br />$ 15,750.00 <br />,v Look <br />31-1000 <br />31A <br />Temp Agg Base <br />$ 6,350.00 <br />$ - <br />$ - <br />$ 6,350.00 <br />$ 6,350.00 <br />$ 6,350.00 <br />,v Look <br />31-1000 <br />31A <br />Grading <br />$ 15,980.00 <br />$ - <br />$ - <br />$ 15,980.00 <br />$ 15,980.00 <br />$ 15,980.00 <br />,v Look <br />31-1000 <br />31A <br />Sand Import <br />$ 2,332.00 <br />$ - <br />$ - <br />$ 2,332.00 <br />$ 2,332.00 <br />$ 2,332.00 <br />,v Look <br />31-1000 <br />31A <br />Soil Correction <br />$ 17,885.00 <br />$ - <br />$ - <br />$ 17,885.00 <br />$ 17,885.00 <br />$ 17,885.00 <br />,v Look <br />31-1000 <br />31A <br />Structure Exc <br />$ 39,240.00 <br />$ - <br />$ - <br />$ 39,240.00 <br />$ 39,240.00 <br />$ 39,240.00 <br />,v Look <br />31-1000 <br />31A <br />Topsoil <br />$ 14,300.00 <br />$ - <br />$ - <br />$ 14,300.00 <br />$ 7,150.00 <br />$ 7,150.00 <br />,v Look <br />31-1000 <br />31A <br />Fine Grading <br />$ 11,943.00 <br />$ - <br />$ - <br />$ 11,943.00 <br />$ 5,972.00 <br />$ 5,972.00 <br />,v Look <br />31-1000 <br />31A <br />CO#1 PR#2R Grade Prep <br />$ - <br />$ - <br />$ 290.79 <br />$ 290.79 <br />$ 290.79 <br />$ 290.79 <br />,v Look <br />31-1000 <br />31A <br />CO#2 PR#03 <br />$ - <br />$ - <br />$ 477.79 <br />$ 477.79 <br />$ 477.79 <br />$ 477.79 <br />,v Look <br />31-1000 <br />31A <br />CO#3 ASI1 <br />$ - <br />$ - <br />$ 11,031.51 <br />$ 11,031.51 <br />$ 11,031.51 <br />$ 11,031.51 <br />,v Look <br />31-1000 <br />31A <br />CO#4 T&M Class 5 Entrances <br />$ - <br />$ - <br />$ 1,345.00 <br />$ 1,345.00 <br />$ 1,345.00 <br />$ 1,345.00 <br />,v Look <br />31-1000 <br />31A <br />CO#5 Wellfield Excavation <br />$ - <br />$ - <br />$ 1,082.79 <br />$ 1,082.79 <br />$ 1,082.79 <br />$ 1,082.79 <br />,v Look <br />31-1000 <br />31A <br />CO#6 Frost Removal <br />$ - <br />$ - <br />$ 1,552.00 <br />$ 1,552.00 <br />$ 1,552.00 <br />$ 1,552.00 <br />,v Look <br />31-1000 <br />31A <br />CO#7 PR#20 <br />$ - <br />$ - <br />$ 3,454.65 <br />$ 3,454.65 <br />$ 3,454.65 <br />$ 3,454.65 <br />,v Look <br />31-1000 <br />31A <br />CO#8 Gate Arm Panel <br />$ - <br />$ - <br />$ 3,861.00 <br />$ 3,861.00 <br />$ 3,861.00 <br />$ 3,861.00 <br />,v Look <br />31-1000 <br />31A <br />CO#9 Add to Furnish Quazite Box <br />$ - <br />$ - <br />$ 850.00 <br />$ 850.00 <br />$ - <br />$ 850.00 <br />$ 850.00 <br />Ier Fence <br />32-4000 <br />32A <br />Fencing <br />$ 120,375.00 <br />$ - <br />$ (22,247.00) <br />$ 98,128.00 <br />$ 98,128.00 <br />$ 98,128.00 <br />Ier Fence <br />32-4000 <br />32A <br />CO#1 F&I Stop Go Light PR#22 <br />$ - <br />$ - <br />$ 1,685.00 <br />$ 1,685.00 <br />$ 1,685.00 <br />$ 1,685.00 <br />Ier Fence <br />32-4000 <br />32A <br />CO#2 PR#28 Demo & Restore County Fence <br />$ - <br />$ - <br />$ 3,424.00 <br />$ 3,424.00 <br />$ 3,424.00 <br />$ 3,424.00 <br />Ier Fence <br />32-4000 <br />32A <br />CO#3 Add to Modify PD Operable Gate Per Owner Request <br />$ - <br />$ - <br />$ 8,837.00 <br />$ 8,837.00 <br />$ - <br />$ - <br />umn Ridge <br />32-3291 <br />32B <br />Landscaping <br />$ 42,980.00 <br />$ - <br />$ 3,673.56 <br />$ 46,653.56 <br />$ 46,653.56 <br />$ 46,653.56 <br />iminous Roadways <br />32-1216 <br />32C <br />Asphalt <br />$ 144,740.00 <br />$ - <br />$ - <br />$ 144,740.00 <br />$ 95,740.00 <br />$ 49,000.00 <br />$ 144,740.00 <br />iminous Roadways <br />32-1216 <br />32C <br />CO#1 ASI1 <br />$ - <br />$ - <br />$ 3,110.00 <br />$ 3,110.00 <br />$ - <br />$ 3,110.00 <br />$ 3,110.00 <br />iminous Roadways <br />32-1216 <br />32C <br />CO#2 PR#20 <br />$ - <br />$ - <br />$ 7,650.00 <br />$ 7,650.00 <br />$ - <br />$ 7,650.00 <br />$ 7,650.00 <br />iminous Roadways <br />32-1216 <br />32C <br />CO#3 Added temp Striping <br />$ - <br />$ - <br />$ 750.00 <br />$ 750.00 <br />$ - <br />$ 750.00 <br />$ 750.00 <br />iminous Roadways <br />32-1216 <br />32C <br />CO#4 Add mill & overlay <br />$ - <br />$ - <br />$ 36,600.00 <br />$ 36,600.00 <br />$ - <br />$ 36,600.00 <br />$ 36,600.00 <br />iminous Roadways <br />32-1216 <br />32C <br />CO#S Trail Along Orono Parkway <br />$ - <br />$ - <br />$ 750.00 <br />$ 750.00 <br />$ - <br />$ 750.00 <br />$ 750.00 <br />iminous Roadways <br />32-1216 <br />32C <br />CO#6 Add Pavement Striping at PD Operable Gate <br />$ - <br />$ - <br />$ 400.00 <br />$ 400.00 <br />$ - <br />$ 400.00 <br />$ 400.00 <br />Paul Utilities <br />31-3123 <br />33A <br />Water Main Labor <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />Paul Utilities <br />31-3123 <br />33A <br />Water Main Material <br />$ 10,000.00 <br />$ - <br />$ - <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />Paul Utilities <br />31-3123 <br />33A <br />Storm Sewer Labor <br />$ 29,000.00 <br />$ - <br />$ - <br />$ 29,000.00 <br />$ 29,000.00 <br />$ 29,000.00 <br />Paul Utilities <br />31-3123 <br />33A <br />Storm Sewer Material <br />$ 25,000.00 <br />$ - <br />$ - <br />$ 25,000.00 <br />$ 25,000.00 <br />$ 25,000.00 <br />Paul Utilities <br />31-3123 <br />33A <br />CO#1 PR#10 <br />$ - <br />$ - <br />$ 2,800.00 <br />$ 2,800.00 <br />$ 2,800.00 <br />$ 2,800.00 <br />Paul Utilities <br />31-3123 <br />33A <br />CO#2 PR#13 Storm Sewer <br />$ - <br />$ - <br />$ 5,560.00 <br />$ 5,560.00 <br />$ 5,560.00 <br />$ 5,560.00 <br />Paul Utilities <br />31-3123 <br />33A <br />CO#3 Add to jet outforzen storm line <br />$ <br />$ - <br />$ 1,650.00 <br />$ 1,650.00 <br />$ 1,650.00 <br />$ 1,650.00 <br />Paul Utilities <br />31-3123 <br />33A <br />CO#416" WM in Lieu of 8" <br />$ - <br />$ - <br />$ 3,450.00 <br />$ 3,450.00 <br />$ 3,450.00 <br />$ 3,450.00 <br />Paul Utilities <br />31-3123 <br />33A <br />CO#5 PR#25 Storm Sewer <br />$ - <br />$ - <br />$ 5,175.00 <br />$ 5,175.00 <br />$ 5,175.00 <br />$ 5,175.00 <br />Paul Utilities <br />31-3123 <br />33A <br />CO#6Vac Truck <br />$ - <br />$ - <br />$ 1,938.75 <br />$ 1,938.75 <br />$ 1,938.75 <br />$ 1,938.75 <br />Paul Utilities <br />31-3123 <br />33A <br />CO#7 Deeper Water Connection <br />$ - <br />$ - <br />$ 3,678.00 <br />$ 3,678.00 <br />$ 3,678.00 <br />$ 3,678.00 <br />GRANDTOTALS <br />$ 6,290,219.00 <br />$ - <br />$ 78,765.42 <br />$ 6,368,984.42 <br />$ 5,681,931.94 <br />$ 332,749.13 <br />$ - <br />$ 6,014,681.07 <br />$ 1,496.00 $ <br />$ 1,990.00 $ <br />$ 532.00 $ <br />$ 9,223.00 $ <br />$ 196.00 $ <br />$ 2,029.00 $ <br />$ 7,150.00 $ <br />$ 5,971.00 $ <br />$ $ <br />$ 8,837.00 $ <br />60.30 <br />14.15 <br />100.00 <br />(18.85 <br />104.35 <br />iil7L•P. <br />88.45 <br />12.90 <br />25.35 <br />1,370.00 <br />869.00 <br />242.00 <br />200.00 <br />787.50 <br />317.50 <br />799.00 <br />116.60 <br />894.25 <br />1,962.00 <br />357.50 <br />298.60 <br />14.54 <br />23.89 <br />551.58 <br />67.25 <br />54.14 <br />77.60 <br />172.73 <br />193.05 <br />42.50 <br />4,906.40 <br />84.25 <br />171.20 <br />7,237.00 <br />155.50 <br />382.50 <br />37.50 <br />1,830.00 <br />37.50 <br />20.00 <br />1,000.00 <br />500.00 <br />1,450.00 <br />1,250.00 <br />140.00 <br />278.00 <br />82.50 <br />172.50 <br />258.75 <br />96.94 <br />183.90 <br />300,734.05 <br />