in Electric
<br />16-1600
<br />26A
<br />CO#22 T&M Underground Work at PD
<br />$ -
<br />$ -
<br />$ 1,206.00
<br />$ 1,206.00
<br />$ 1,206.00
<br />$ 1,206.00
<br />in Electric
<br />16-1600
<br />26A
<br />CO#23 RFI#160 Power Disconnect at PD N Fan
<br />$ -
<br />$ -
<br />$ 283.00
<br />$ 283.00
<br />$ 283.00
<br />$ 283.00
<br />in Electric
<br />16-1600
<br />26A
<br />CO#24 RFI#152 Added Demo & Cabinet Demo
<br />$ -
<br />$ -
<br />$ 2,000.00
<br />$ 2,000.00
<br />$ -
<br />$ 2,000.00
<br />$ 2,000.00
<br />in Electric
<br />16-1600
<br />26A
<br />CO#25 ASI#15 Update HP-1 Feed Location
<br />$ -
<br />$ -
<br />$ (377.00)
<br />$ (377.00)
<br />$ (377.00)
<br />$ (377.00
<br />in Electric
<br />16-1600
<br />26A
<br />CO#26 Replace Lights in Swat Bay 171
<br />$ -
<br />$ -
<br />$ 3,583.00
<br />$ 3,583.00
<br />$ -
<br />$ 2,087.00
<br />$ 2,087.00
<br />in Electric
<br />16-1600
<br />26A
<br />CO#27 Furinsh & Install 18' Light Pole at PD
<br />$ -
<br />$ -
<br />$ 1,990.00
<br />$ 1,990.00
<br />$ -
<br />$ -
<br />inElectric
<br />16-1600
<br />26A
<br />CO#28 PR#29 Relocated Power for Air Compressor
<br />$ -
<br />$ -
<br />$ 2,539.00
<br />$ 2,539.00
<br />$ -
<br />$ 2,539.00
<br />$ 2,539.00
<br />in Electric
<br />16-1600
<br />26A
<br />CO#29 Add to Install Light in Mail Room 152
<br />$ -
<br />$ -
<br />$ 532.00
<br />$ 532.00
<br />$ -
<br />$ -
<br />in Electric
<br />16-1600
<br />26A
<br />CO#30 PR#19 Electrical & Fire Alarm Changes
<br />$ -
<br />$ -
<br />$ 9,223.00
<br />$ 9,223.00
<br />$ -
<br />$ -
<br />in Electric
<br />16-1600
<br />26A
<br />CO#31 PR#31 Upsize the SCBA Compressor
<br />$ -
<br />$ -
<br />$ 1,965.00
<br />$ 1,965.00
<br />$ -
<br />$ 1,769.00
<br />$ 1,769.00
<br />in Electric
<br />16-1600
<br />26A
<br />CO#32 RFI#188 Install Outlet in Office 106
<br />$ -
<br />$ -
<br />$ 258.00
<br />$ 258.00
<br />$ -
<br />$ 258.00
<br />$ 258.00
<br />in Electric
<br />16-1600
<br />26A
<br />CO#33 RFI#90 Provide Racewayfor Garage Door
<br />$ -
<br />$ -
<br />$ 2,536.00
<br />$ 2,536.00
<br />$ -
<br />$ 507.00
<br />$ 507.00
<br />,v Look
<br />31-1000
<br />31A
<br />Mobilization
<br />$ 27,400.00
<br />$ -
<br />$ -
<br />$ 27,400.00
<br />$ 27,400.00
<br />$ 27,400.00
<br />,v Look
<br />31-1000
<br />31A
<br />Locates, Permits, Surveys
<br />$ 17,380.00
<br />$ -
<br />$ -
<br />$ 17,380.00
<br />$ 17,380.00
<br />$ 17,380.00
<br />,v Look
<br />31-1000
<br />31A
<br />Erosion Control
<br />$ 4,840.00
<br />$ -
<br />$ -
<br />$ 4,840.00
<br />$ 4,840.00
<br />$ 4,840.00
<br />,v Look
<br />31-1000
<br />31A
<br />EC Materials
<br />$ 4,000.00
<br />$ -
<br />$ -
<br />$ 4,000.00
<br />$ 4,000.00
<br />$ 4,000.00
<br />,v Look
<br />31-1000
<br />31A
<br />Removals
<br />$ 15,750.00
<br />$ -
<br />$ -
<br />$ 15,750.00
<br />$ 15,750.00
<br />$ 15,750.00
<br />,v Look
<br />31-1000
<br />31A
<br />Temp Agg Base
<br />$ 6,350.00
<br />$ -
<br />$ -
<br />$ 6,350.00
<br />$ 6,350.00
<br />$ 6,350.00
<br />,v Look
<br />31-1000
<br />31A
<br />Grading
<br />$ 15,980.00
<br />$ -
<br />$ -
<br />$ 15,980.00
<br />$ 15,980.00
<br />$ 15,980.00
<br />,v Look
<br />31-1000
<br />31A
<br />Sand Import
<br />$ 2,332.00
<br />$ -
<br />$ -
<br />$ 2,332.00
<br />$ 2,332.00
<br />$ 2,332.00
<br />,v Look
<br />31-1000
<br />31A
<br />Soil Correction
<br />$ 17,885.00
<br />$ -
<br />$ -
<br />$ 17,885.00
<br />$ 17,885.00
<br />$ 17,885.00
<br />,v Look
<br />31-1000
<br />31A
<br />Structure Exc
<br />$ 39,240.00
<br />$ -
<br />$ -
<br />$ 39,240.00
<br />$ 39,240.00
<br />$ 39,240.00
<br />,v Look
<br />31-1000
<br />31A
<br />Topsoil
<br />$ 14,300.00
<br />$ -
<br />$ -
<br />$ 14,300.00
<br />$ 7,150.00
<br />$ 7,150.00
<br />,v Look
<br />31-1000
<br />31A
<br />Fine Grading
<br />$ 11,943.00
<br />$ -
<br />$ -
<br />$ 11,943.00
<br />$ 5,972.00
<br />$ 5,972.00
<br />,v Look
<br />31-1000
<br />31A
<br />CO#1 PR#2R Grade Prep
<br />$ -
<br />$ -
<br />$ 290.79
<br />$ 290.79
<br />$ 290.79
<br />$ 290.79
<br />,v Look
<br />31-1000
<br />31A
<br />CO#2 PR#03
<br />$ -
<br />$ -
<br />$ 477.79
<br />$ 477.79
<br />$ 477.79
<br />$ 477.79
<br />,v Look
<br />31-1000
<br />31A
<br />CO#3 ASI1
<br />$ -
<br />$ -
<br />$ 11,031.51
<br />$ 11,031.51
<br />$ 11,031.51
<br />$ 11,031.51
<br />,v Look
<br />31-1000
<br />31A
<br />CO#4 T&M Class 5 Entrances
<br />$ -
<br />$ -
<br />$ 1,345.00
<br />$ 1,345.00
<br />$ 1,345.00
<br />$ 1,345.00
<br />,v Look
<br />31-1000
<br />31A
<br />CO#5 Wellfield Excavation
<br />$ -
<br />$ -
<br />$ 1,082.79
<br />$ 1,082.79
<br />$ 1,082.79
<br />$ 1,082.79
<br />,v Look
<br />31-1000
<br />31A
<br />CO#6 Frost Removal
<br />$ -
<br />$ -
<br />$ 1,552.00
<br />$ 1,552.00
<br />$ 1,552.00
<br />$ 1,552.00
<br />,v Look
<br />31-1000
<br />31A
<br />CO#7 PR#20
<br />$ -
<br />$ -
<br />$ 3,454.65
<br />$ 3,454.65
<br />$ 3,454.65
<br />$ 3,454.65
<br />,v Look
<br />31-1000
<br />31A
<br />CO#8 Gate Arm Panel
<br />$ -
<br />$ -
<br />$ 3,861.00
<br />$ 3,861.00
<br />$ 3,861.00
<br />$ 3,861.00
<br />,v Look
<br />31-1000
<br />31A
<br />CO#9 Add to Furnish Quazite Box
<br />$ -
<br />$ -
<br />$ 850.00
<br />$ 850.00
<br />$ -
<br />$ 850.00
<br />$ 850.00
<br />Ier Fence
<br />32-4000
<br />32A
<br />Fencing
<br />$ 120,375.00
<br />$ -
<br />$ (22,247.00)
<br />$ 98,128.00
<br />$ 98,128.00
<br />$ 98,128.00
<br />Ier Fence
<br />32-4000
<br />32A
<br />CO#1 F&I Stop Go Light PR#22
<br />$ -
<br />$ -
<br />$ 1,685.00
<br />$ 1,685.00
<br />$ 1,685.00
<br />$ 1,685.00
<br />Ier Fence
<br />32-4000
<br />32A
<br />CO#2 PR#28 Demo & Restore County Fence
<br />$ -
<br />$ -
<br />$ 3,424.00
<br />$ 3,424.00
<br />$ 3,424.00
<br />$ 3,424.00
<br />Ier Fence
<br />32-4000
<br />32A
<br />CO#3 Add to Modify PD Operable Gate Per Owner Request
<br />$ -
<br />$ -
<br />$ 8,837.00
<br />$ 8,837.00
<br />$ -
<br />$ -
<br />umn Ridge
<br />32-3291
<br />32B
<br />Landscaping
<br />$ 42,980.00
<br />$ -
<br />$ 3,673.56
<br />$ 46,653.56
<br />$ 46,653.56
<br />$ 46,653.56
<br />iminous Roadways
<br />32-1216
<br />32C
<br />Asphalt
<br />$ 144,740.00
<br />$ -
<br />$ -
<br />$ 144,740.00
<br />$ 95,740.00
<br />$ 49,000.00
<br />$ 144,740.00
<br />iminous Roadways
<br />32-1216
<br />32C
<br />CO#1 ASI1
<br />$ -
<br />$ -
<br />$ 3,110.00
<br />$ 3,110.00
<br />$ -
<br />$ 3,110.00
<br />$ 3,110.00
<br />iminous Roadways
<br />32-1216
<br />32C
<br />CO#2 PR#20
<br />$ -
<br />$ -
<br />$ 7,650.00
<br />$ 7,650.00
<br />$ -
<br />$ 7,650.00
<br />$ 7,650.00
<br />iminous Roadways
<br />32-1216
<br />32C
<br />CO#3 Added temp Striping
<br />$ -
<br />$ -
<br />$ 750.00
<br />$ 750.00
<br />$ -
<br />$ 750.00
<br />$ 750.00
<br />iminous Roadways
<br />32-1216
<br />32C
<br />CO#4 Add mill & overlay
<br />$ -
<br />$ -
<br />$ 36,600.00
<br />$ 36,600.00
<br />$ -
<br />$ 36,600.00
<br />$ 36,600.00
<br />iminous Roadways
<br />32-1216
<br />32C
<br />CO#S Trail Along Orono Parkway
<br />$ -
<br />$ -
<br />$ 750.00
<br />$ 750.00
<br />$ -
<br />$ 750.00
<br />$ 750.00
<br />iminous Roadways
<br />32-1216
<br />32C
<br />CO#6 Add Pavement Striping at PD Operable Gate
<br />$ -
<br />$ -
<br />$ 400.00
<br />$ 400.00
<br />$ -
<br />$ 400.00
<br />$ 400.00
<br />Paul Utilities
<br />31-3123
<br />33A
<br />Water Main Labor
<br />$ 20,000.00
<br />$ -
<br />$ -
<br />$ 20,000.00
<br />$ 20,000.00
<br />$ 20,000.00
<br />Paul Utilities
<br />31-3123
<br />33A
<br />Water Main Material
<br />$ 10,000.00
<br />$ -
<br />$ -
<br />$ 10,000.00
<br />$ 10,000.00
<br />$ 10,000.00
<br />Paul Utilities
<br />31-3123
<br />33A
<br />Storm Sewer Labor
<br />$ 29,000.00
<br />$ -
<br />$ -
<br />$ 29,000.00
<br />$ 29,000.00
<br />$ 29,000.00
<br />Paul Utilities
<br />31-3123
<br />33A
<br />Storm Sewer Material
<br />$ 25,000.00
<br />$ -
<br />$ -
<br />$ 25,000.00
<br />$ 25,000.00
<br />$ 25,000.00
<br />Paul Utilities
<br />31-3123
<br />33A
<br />CO#1 PR#10
<br />$ -
<br />$ -
<br />$ 2,800.00
<br />$ 2,800.00
<br />$ 2,800.00
<br />$ 2,800.00
<br />Paul Utilities
<br />31-3123
<br />33A
<br />CO#2 PR#13 Storm Sewer
<br />$ -
<br />$ -
<br />$ 5,560.00
<br />$ 5,560.00
<br />$ 5,560.00
<br />$ 5,560.00
<br />Paul Utilities
<br />31-3123
<br />33A
<br />CO#3 Add to jet outforzen storm line
<br />$
<br />$ -
<br />$ 1,650.00
<br />$ 1,650.00
<br />$ 1,650.00
<br />$ 1,650.00
<br />Paul Utilities
<br />31-3123
<br />33A
<br />CO#416" WM in Lieu of 8"
<br />$ -
<br />$ -
<br />$ 3,450.00
<br />$ 3,450.00
<br />$ 3,450.00
<br />$ 3,450.00
<br />Paul Utilities
<br />31-3123
<br />33A
<br />CO#5 PR#25 Storm Sewer
<br />$ -
<br />$ -
<br />$ 5,175.00
<br />$ 5,175.00
<br />$ 5,175.00
<br />$ 5,175.00
<br />Paul Utilities
<br />31-3123
<br />33A
<br />CO#6Vac Truck
<br />$ -
<br />$ -
<br />$ 1,938.75
<br />$ 1,938.75
<br />$ 1,938.75
<br />$ 1,938.75
<br />Paul Utilities
<br />31-3123
<br />33A
<br />CO#7 Deeper Water Connection
<br />$ -
<br />$ -
<br />$ 3,678.00
<br />$ 3,678.00
<br />$ 3,678.00
<br />$ 3,678.00
<br />GRANDTOTALS
<br />$ 6,290,219.00
<br />$ -
<br />$ 78,765.42
<br />$ 6,368,984.42
<br />$ 5,681,931.94
<br />$ 332,749.13
<br />$ -
<br />$ 6,014,681.07
<br />$ 1,496.00 $
<br />$ 1,990.00 $
<br />$ 532.00 $
<br />$ 9,223.00 $
<br />$ 196.00 $
<br />$ 2,029.00 $
<br />$ 7,150.00 $
<br />$ 5,971.00 $
<br />$ $
<br />$ 8,837.00 $
<br />60.30
<br />14.15
<br />100.00
<br />(18.85
<br />104.35
<br />iil7L•P.
<br />88.45
<br />12.90
<br />25.35
<br />1,370.00
<br />869.00
<br />242.00
<br />200.00
<br />787.50
<br />317.50
<br />799.00
<br />116.60
<br />894.25
<br />1,962.00
<br />357.50
<br />298.60
<br />14.54
<br />23.89
<br />551.58
<br />67.25
<br />54.14
<br />77.60
<br />172.73
<br />193.05
<br />42.50
<br />4,906.40
<br />84.25
<br />171.20
<br />7,237.00
<br />155.50
<br />382.50
<br />37.50
<br />1,830.00
<br />37.50
<br />20.00
<br />1,000.00
<br />500.00
<br />1,450.00
<br />1,250.00
<br />140.00
<br />278.00
<br />82.50
<br />172.50
<br />258.75
<br />96.94
<br />183.90
<br />300,734.05
<br />
|